Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
13462 - Convention (Subpart B), Gross Ton
11147 - Regulatory (Subpart C or D), Gross Ton
8791 - Convention (Subpart B), Net Ton
27023 - Dead Weight, Ton
11147 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-862268
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
19 February 2014MARPOL Annex VI Survey · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4799170
31 October 2012Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4476295
19 October 2012Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4467638
5 September 2012Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4433048
11 July 2012Administrative Inspection · Internal Structural Exam · Construction Oversight
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4375108
1 June 2012Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4331395
2 April 2012MARPOL Annex VI Survey · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4250309
29 January 2010MARPOL Annex I Examination · MTSA Verification · MARPOL Annex VI Survey · COI Inspection · MARPOL Annex II Examination · Initial Certification · Construction Oversight
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3672517
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 April 2026Resolved
Electrical installations in hazardous locations must comply with paragraph (b)(1), (2), or (3) of 46 CFR 111.105-3. The "PCR ROOM" weather tight door was found to be wasted and created the potential for vapors to enter a space with unapproved electrical appliances. Repair or replace door to MI satisfaction.
20APR2026 - Extended deficiency to be due by 17JUN2026. - SMH
46 CFR 31.35-1
46 CFR 111.105-3(b)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 June 2026
Resolved 9 June 2026
Resolution: Recieved SAT class report attesting to repairs.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 2 April 2025Resolved
Pitting was found in the fore peak tank on the third level behind against the watertight bulkhead to tank 1 on the port and starboard side aft of the anchor chain lockers. Gauge in the presence of a marine inspector.
Action required: 705 - Other - as specified
Resolved 9 April 2025
Resolution: Gauging was all sat.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 2 April 2025Resolved
A pitted weld in the 2 starboard ballast tank in the double bottom 3rd bay from the aft watertight bulkhead two bays in on the cargo tank bottom. Gauge in the presence of a marine inspector.
Action required: 705 - Other - as specified
Resolved 9 April 2025
Resolution: Gauging was all sat.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 2 April 2025Resolved
The aft peak tank hatches had evidence of leaking. Reseal the hatch and test for watertight integrity in the presence of a marine inspector.
Action required: 705 - Other - as specified
Resolved 25 April 2025
Resolution: Hose test confirmed by ABS.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 2 April 2025Resolved
Two closed hatches were found in the aft peak tank. Open the hatch and ensure space is gas free for inspection.
Action required: 705 - Other - as specified
Resolved 9 April 2025
Resolution: Hatches were opened and inspected.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 24 March 2023Resolved
On all tankships where the plans and arrangements will possibly permit, all passageways leading to living quarters, or places where anyone may be regularly employed, shall be provided with not less than two avenues of escape so located that if one of such avenues is not available another may be. The locality and arrangement of such additional means of escape shall be determined by the inspectors as will in their judgment best carry out the purpose for which this provision was made. MI observed lack of maintenance on both generator room escape hatches resulting in significant difficulty in opening hatches as intended in addition to wastage of one hatch cover dogging bar recess on the stbd generator room escape hatch. Operator to conduct maintenance as per manufacturers instructions and affect repairs to the wasted recess to the satisfaction of attending MI by way of photo documentation.
46CFR32.02-1
16c.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2023
Resolved 24 April 2023
Resolution: Completed replacement of deteriorated portion of hatch dog pocket.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 24 March 2023Resolved
Operational tests and checks of all safety and limit controls, combustion controls, programming controls, and safety relief valves must be conducted by the owner, chief engineer, or person in charge at the inspection for certification, periodic inspection, and when directed by the Officer in Charge, Marine Inspection, to determine that the control components and safety devices are functioning properly and are in satisfactory operating condition. These tests and checks must be conducted in the presence of a marine inspector and must include the following: proper prepurge, burner ignition sequence checks, operation of the combustion controls, limit controls, fluid flow controls, fluid level controls, high temperature control, proper postpurge control, and verification of the flame safeguard. MI observed significant difficulty of thermal fluid heater operator in demonstrating the above operational checks. Operator is required to request inspection of thermal fluid heater by servicing OCMI and demonstrate proper operation of tests to the satisfaction of the attending MI prior to conducting cargo operations requiring the thermal fluid heater.
46CFR61.30-20
705c
Condition: Invalid
Action required: 705 - Other - as specified
Due 24 March 2023
Resolved 31 January 2024
Resolution: Received ABS preliminary survey report attesting to the good working condition and crew member working knowledge of thermal fluid heater.
Vessel is overdue for the next Internal Structure Exam, as per date on COI. After discharging cargo in Delaware City, DE, vessel is scheduled to return to Sector NY COTP zone. At that time, OOA 07Sep2022, operator must make the vessel available to CG Marine Inspectors for an Internal Structure Exam.
Action required: 705 - Other - as specified
Due 30 September 2022
Resolved 13 October 2022
Resolution: USCG completed an ISE and the vessel received credit on this date.
Vessels that operate in salt water must be inspected in accordance with the intervals set forth in table 31.10-21(a). Where the table 31.10-21(a) indicates a 2.5 year examination interval, it means a vessel must undergo two examinations within any five year period. No more than three years may elapse between any two examinations.
Vessel has gone past its Internal Structural Examination date.
Provide documentation validating different ISE date or conduct ISE with CG MI's.
46 CFR 31.10-21(a)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 March 2022
Resolved 29 March 2022
Resolution: Vessel provided proof that vessel legally has more time on ISE dates if granted by OCMI.
14 - Pollution Prevention › 148 - Ballast Water › Ballast water discharge
Issued 24 March 2022Resolved
46 CFR 151.2035 (a): To discharge ballast water into waters of the United States, master, owner, operator, agent, or person in charge of a vessel subject to 151.2025 of this subpart must either ensure that the ballast water meets the ballast water discharge standard as defined in 151.2030 (a). The MV ACHIEVEMENT a US Flag Petroleum tug and barge loaded with petroleum experienced equipment failure in ballast system at BR Exon dock #1, position 30’ 28.6N 91’11.6 W. Sent an e-mail notifying them that discharge is prohibited. Must discharge outside of 12NM or at the facility, no EC authorized. Vessel must clean the ballast tanks to remove sediments and properly operate their system prior to discharge to the satisfaction of CG Inspector or TPO.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 26 March 2022
Resolution: Received ABS report, all sat.
Cargo piping test letter does not include the discharge piping which goes through the vacuum tank and sends product ashore. Vapor is emiting from the piping in the vicinity of the vacuum pump. Test the piping in the vicinity of the vacuum tank and produce documentation satisfactory to USCG prior to discharging product through the vacuum tank.
Condition: Invalid
Action required: 705 - Other - as specified
Due 26 May 2018
Resolved 1 May 2018
Resolution: Replaced pump and tested vacuum piping. All sat
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 25 March 2016Resolved
Each vapor connection flange must have a permanent stud located at the top of the flange. Replace flange end to ensure stud is secured properly. No stud was visible through flange end on forward starboard line at manifold.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 25 March 2016
Resolution: Vessel's crew replaced flange with proper reducer that had a permanent stud attached.
Engineering › Generator (propulsion-electric) › Reverse Power Protection Relay Circuitry
Issued 19 February 2014Resolved
Make repairs. Replace Starboard SSDG Breaker and prove proper operation of the starboard generator to parallel and operate reverse power relay.
Due 19 March 2014
Resolved 28 February 2014
Resolution: The Stbd SSDG breaker was replaced and the reverse power relay was operationally tested sat.