Records from 2005 to 2025. Most recent: inspection, 19 May 2025.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 36
19 May 2025
PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8138945
15 April 2025
PSC B · Loadline Exam · ISM Exam · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8106352
12 February 2025
Administrative Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8078677
5 September 2024
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7996667
8 May 2024
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7908577
1 March 2024
Administrative Inspection · PSC B · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7872598
28 February 2024
Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7871530
8 December 2023
Deficiency Check · Administrative Inspection · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7836469
9 July 2023
In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7737457
6 April 2023
Explosive Handling Operation-Commercial
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7659979
6 April 2023
PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7662672
1 February 2023
Administrative Inspection · PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7627272
28 May 2022
PSC B
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7459744
28 May 2022
Explosive Handling Operation-Commercial
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7510804
25 May 2022
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7459239
25 March 2022
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7418737
9 January 2022
PSC A
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7376962
28 December 2021
PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7373070
19 October 2021
Administrative Inspection · PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7335394
22 August 2021
PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7293254
9 August 2021
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7281509
21 July 2021
In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7262995
20 July 2021
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7263444
12 July 2021
PSC A
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7250440
9 July 2021
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7250819
20 May 2021
Appeal
Administrative · Commandant (CG-CVC) · Activity 7202227
4 April 2021
In-Service Inspection · PSC A · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7164789
31 March 2021
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7166188
12 September 2017
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6264855
4 October 2016
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6015456
4 October 2016
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6015983
12 September 2016
Administrative Inspection · COE-Dockside
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 5999131
1 August 2016
ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5959197
25 March 2016
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5840266
23 March 2016
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 5839131
21 March 2016
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 5837650
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 15 April 2025
Resolved
The means for securing and maintaining weathertightness shall be to the satisfaction of the Administration. The Arrangements shall ensure that the tightness can be maintained in any sea condition. PSCO observed severe degradation of cargo hatch cover gasketing on multiple hatch covers.
ICLL Annex I/16(4)
30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 19 April 2025
Resolution: PSC NOLA received a class report from Rina satisfying the requirement.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 15 April 2025
Resolved
The company should establish procedures to ensure that the ship is maintained in accordance with the provisions of the relevant rules and regulations established by the Company. The technical nature of deficiency noted above provides objective evidence of a serious failure of the implementation of the ISM Code. An external audit report satisfactory to the OCMI must be submitted prior to the clearance of this deficiency. 74SOLAS(20) IX/3
ISM Code 10.1
30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 19 April 2025
Resolution: PSC NOLA received a class report from Rina satisfying the requirement.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 1 March 2024
Resolved
THE PURPOSE OF THIS REGULATION IS TO LIMIT THE FIRE GROWTH POTENTIAL IN EVERY SPACE OF THE SHIP. FOR THIS PURPOSE, THE FOLLOWING FUNCTIONAL REQUIREMENTS SHALL BE MET: MEANS OF CONTROL FOR FLAMMABLE LIQUIDS IN THE SPACE SHALL BE PROVIDED.
PSCO OBSERVED EXCESS OIL ACCUMULATION IN STBD AND AFT BILGE WELL.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 March 2024
Resolved 3 March 2024
Resolution: Received class report attesting to the oil being cleaned up. Attached in documents.
14 - Pollution Prevention › 141 - MARPOL Annex I › 15 PPM Alarm arrangements
Issued 1 March 2024
Resolved
OIL FILTERING EQUIPMENT REFERRED TO IN PARAGRAPH 1 OF THIS REGULATION SHALL BE OF A DESIGN APPROVED BY THE ADMINISTRATION AND SHALL BE SUCH AS WILL ENSURE THAT ANY OILY MIXTURE DISCHARGED INTO THE SEA AFTER PASSING THROUGH THE SYSTEM HAS AN OIL CONTENT NOT EXCEEDING 15PPM.
PSCO OBSERVED FRESH WATER LINE FOR OWS NOT CONNECTED, PREVENTING FRESH WATER CALIBRATION AND SENSOR FLUSH, REQUIRED TO BE CONDUCTED IN THE MANUAL.
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 1 April 2024
Resolved 8 May 2024
Resolution: Class report recieved attesting to repairs and calibratioon of OWS
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 1 March 2024
Resolved
WHERE THE EMERGENCY SOURCE OF ELECTRICAL POWER IS A GENERATOR, IT SHALL BE STARTED AUTOMATICALLY UPON FAILURE OF THE MAIN SOURCE OF ELECTRICAL POWER SUPPLY.
PSCO OBSERVED EMERGENCY GENERATOR DID NOT START INDEPENDENTLY UPON 3 ATTEMPTS; CREW HAD TO ASSIST IN EMERGENCY GENERATOR START UP.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Due 1 March 2024
Resolved 1 March 2024
Resolution: Corrected during PSC exam.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 1 March 2024
Resolved
THE FOLLOWING FIRE PROTECTION SYSTEMS SHALL BE KEPT IN GOOD ORDER SO AS TO ENSURE THEIR REQUIRED PERFORMANCE IF A FIRE OCCURS: FIRE DETECTION AND FIRE ALARM SYSTEMS.
PSCO OBSERVED SMOKE ALARM IN DECK WORKSHOP COVERED BY PLASTIC, OBSTRUCTING ITS OPERATIONAL READINESS.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 1 March 2024
Resolved 1 March 2024
Resolution: corrected on the spot
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 8 December 2023
Resolved
The company should establish procedures, plans, and instructions, including checklists as appropriate, for key shipboard operations concerning the safety of the personnel, ship, and protection of the enviornment.
The vessel has checklists on weekly, monthly, and annual checks, however their SMS does not have particular procedures regarding how to test specific systems, particularly fire detection and the OWS. Crew was unfamiliar with locations of different detectors and uncertain in which testing devices werre required. The SMS does not address specific testing ewuipment that is required. Additionally, crew was unfamiliar with accessing the electronic logs on the MEPC 107(49) oil content meter. PSCO had to demonstrate how to access the logs using the operations manual.
Reccomend an internal audit regarding shipboard operations, maintenance, and reporting of non-conformities be conducted within 90 days.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2024
Resolved 28 February 2024
Resolution: Received an internal audit report from the vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 8 December 2023
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use.
PSCO observed hairline cracks in numerous windows of the free fall lifeboat.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 December 2023
Resolution: See attached Class Report.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 8 December 2023
Resolved
The condition of the ship and it's equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
PSCO observed stack ventilation flame screens covered in soot and fuel oil, and one was found to be torn.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 December 2023
Resolution: See attached class report
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 December 2023
Resolved
The machinery, boilers, and other pressure vessels, associated piping systems and fittings shall be of design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces, and other hazards.
PSCO observed fabricated catch for Lube Oil on No 1 generator and pooled oil underneath. Additionally PSCO observed a second fabricated catch and oil leak on FW stern tube hydraulic oil tank.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2023
Resolved 14 December 2023
Resolution: See attached class report
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 8 December 2023
Resolved
Electrical installations shall be such that: the safety of passangers, crew and ship from electricals hazards will be ensured.
PSCO observed shaft generator to be missing electrical connections and internal windings covered in oil.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2023
Resolved 14 December 2023
Resolution: See attached class report
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 December 2023
Resolved
Where "A" class divisions are penetrated for the passage of electrical cables, pipes, trunks, ducts, etc., or for girders, beams, or other structural members, arrangements shall be made to ensure that the fire resistance is not impaired.
PSCO observed an uninsulated penetration through an "A" Class fire boundary in the ECR escape trunk. An A/C unit was installed through the penetration. Arrangement was approved under previous class society, not the current class society.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 January 2024
Resolved 25 December 2023
Resolution: Received class report attesting to rectification of uninsulated 'A' class penetration in ECR.
08 - Alarms › N/A - No Subsystem › UMS - alarms
Issued 9 July 2023
Resolved
An alarm shall be provided indicating any fault requiring attention and shall be capable of sounding an audible alarm in the main machinery control room or at the propulsion machinery control position.
Vessel crew reported that while in Houston, receiving a class survey, they suffered a casualty to their ECR/Engine Room alarms, rendering them inoperable and reported that they only have alarms on the navigation bridge. Vessel indicated that class did not issue any documentation.
SOLAS 14 (20) II-1 / 51.1.1
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 July 2023
Resolved 12 February 2025
Resolution: VESSEL SENT IN DOCUMENTATION FROM THE CLASSIFICATION SOCIETY REMOVING THE DECLARATION OF PERIODIC UNMANNED MACHINERY SPACE DUE TO THE UNAVAILABILITY OF PARTS AS THE SYSTEM IS OUTDATED AND NO LONGER SUPPORTED. VESSEL SENT IN UPDATED CLASS CERT. MSM CERT.
01 - Certificates & Documentation › 012 - Crew Certificates › Manning specified by the minimum safe manning doc
Issued 9 July 2023
Resolved
For every ship to which CH I applies, the administration shall issue an appropriate minimum safe manning documen t. Vessel's minimum safe manning states that the vessel has a periodically unmanned machinery space. The vessel's crew reported & PSCO's observed that vessel's alarm cpu is inoperable preventing engine, valve & pump alarms from being received, vessel does not have flag document certifying current manning levels as safe.
SOLAS 14 (20) V / 14.2.2
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Due 17 July 2023
Resolved 10 July 2023
Resolution: Class verified manning level would be sufficient although it doesnt meet STCW requirements.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 2 February 2023
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO observed that the rescue boat engine is not operating as designed.
74 SOLAS (2001 cons.) III/20.1
17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 February 2023
Resolution: Class report received attesting to the proper operation of the rescue boat engine.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 2 February 2023
Resolved
The ring, lines and letters shall be permanently marked on the sides of the ship. PSCO observed that the mark of the issuing authority are not permanently affixed.
ICLL 66 Reg 7/8
40ac
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 3 February 2023
Resolution: Class report received allowing temporary marking until permanent can be added.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 9 January 2022
Resolved
Before the ship leaves port and at all times during the voyage, all life saving appliances shall be in working order and ready for immediate use.
PSCO observed emergency swing lever on single point rescue boat/life raft davit was twisted together with the break release resulting in a broken lever for emergency swing function. Temporary repairs made by crew and tested.
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 March 2022
Resolution: Broken lever replaced with original spare part supplied by Global Davit GmbH . Repairs has been ascertained and Test of davit conducted satisfactorily via remote survey
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 October 2021
Resolved
Main and auxiliary machinery essential for the propulsion and safety of the ship shall be provided with effective means for its operation and control.
The #1 & #2 start air receivers lag pressure switches were electrically disconnected.
74SOLAS(01)II-1/31.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 19 November 2021
Resolved 25 October 2021
Resolution: Received report from RINA stating that current configuration is appropriate. Document attached for review.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 19 October 2021
Resolved
Where the emergency source of electrical power is a generator, it shall be started automatically upon failure of the main source of electrical power supply.
Emergency generator was completely dismantled for repairs.
74 SOLAS (01) II-1/43.3.1.2. Please refer to flag's document attached for extention approval.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 November 2021
Resolved 26 October 2021
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 21 July 2021
Resolved
All steering gear components and the rudder stock shall be of sound and reliable construction to the satifaction of the administration. During outbound transit vessel had loss of steering function that resulted in potential ground. Pilot called assist tug and returned vessel to prt. Class to atest to function and realibility of steering gear and controls (to incude hydraulic leaks found near steering gear) prior to departure from port.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 August 2021
Resolution: Vessel agent submitted class report from RINA. Divers conducted damage survey and found no damage.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 21 July 2021
Resolved
Ships shall be maintained in compliance with the structural requirements of a class society which is recognized by the administration. It was reported that the vessel ran soft aground. Class to attest to structural itegrity of the vessel prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 August 2021
Resolution: Vessel agent submitted class report from RINA. Divers conducted damage survey and found no damage.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 12 July 2021
Resolved
The machinery shall be so installed and protected as to reduce to a minimum any danger to persons onboard, due regard being paid to moving parts. PSCO observed machinery gearing on port side rear of main engine with a screen guard missing.
Action required: 15 - Rectify deficiencies by next port
Resolved 12 July 2021
Resolution: Vessel re-installed cover over exposed machinery gearing on main engine.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 12 July 2021
Resolved
Fire fighting systems and appliances shall be in good working order and readily available for immediate use. PSCO observed fire station number 21 was heavily corroded with salt water and unable to be opened by crew for over ten minutes.
Action required: 10 - Deficiency Rectified
Resolved 12 July 2021
Resolution: Corrected on the spot.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 4 April 2021
Resolved
The machinery, boilers and other pressure vessels, associated piping systems shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. The design shall have regard to materials used in construction, the purpose for which the equipment is intended, the working conditions to which it will be subjected and environmental conditions on board. The PSCO discovered the following hazardous conditions in the vessels machinery spaces: Missing and oil soaked lagging found on fuel line leading to main engine, starboard side, at bottom deck of engine room. Oil soaked electrical equipment on main engine to include: control box, oil mist detectors, and governor. HFO manifold in engine room, bottom deck, found with oil soaked lagging. Found oil soaked lagging throughout purifier space and purifier equipment. Oily rags and buckets thrown into ship’s framing, adjacent to fuel oil purifier space. Drained fuel oil from fuel tank in emergency generator space, stored using 5 gallon container in the space.
74 SOLAS (1997 Cons.) II-1/26.1
Action required: 30 - Ship detained
Due 4 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 April 2021
Resolved
The machinery, boilers and other pressure vessels, associated piping systems shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. The design shall have regard to materials used in construction, the purpose for which the equipment is intended, the working conditions to which it will be subjected and environmental conditions on board. The PSCO discovered unapproved and improper installation of the following equipment in the vessels machinery spaces: Unapproved and improperly rigged main engine governor electrical control box installed on main engine port side. Main engine exhaust gas temperature sensor improperly rigged with temporary electrical connection. Ships service generators contain loose and exposed wiring for fuel alarms. Air start control box for ship service generator found with temporary zip-tie connections.
74 SOLAS (1997 Cons.) II-1/26.1
Action required: 30 - Ship detained
Due 5 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 April 2021
Resolved
Electrical installations shall be such that the safety of crew and ship from electrical hazards will be ensured. The PSCO discovered the following electrical hazards throughout the vessel: Daisy chained and unapproved electrical connections for equipment installed in in engine control room. Sea Water #2 Cooling Pump for main engine found with loose wires and dangerous electrical connections. Emergency generator panel found with hazardous openings on the switchboard. Hazardous electrical connections for installed equipment found in crew laundry. Explosion proof lighting found without grounding cable. Navigation equipment electrical connections open, and not installed in a panel. Several unapproved connections and electrical splices found on Navigation Bridge. Broken lighting fixtures and open light fixtures in engine room, lower deck. Ion generator pump, for recirculation of sea chest, improperly fitted and tied into ship’s electrical system. Unapproved additional lighting found installed in generator space, tied into ships electrical system inappropriately. Unapproved electrical breaker supplied unapproved and improvised heater, tied into provisions cooling pump breaker, located in ECR.
74 SOLAS (1997 Cons.) II-1/40.1.3 – 30 a/c
Action required: 30 - Ship detained
Due 5 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 4 April 2021
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. The PSCO discovered the following: Emergency light fixtures at lifeboat and rescue boat embarkations, as well as forward port side cargo hold main deck fixture, found inoperable. Public address system at embarkation stations for lifeboat and rescue boat found improperly installed and inoperable. Lifejackets not stowed in forward lifejacket storage box as designated by lifesaving plan.
74 SOLAS (1997 Cons.) III/19.2 – 30 a/c
Action required: 30 - Ship detained
Due 5 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 4 April 2021
Resolved
The fire resistance of doors shall, as far as practicable, be equivalent to that of the division in which they are fitted. The PSCO discovered the following: Fire door #726 into crew and officer’s mess from passageway, not listed on fire control plan. Multiple fire doors throughout the stairway, as well as aft fire door to aft upper deck, found unable to latch properly.
74 SOLAS (1997 Cons.) II-2/47.1
Action required: 30 - Ship detained
Due 5 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 4 April 2021
Resolved
In addition to complying with the specific provisions for fire integrity of bulkheads and decks mentioned elsewhere in this part, the minimum fire integrity of bulkheads and decks shall be as prescribed in tables 44.1 and 44.2. “A” class boundary cable penetration from steering space to provision store, found with wasted fire proofing, not performing as listed “A-15” according to table.
74 SOLAS (1997 Cons.) II-2/44.1
Action required: 30 - Ship detained
Due 5 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 4 April 2021
Resolved
For each breathing apparatus a fireproof lifeline of sufficient length and strength shall be provided. Firefighter lifeline, found not to be of approved fire-proof type.
74 SOLAS (1997 Cons.) II-2/17.2
Action required: 30 - Ship detained
Due 5 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 4 April 2021
Resolved
Objective evidence discovered in an expanded ISM exam revealed the following non-conformities; the vessel failed to fully implement the requirements of the SMS as evident by deficiencies #01 through #07. An external audit is required.
74 SOLAS (20 Cons.) IX 3.1, ISM Code 10.1
Action required: 30 - Ship detained
Due 5 April 2021
Resolved 12 April 2021
Resolution: Received external DNV GL audit. Audit found multiple observations and lack of maintenence. To be followed up by DNV GL. See class report attached to activity.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 4 April 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present convention to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment. PSCO discovered the following items during examination of OWS: Unapproved, flexible water inlet line to primary stage OWS, not included on vessels main drawing. Crew testing OWS with chemical method not approved by manufacturer and expired testing chemical. Chemical bottle listed expiration date 14JUL2012. Loose and unfitted bolts on recirculation valve, inboard from 3-way valve.
MAPROL 73-78 ANNEX I/6.4.1
Action required: 17 - Rectify deficiencies prior to departure
Due 5 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 4 April 2021
Resolved
10) The means of control of any fixed gas fire extinguishing system shall be readily accessible and simple to operate and shall be grouped together in as few locations as possible at positions not likely to be cut off by a fire in a protected space. At each location there shall be clear instructions related to the operation of the system having regard to the safety of personnel. Instructions for operation of CO2 cabinets for emergency generator and paint locker, do not correspond to installed design. “C” valve is not present, other valves not properly labeled. Cabinet for emergency generator does not alarm when opened.
74 SOLAS (1997 Cons.) II-2/5.1.
Action required: 17 - Rectify deficiencies prior to departure
Due 5 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 4 April 2021
Resolved
Any required fixed fire alarm system with manually operated call points shall be capable of immediate operation at all times. Call point for fire alarm at main deck passageway, improperly installed.
74 SOLAS (1997 Cons.) II-2/13.1.1
Action required: 17 - Rectify deficiencies prior to departure
Due 5 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 4 April 2021
Resolved
All hatch covers shall be fitted with steel, such covers shall be weather tight and fitted with gaskets and clamping devices. Escape hatch leading to upper deck aft, from steering gear/workspace, unable to fully close.
ICLL 66/88 16.1
Action required: 17 - Rectify deficiencies prior to departure
Due 5 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 April 2021
Resolved
The machinery, boilers and other pressure vessels, associated piping systems shall be of a design and construction adequate for the service for which they are intended. PSCO discovered the following items in the vessel’s machinery spaces: Pressure sensors and gauges for fresh water and salt water cooling of main engine found disconnected from piping. Loose drive belts and dead end wires found on emergency generator.
74 SOLAS (1997 Cons.) II-1/26.1
Action required: 17 - Rectify deficiencies prior to departure
Due 5 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 4 April 2021
Resolved
After any survey of the ship has been completed, no change shall be made in the structural arrangements, machinery, equipment, and other items covered by the survey, without the sanction of the Administration. Temporary patch found on fire main, leading to educator on outside of cargo hatch #2, starboard side.
74 SOLAS (2020 Cons.) I/11(b) – 16 a/c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 April 2021
Resolved
15) Electrical installations shall be such that the safety of crew and ship from electrical hazards will be ensured. PSCO discovered multiple electrical issues as follows: Electrical ventilator controls underneath #2 crane tower, found inoperable and wasted. Light cover for lighting fixture to #2 cargo hold port side, found missing. Soft patch found on electrical stand pipe leading from cargo hatch #2. Wasted or weak stand piping for electrical equipment found throughout cargo upper deck on both port and starboard side.
74 SOLAS (1997 Cons.) II-1/40.1.3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 4 April 2021
Resolved
After any survey of the ship has been completed, no change shall be made in the structure, equipment, systems, fitting, arrangements or material covered by the survey, without the sanction of the Administration. Vessel fitted with six bolted flange for sewage discharge connection, which is specifically required for the standard discharge connection for sludge discharge.
MARPOL 73/78 ANNEX I/6.4.2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 4 April 2021
Resolved
After any survey of the ship has been completed, no change shall be made in the structure, equipment, systems, fitting, arrangements or material covered by the survey, without the sanction of the Administration. Flow sensor on vessel’s bunker line amidships found wasted.
MARPOL 73/78 ANNEX I/6.4.2 – 16 a/c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 April 2021
Resolved 12 April 2021
Resolution: Received class reports and attended vessel, re-examined items, found satisfactory.
Engineering › Steam Boiler (propulsion) › Fuel Oil Burner
Issued 25 March 2016
Resolved
THE CONDITION OF THE SHIP'S EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS FO THE PRESENT REGULATIONS TO ENSURE THE SHIP WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO SHIP OR PERSONS ON BOARD. THE BOILER IS NOT OPERATIONAL.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 31 March 2016
Resolution: Repaired and tested with satisfactory results
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 25 March 2016
Resolved
THE RESCUE BOAT SHALL BE LAUNCHED AND MANOEUVRED IN THE WATER AT LEAST ONCE EVERY THREE MONTHS. THE RESCUE BOAT HAS NOT BEEN LAUNCHED OR MANOEUVRED IN THE WATER FOR SIX MONTHS.
Condition: Improper/Lack of Maintenance
Due 25 March 2016
Resolved 31 March 2016
Resolution: Recue boat was launched, released and manoeuvred with satisfactory results
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 25 March 2016
Resolved
A STATIC LIQUID PRESSURE TEST OF THE MAIN BUNKER LINE MUST BE CARRIED OUT ANNUALLY. THE LAST PRESSURE TEST WAS CONDUCTED 16FEB15.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 April 2016
Resolved 31 March 2016
Resolution: Bunker line was pressured as per requirements and in order