Records from 2007 to 2026. Most recent: inspection, 21 May 2026.
Documentation record
Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.5 ft
Registered tonnagegross 735 / net 735
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSOUTHWEST SHIPYARD LP · GALVESTON, TX, UNITED STATES · built 2007
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portBATON ROUGE, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 8 July 2026 · expires 31 August 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it735 - Simplified, Gross Ton
735 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 27
21 May 2026
Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8377967
16 July 2025
Administrative Inspection · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8187082
26 June 2024
Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7943053
28 November 2023
Bulk Liquid Transfer Monitor
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7830788
21 June 2023
Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7720207
5 May 2022
MTSA Verification · COI Inspection · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7440580
28 June 2021
Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7238223
28 April 2020
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6945203
25 April 2019
Periodic Inspection · Deficiency Check · MTSA/ISPS Verification · Administrative Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6670340
13 July 2018
Deficiency Check · Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6477848
1 March 2017
Cargo Tank Internal · Drydock Exam · Examination of Repairs · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6096284
17 May 2016
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5879731
21 April 2015
Periodic Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5107964
14 May 2014
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4874999
27 June 2013
Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4633341
5 March 2012
COI Inspection · Internal Structural Exam · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4256615
17 February 2011
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3946967
21 April 2010
Periodic Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3721469
15 May 2009
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3475691
21 October 2008
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3350113
21 October 2008
Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3353844
21 April 2008
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3188815
6 March 2008
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3159360
23 December 2007
Administrative Inspection
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3120238
2 August 2007
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3015565
28 February 2007
Initial Certification · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2879301
4 January 2007
Internal Structural Exam · Cargo Tank Internal · Hull Examination · Construction Oversight
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2850050
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 25 April 2019
Resolved
Repair railing where indicated.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 May 2019
Resolved 30 May 2019
Resolution: Railing repaired.
02 - Structural Conditions › N/A - No Subsystem › Cargo tank vent system
Issued 25 April 2019
Resolved
Replace flame screen on vent header.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 May 2019
Resolved 30 May 2019
Resolution: Riser replaced.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 13 July 2018
Resolved
P/V valves must be of an approved type under 46 CFR 162.017. Approval plate is missing from P/V Valve, provide verification of CG approval and affix to valve.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 August 2018
Resolved 30 July 2018
Resolution: Received photographic evidence of approval plate.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 18 April 2017
Resolved
Port vapor header pin was bent and in need of replacement.
Action required: 705 - Other - as specified
Due 18 April 2017
Resolved 20 April 2017
Resolution: Installed new pin.
Engineering › Steam System (main) › Valve, Relief
Issued 18 April 2017
Resolved
Pressure relief valve was cracked and not operable.
Condition: Improper/Lack of Maintenance
Due 20 April 2017
Resolved 20 April 2017
Resolution: Replaced with new pressure relief valve.
Deck/Cargo › Holds/Tanks › Ventilation Air Intake
Issued 18 April 2017
Resolved
Bow void gooseneck flame screens (02) not installed correctly.
Condition: Improper/Lack of Maintenance
Due 20 April 2017
Resolved 20 April 2017
Resolution: Replaced flame screens on bow void goosenecks.