Inspection history · 42
27 February 2026
Administrative Inspection · Ballast Water Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8325231
17 November 2025
MARPOL Annex II Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8270055
29 September 2025
Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8242056
8 September 2025
COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8214664
8 May 2025
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8131880
4 March 2025
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8089094
1 October 2024
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8012799
13 August 2024
Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7981572
31 August 2023
Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7991223
30 June 2023
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7934790
23 August 2022
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7542753
6 October 2021
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7327682
7 October 2020
Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7073474
31 August 2020
Administrative Inspection · Internal Structural Exam · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7042577
14 May 2020
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 6953071
14 May 2020
Drydock Extension · Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6953455
1 May 2020
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 6972185
9 February 2020
Bulk Liquid Transfer Monitor
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6905752
1 August 2019
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6769554
29 July 2019
Administrative Inspection · Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6766783
7 September 2018
Periodic Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6535224
7 November 2017
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6438509
10 July 2017
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6204865
2 December 2016
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6052994
4 August 2016
Annual Inspection · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5967856
5 January 2016
Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5793797
15 December 2015
Internal Structural Exam · Examination of Repairs · Administrative Inspection · Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5783427
15 December 2015
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5783585
17 September 2015
COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5741606
24 August 2015
Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5222626
19 July 2015
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5189319
4 February 2015
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5063832
23 January 2015
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5058193
16 October 2014
Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 5006281
15 July 2014
Deficiency Check · Periodic Inspection · Internal Structural Exam
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4892621
15 July 2014
Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4929271
3 September 2013
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4704523
19 October 2012
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4467652
17 October 2012
Examination of Repairs
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4466164
5 September 2012
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4433097
9 May 2012
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4312547
17 March 2010
MARPOL Annex II Examination · Plan Review (Other than "T") · MTSA/ISPS Verification · Administrative Inspection · Initial Certification · Construction Oversight · MARPOL Annex VI Survey · Ballast Water Examination · MARPOL Annex I Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3697268
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 8 September 2025
Resolved
A vessel or object other than those referred to in paragraph (g) of this Rule being towed shall exhibit:(i) Sidelights;(ii) A sternlight; and(iii) When the length of the tow exceeds 200 meters, a diamond shape where it can best be seen. Stern light visible was extremely low and/or not functioning. Must be repaired/replaced while vessel is in fall 2025 drydock.
33 CFR 83.24(e)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 September 2025
Resolved 16 September 2025
Resolution: Received documentation of illuminated lights.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 8 September 2025
Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7 millimeter (0.5 inch) diameter and is at least 25.4 millimeters (1 inch) long. It must be located at the top of the flange face, midway between boltholes, and in line with the bolthole pattern. Stud on aft STBD VCS line connection point was not present. Must be installed while vessel is in fall 2025 drydock or sooner.
46 CFR 39.2001(j)
Action required: 705 - Other - as specified
Due 9 September 2025
Resolved 16 September 2025
Resolution: Received documentation of replaced stud.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 8 September 2025
Resolved
Each Class 1 door on a vessel in ocean service must be designed to withstand a head of water equivalent to the depth from the sill of the door to the margin line but in no case less than 10 feet (3.05 meters). All watertight door knife edges and gaskets need to be serviced during the fall 2025 drydock.
46 CFR 31.10-30, 170.270(b)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2025
Resolved 20 October 2025
Resolution: Vessel rep submitted photos attesting to the servicing and testing of all water tight door knife edges.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 8 September 2025
Resolved
The inspection shall be such as to insure that the vessel, as regards the structure, boilers, and other pressure vessels and their appurtenances, piping, main and auxiliary machinery, electrical installations, life-saving appliances, fire-detecting and extinguishing equipment, pilot boarding equipment, and other equipment is in satisfactory condition and fit for the service for which it is intended. Pipe hanger/mounting bracket for the inert gas system, by the double block and bleed, was missing. Must be installed to support inert gas piping while vessel is in fall 2025 drydock.
46 CFR 31.10-15(b)
Action required: 705 - Other - as specified
Due 30 September 2025
Resolved 29 September 2025
Resolution: MI observed the proper installation of the pipe hanger for IGS.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 8 September 2025
Resolved
Electrical equipment should not be installed in hazardous locations unless essential for operational purposes. When installed in these locations, special precautions should be taken to ensure that the electrical equipment is not a source of ignition. The middle STBD explosion proof lighting fixture above the manifold did not have stuffing tubes installed to create a vapor boundary. Stuffing tubes must be installed while vessel is in fall 2025 drydock.
46 CFR 31.35-1, 111.105-3(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2025
Resolved 29 September 2025
Resolution: MI observed stuffing tubes adequately installed on lighting fixture.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2024
Resolved
Each tankship to which this subpart applies must have an inert gas system that meets the requirements of this subpart and is approved in accordance with 46 CFR 50.20. Drain pipe extending from bottom of inert gas (IG) chamber had fiberglass wrap that appeared to cover a leak. Remove fiberglass for inspection or affect permanent repairs and prove satisfactory operation of IG system prior to transferring cargo requiring IG.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 August 2024
Resolution: ABS verified repairs.
Construction/Loadline › Hull › Hull Plating
Issued 15 December 2015
Resolved
Side shell was found set in approximately 1 foot between frames 18 and 19 in way of the 2 starboard ballast tank. Transverse frames 18 and 19 buckled The following side shell longitudinal stiffeners (SSL) were additionally found buckled; SSL
4,SSL5, SSL6, SSL7 between frames 18 and 19.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 February 2016
Resolved 14 February 2016
Resolution: Attended vessel at BAE Shipyard for final weld repair approval for hull plating replacement stbd side IVO frames 18/19. Witnessed satisfactory NDT testing (Vacuum box) on final weld.
Lifesaving › Inflatable Liferafts › Not on Board
Issued 28 July 2014
Resolved
RP01: Replace 25 man life raft with a life raft that can be launched by one person (6 man life raft). 46 CFR 199.261 (e)
Due 28 September 2014
Resolved 18 August 2014
Resolution: Received photo’s from Crowley representative [name withheld] attesting to the installation and annual servicing of a 6 man life raft.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 18 July 2014
Resolved
Provide manning proposal to OCMI Sector Columbia River. Proposal should include number of personnel and qualifications (no less than tankerman-PIC). Proposal must consider operation of barge machinery while underway; Generators, IGS, COW, and ballast pumps. This item must be completed before cargo operations, but not later than compliance date. 46 CFR 15.501 (b)
Condition: Placed in Improper Service
Due 23 July 2014
Resolved 20 July 2014
Resolution: Manning proposal submitted this date.
Construction/Loadline › Markings › Load Line Mark
Issued 18 July 2014
Resolved
Provide valid "manned" Load LIne Certificate. 46 CFR 42.07-45
Due 18 September 2014
Resolved 10 July 2017
Resolution: IAW guidance from CG-CVC Policy Letter 16-04 Signed on 26JUL2016. The Conditional occupancy of unmanned barges in (ATB) combination does not require a load line or stability letter. 01 DEF cleared.
Stability › Water on Deck › General
Issued 18 July 2014
Resolved
Provide "manned" stabiliity letter. 46 CFR 170.120
Due 18 September 2014
Resolved 10 July 2017
Resolution: IAW guidance from CG-CVC Policy Letter 16-04 Signed on 26JUL2016. The Conditional occupancy of unmanned barges in (ATB) combination does not require a load line or stability letter. 01 DEF cleared.
Lifesaving › Inflatable Liferafts › Not on Board
Issued 18 July 2014
Resolved
Provide 6 man inflatable liferaft. This item must be completed prior to crossing the boundary line. 46 CFR 199.261 (e)
Due 21 July 2014
Resolved 18 July 2014
Resolution: Vessels crew installed a 25 man liferaft with hydrostatic release directly aft of the barges bow.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 18 July 2014
Resolved
Provide PDF's and immersion suits for all personnel aboard the barge while at sea. 46 CFR 199.273 (b) and 46 CFR 199. 70 (b) (iv).
Due 21 July 2014
Resolved 18 July 2014
Resolution: Witnessed placement of 6 immersion suits and 6 Type 1 PFD''s in the vessels control room.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 15 July 2014
Resolved
Prior to conducting any operations beyond the boundary line that requires personnel to be onboard the barge to (operate equipment or stand watch) provide: a manned load line certificate, a manned stability letter, and a manning level proposal for the barge. Additional lifesaving and equipment requirements for manned operations to be determined. 46 CFR 31.15-1, 46 CFR 31.15.5 46, and 46 CFR 15.801
Action required: 705 - Other - as specified
Due 15 August 2014
Resolved 18 July 2014
Resolution: Re-wrote requirement into three requirements; manning proposal prior to cargo ops, manned LL and Stability letter due in 60 days.