Records from 2017 to 2025. Most recent: inspection, 2 March 2025.
Inspection history · 38
2 March 2025
PSC B · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8086853
20 February 2025
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8082081
13 December 2024
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8047125
12 December 2024
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8046521
8 December 2024
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8044661
3 December 2024
PSC A
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8041378
2 December 2024
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8041878
29 September 2024
Deficiency Check · ISPS Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8010294
27 September 2024
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8010377
23 September 2024
Deficiency Check · PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8007554
17 September 2024
In-Service Inspection · PSC B · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8003747
16 September 2024
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8005103
13 September 2024
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8001870
6 April 2024
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7890830
6 April 2024
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7890834
28 March 2024
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7883086
25 March 2024
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7884518
19 January 2024
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7851625
15 January 2024
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7849454
2 January 2024
Deficiency Check · PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7843038
27 October 2023
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7815461
19 May 2023
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7687327
2 March 2023
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7644368
17 December 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7610394
30 September 2022
PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7569078
24 January 2022
PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7377039
1 October 2020
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7069126
1 October 2020
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7113932
22 December 2019
ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6877810
25 October 2019
In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6841829
4 January 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6605722
9 November 2018
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6577952
12 September 2018
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6539684
4 September 2018
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6531318
14 April 2018
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6391681
12 April 2018
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6390144
8 January 2018
ISPS II Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6333208
14 November 2017
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6304691
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 2 March 2025
Resolved
In addition to complying with the specific provisions for fire integrity of bulkheads and decks mentioned elsewhere in this part, the minimum fire integrity of bulkheads and decks shall be as prescribed in tables 44.1 and 44.2.
PSCO observed cable penetration in ETO office on main deck to A deck packed with wood & cardboard, not meeting fire control plan. Additionally, door to space is not self closing, and space is not listed as ETO workshop on fire control plan.
74SOLAS(01) II-2/44.1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2025
Resolved 11 March 2025
Resolution: DNV report indicated Wood and cardboard removed,Self-closing device installed to door and ETO space added to fire control plan.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 2 March 2025
Resolved
In addition to complying with the specific provisions for fire integrity of bulkheads and decks mentioned elsewhere in this part, the minimum fire integrity of bulkheads and decks shall be as prescribed in tables 44.1 and 44.2.
PSCO observed unsealed cable penetration in fire boundary on bridge.
74SOLAS II-2/44.1
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 11 March 2025
Resolution: DNV report indicated Cable penetration in fire boundary on bridge sealed with proper sealant.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 23 September 2024
Resolved
07126 - Oil accumulation in engine room - The machinery, boiler and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board.
PSCO observed active oil leaks on the forward and aft stern tube seal piping with accumulated oil pooled underneath both tanks. The level of each tank is below the normal operating level and the crew is refilling the tanks with the aft tank last filled on 14SEP24 and the foward tank last filled on 20SEP24.
74SOLAS(04)II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 September 2024
Resolution: Received, reviewed, and accepted class report from DNV stating the deficiency was rectified. Crew tightened piping connections, cleared the area of oil, and refilled both tanks to proper oil level.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 September 2024
Resolved
09209 - Eletrical - The rating or appropriate setting of the overload protective device for each circuit shall be permanently indicated at the location of the protective device.
PSCO observed no rating for BWTS circuit breakers on the main switchboard.
74SOLAS(20) II-1/45.6.2
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 September 2024
Resolution: Received, reviewed, and accepted class report DNV stating the deficiency was rectified. Verified circuit breakers per approved power supply wiring diagram and labeled breakers accordingly.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 23 September 2024
Resolved
02101 - Closing devices/watertight doors - Doors fitted in boundary bulkheads of machinery spaces of category A shall be reasonably gastight and self-closing. Doors required to be self-closing shall not be fitted with hold-back hooks.
PSCO observed the door to the eletrical equipment room being held open by rope and the door into the ECR being held open by a door stop. Additionally the A-60 self-closing door leading from ECR into the engine room does not latch and the A-60 self-closing door from the changing room into the engine room does not close.
74SOLAS(01) II-2/47.1+.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 September 2024
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 23 September 2024
Resolved
04114 - Emergency source of power (Emergency Generator) - The machinery, boiler and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board.
PSCO observed a substantial leak from the cooling pump mechanical seal on the emergency generator.
74SOLAS(20) II-2/26.1
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 27 September 2024
Resolution: Received class report attesting to repairs of water pump and seal on emergency generator.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 23 September 2024
Resolved
03107 - Doors - All access openings in bulkheads at ends of enclosed superstructures shall be fitted with doors of steel or other equivalent material, permanently and strongly attached to the bulkhead, and framed, stiffened and fitted so that the whole structure is of equivalent strength to the unpierced bulkhead and watertight doors shall consist of gaskets and clamping devices or other equivalent means and shall be permanently attached to the bulkhead or to the doors themselves, and the doors shall be so arrancged that they can be operated from both sides of the bulkhead.
PSCO observed bridge weathertight doors not capable of properly sealing.
ICLL 1/12(1)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 27 September 2024
Resolution: Recieved class report attesting to repair of door seals.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 September 2024
Resolved
09209 - Eletrical - Eletrical installations shall be such that the safety of passengers, crew, and ship from eletrical hazards will be ensured.
PSCO observed broken ground wires on the mechanical exhaust vent near the port side embarkation station, the forward mechanical exhaust fans on the port and starboard side, the 440v reefer receptacle near Bay 37 upper platform, and the explosion proof lights near the port and starboard embarkation station.
74SOLAS(20) II-1/40.1.3
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 23 September 2024
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 23 September 2024
Resolved
15109 - Maintenance of the ship and equipment - The company and the ship shall comply with the requirements of the International Safety Management Code.
In meeting these requirements, the company should ensure that:
.1) Inspections are held at appropriate intervals
.2) Any non-conformity is reported, with its possible cause if known
.3) Appropriate corrective action is taken
.4) Records of these activities are maintained.
PSCO observed vessel's crew improperly filling out vistor log. Not securing restricted areas per ship's plan, not locking out/tagging out generator #1 in accordance with ship's procedures, and has not reported stern tube leaks. An internal audit is recommended to be completed within 90 days.
74SOLAS(20) IX/3.1
ISM 10.2
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 December 2024
Resolved 13 December 2024
Resolution: PSC NOLA received proper documentation from the ship management company satisfying the requirement.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 17 September 2024
Resolved
Whenever an accident occurs to a ship or a defect is discovered, either of which affects the safety of the ship or the efficiency or completeness of its life-saving appliances or other equipment, the master or owner of the ship shall report at the earliest opportunity to the Administration, the nominated surveyor or recognized organization responsible for issuing the relevant certificate, who shall cause investigations to be initiated to determine whether a survey, as required by regulations 7, 8, 9 or 10, is necessary. If the ship is in a port of another Contracting Government, the master or owner shall also report immediately to the appropriate authorities of the port State and the nominated surveyor or recognized organization shall ascertain that such a report has been made. PSCO observed vessel did not report inoperatable generator number 1 to the recognized organization or U.S. Coast Guard.
Action required: 10 - Deficiency Rectified
Resolved 17 September 2024
Resolution: officially reported to USCG during exam.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 28 March 2024
Resolved
The ring, lines, and letters shall be painted in white or yellow on a dark ground. PSCO observed taht deck line is not painted.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 28 March 2024
Resolution: PSCO obeserved that deck line was painted. Corrected during exam.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 March 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed Hydraulic oil leaking from a valve located on the hydraulic tank in forepeak servicing anchoring equipment.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 September 2024
Resolution: CLASS SURVEY
14 - Pollution Prevention › 147 - Anti-Fouling › Other (AFS)
Issued 28 March 2024
Resolved
The master, owner, operator of any vessel equipped with ballast water tanks that operates in the waters of the United States must follow these practices: Remove fouling basis organisms from the vessel's hull on a regular basis. PSCO obsereved excessive algae growth along the ships hull.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 September 2024
Resolution: CLASS SURVEY
10 - Safety of Navigation › N/A - No Subsystem › Speed and distance indicator
Issued 28 March 2024
No resolution recorded
Each vessel must have the following: Equipment on the bridge for plotting relative motion. Vessel reported inoperable speed log that cannot be repaired in port, to be rectified in compliance with Recognized organization requirement.
Action required: 705 - Other - as specified
Due 30 November 2024 — due date passed with no resolution recorded
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 2 January 2024
Resolved
BEFORE THE SHIP LEAVES PORT AND AT ALL TIMES DURING THE VOYAGE, ALL LIFE SAVING APPLIANCES SHALL BE IN WORKING ORDER AND READY FOR IMMEDIATE USE. PSCO OBSERVED THE LIFEBOATS UNABLE TO SHIFT INTO GEAR AS INTENDED. 74SOLAS(20)III/20.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 January 2024
Resolution: PSCO OBSERVED BOTH LIFEBOATS SHIFT GEARS AS INTENDED.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 2 January 2024
Resolved
THE ELECTRICAL POWER AVAILABLE SHALL BE SUFFICIENT TO SUPPLY ALL THOSE SERVICES THAT ARE ESSENTIAL FOR SAFETY IN AN EMERGENCY. PSCO OBSERVED THE EMERGENCY GENERATOR UNABLE TO MAINTAIN 60 Hz. 74SOLAS(04)II-1/43.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 January 2024
Resolution: PSCO OBSERVED EMERGENCY GENERATOR ABLE TO MAINTAIN 60 Hz AFTER ADJUSTMENT.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 2 January 2024
Resolved
MUSTER AND EMBARKATION STATIONS SHALL BE ADEQUATELY ILLUMINATED. PSCO OBSERVED BOTH THE LIFERAFT EMBARKATION STATION LIGHTS EXTINGUISHED. 74SOLAS(20)III/11.4
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 January 2024
Resolution: PSCO OBSERVED BOTH LIGHTS OPERATIONAL.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 October 2020
Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED
TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT ANY DANGER TO THE SHIP OR PERSONS ON BOARD.
VESSEL EXPERIENCED EXCESSIVE LUBE OIL LEAK FROM THE STUFFING BOX CONNECTING THE SHAFT TO THE ENGINE. WHICH CASUED THE MASTER TO REDUCE PROPULSION TO AVOID A MAIN ENGINE CASUALTY.
74SOLAS(14)I/II
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 October 2020
Resolved 1 October 2020
Resolution: Vessel provided class report attesting to the repairs to the main engine stuffing box.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 9 November 2018
Resolved
Oil fuel lines shall be screened or otherwise suitably protected to avoid oil spray or oil leakages onto hot surfaces. PSCO's observes fuel oil leaking and coating several steam pipes within the purifier room. Additionally, fuel oil was observed leaking from the fuel pump on the number two cylinder onto the hot surfaces of the engine. Cite 74SOLAS(01 cons.) II-2/15.2.11 17a,c
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 9 November 2018
Resolved 14 November 2018
Resolution: Sector Houston-Galveston received DNV-GL report of repairs made to piping system in purifier room and on fuel injection pump on number 2 cylinder. See attached DNV-GL report 13NOV18
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 9 November 2018
Resolved
The emergency source of electrical power shall be capable of supplying simultaneously at least the services listed in SOLAS(01 cons) II-1/43.2 through 43.2.6.1 for the applicable timeframes. PSCO's observed a fuel level for the emergency generator that was below the required level. Cite 74SOLAS(01 cons.) II-1/43.2 17a,c
Action required: 17 - Rectify deficiencies prior to departure
Due 9 November 2018
Resolved 10 November 2018
Resolution: Fuel added to E-Gen fuel tank.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 9 November 2018
Resolved
In cargo ships, the failure of such means or overfilling of the tank shall not permit release of fuel into the space. The administration may permit the use of oil level gauges with flat glasses and self-closing valves between the gauges and the and fuel tanks. Self-closing valves where found tied open rendering them inoperable. Cite 74SOLAS(01 cons.) II-2/15.2.6.2.2 17a,c
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 9 November 2018
Resolved 10 November 2018
Resolution: All ties removed from sight guage valves.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 9 November 2018
Resolved
A portable foam applicator unit shall consist of an air-foam nozzle of an inductor type capable of being connected to the fire main by a fire hose, together with a portable tank containing at least 20L of foam-making liquid and one spare tank. Spare tank is missing from unit storage container. 74SOLAS(01 cons.) II-2/6.1.2.4 17a,c
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 9 November 2018
Resolved 10 November 2018
Resolution: Additional 20 liter foam tank provided.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 9 November 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO's observed nine deck lights that were extinguished.74SOLAS(01 cons.) I/11 (a) 40a,c
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 9 November 2018
Resolved 10 November 2018
Resolution: All deck lights repaired and in working order.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 9 November 2018
Resolved
In meeting these requirements, the company should ensure that inspections are held at appropriate intervals (10.2.1) and that appropriate corrective action is taken (10.2.3) C01 maintenance of the ship paragraph 5.4 of the vessels SMS states that " all regular maintenance has to be done IAW the national and international rules and regulations and basically according to the manufacturers instruction of the specific part of the equipment."Fleet instruction D01 Technical Operation- general 5.2.1 "performing of the engineering watch" of the vessel's SMS states that "adequate rounds of the machinery and steering gear spaces have to be made for the purposes of observing and reporting equipment malfunctions or breakdowns and to perform or directing routine adjustments." Fleet instruction L11 states that the company shall "ensure that precautions, request for service, queries etc. received from the vessel are properly and efficiently processed without undue delay and that the staff onboard is kept duly informed about the actual status of the issue."Although the vessel's crew was able to provide records of completed regularly scheduled maintenance/ inspections of the steering gear and deck lighting systems, PSCO found objective evidence that proved otherwise. Additionally, as delineated in deficiency #01 & 03 it is evident that adequate engineering rounds were not conducted of the machinery spaces. As referred to in deficiency #2 the vessel's emergency gen fuel tank was below the required limit. Two separate requisitions were completed for emergency generator fuel. The delayed fulfillment of these requests caused the vessel to sail for 70 days without the required amount of fuel in the emergency generator fuel tank. 74SOLAS(2014) IX/3.1 ISM code 10.2.1 ISM Code 10.2.3 50a,c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 December 2018
Resolved 4 January 2019
Resolution: Class Report was submitted
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 November 2018
Resolved
Hydraulic power operated steering gear shall be provided with a fixed storage tank having sufficient capacity to recharge at least one power activating systems including the reservoir, where the main steering gear is required to be power-operated. Fixed storage tank was found to be approximately 100L below the required capacity.74SOLAS(01 cons.) II-1/29.12.3 10c
Action required: 10 - Deficiency Rectified
Due 9 November 2018
Resolved 9 November 2018
Resolution: Vessel was able to replenish hydraulic oil to required levels prior to completion of the exam.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 9 November 2018
Resolved
Each separate circuit shall be protected against short circuit and against overload. The washing machine breaker on main electrical panel in machinery compartment was found with amperage higher than the maximum amperage listed on component identification plate.74SOLAS(2001 cons.) II-1/45.6.1 10c
Action required: 10 - Deficiency Rectified
Due 9 November 2018
Resolved 9 November 2018
Resolution: Crew had spare circuit breaker on board and replaced in kind.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company verification, review and evaluation
Issued 9 November 2018
Resolved
Objective evidence discovered in an expanded ISM exam revealed the following non-conformity; vessel failed to fully implement the requirements of the SMS as evident in deficiency No. 6 ** An internal audit is required within 3 months ** Cite 74SOLAS(2014 cons.) IX/3.1, ISM Code 10 705c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 February 2019
Resolved 4 January 2019
Resolution: PSC NOLA received class report satisfying the requirement.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Valve
Issued 14 November 2017
Resolved
The machinery and associated piping sytems and fittings shall be of a design and construction adequate for the intended service. Air line to the puncture valve on the #11 fuel pump had a pinhole leak. 74 SOLAS (04) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 November 2017
Resolved 14 November 2017
Resolution: Crew copped and replaced the damage cooper line. Corrected on the spot.