Records from 2007 to 2026. Most recent: inspection, 5 June 2026.
Inspection history · 42
5 June 2026
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8392936
14 July 2025
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8185500
14 May 2025
Annual Inspection
Physical examination · Outer Continental Shelf National Center of Expertise · Activity 8136610
25 July 2024
Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7967530
9 August 2023
Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7764598
8 May 2023
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7684065
13 February 2023
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7635932
7 October 2022
Annual Inspection · Administrative Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7575294
3 August 2022
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7580652
20 June 2022
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7482254
24 February 2022
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7437880
15 July 2021
Administrative Inspection · COI Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7258301
1 October 2020
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7072343
22 May 2020
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6971993
20 April 2020
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 6941651
16 October 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6835703
19 June 2019
Damage Survey
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 6719461
18 June 2019
COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6710914
13 September 2018
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6535203
11 September 2018
Damage Survey
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 6538410
14 August 2018
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6538936
23 March 2018
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6377259
21 November 2017
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6311097
16 October 2017
Plan Review (Other than "T")
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6288835
7 September 2017
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6262004
21 July 2017
Administrative Inspection · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6235771
11 May 2017
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6143665
15 October 2016
Administrative Inspection
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 6022942
6 July 2016
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5933044
24 August 2015
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5761487
2 October 2014
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4997747
8 August 2014
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4948364
23 June 2014
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4897384
9 June 2014
COI Inspection · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4872569
30 July 2012
Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4409439
18 July 2011
In-Service Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4137426
17 March 2009
COI Inspection · Initial Certification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3447427
15 February 2009
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3418832
11 February 2009
Plan Review (Other than "T")
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3416008
22 June 2008
Type not recorded
No type recorded · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 3329967
25 April 2008
Construction Oversight
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3383649
6 February 2007
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2867788
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 7 October 2022
Resolved
All emergency equipment shall be maintained in good condition at all times. Lifeboat B found with air system not fully charged IAW manufacturer requirements. 33CFR146.15
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2022
Resolution: QNE provided PIC report attesting to proper charge in life boat air system.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 7 October 2022
Resolved
All emergency equipment shall be maintained in good condition at all times. Deficiency report for previous 5 year and annual exams from 2022 and 2021 not closed out. 33CFR146.15
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 December 2022
Resolution: QNE provided report attesting to proper repair of LB and LB being placed back in service.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 22 May 2020
Resolved
The emergency equipment provided shall be maintained at all times. Qtr maintenance by OEM recommends lubrication of cables. Both LB’s and RB cables require lubrication. Lubricate all. Noted that monthly maintenance of releasing gear is not being conducted. Harmonize with OEM recommendations.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2020
Resolved 25 June 2020
Resolution: OIM statement on his license and PO's for lubricants as well as new monthly maintenance sheets.
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 13 September 2018
Resolved
FCC Station license not onboard. Change of ownership was 1Jul18. FCC License application was after 10Sep18.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2018
Resolved 5 November 2018
Resolution: Received documentation from [name withheld] of Fieldwood energy about completion of certificate.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 September 2018
Resolved
Verify UPV 5 year inspections. Deterioration was noted in previous reports. No U1A’s available for comparison. Provide U1A’s and report for evaluation.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 October 2018
Resolved 1 October 2018
Resolution: [name withheld] of Fieldwood provided information to complete the item.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 21 July 2017
Resolved
Emergency equipment provided shall be maintained in good condition. Third party servicer report dated 3 Apr2017 notes one (1) page of discrepancies (attached as Encl 1) showing that fifteen (15) dry chemical (PK/K/ABC) extinguishers required servicing (e.g. hydrostatic, damaged, condemned, not pressurized).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 August 2017
Resolved 8 August 2017
Resolution: Received a letter (see documents) from [name withheld], Noble Energy’s compliance coordinator, attesting that emergency equipment identified as deficient by Total Safety were corrected.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 21 July 2017
Resolved
Emergency equipment provided shall be maintained in good condition. Third party servicer report dated 3 Apr2017 notes two (2) pages of discrepancies (attached as Encl 1) showing that eight (08) carbon dioxide (CO2) extinguishers required servicing (e.g. hydrostatic, empty).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 August 2017
Resolved 9 August 2017
Resolution: Received a letter (see documents) from [name withheld], Noble Energy’s compliance coordinator, attesting that emergency equipment identified as deficient by Total Safety were corrected.
Operations/Management › Pollution › Control of Garbage
Issued 21 July 2017
Resolved
The master or person in charge shall ensure records of garbage discharge/disposal.
Records provided are not certified as required and do not provide all required infom1ation.
Revise and provide proof of remedy/correction.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 21 August 2017
Resolved 2 August 2017
Resolution: Noble completed revisions to its Thunder Hawk Waste Management Plan - Tier 4 and Refase Log to improve efficiencies and include all required information. These revisions (attached) were completed and distributed to offshore personnel on July 26, 2017.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 21 July 2017
Resolved
Each applicant must submit three (3) copies of General Arrangement Plans. Provided fire control plan(s) lack required approval. Submit plans and display approved General Arrangement Plans.
Condition: Invalid
Action required: 705 - Other - as specified
Due 21 August 2017
Resolved 2 August 2017
Resolution: Previously posted approved plans bearing the Murphy (prior operator) corporate logo were replaced in required locations pending approval of plans having Noble Energy logos.
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 July 2017
Resolved
Electrical installations on vessels must ensure maintenance of systems integrity per cite.
Temporary conductor (extension cord) was in use to power a cooling media pump. Replace/repair to original condition.
Condition: Improper/Lack of Maintenance
Due 4 August 2017
Resolved 2 August 2017
Resolution: The cooling fan for the Variable Frequency Drive
(VFD) was replaced and the extension cord removed and stored on July 21, 2017 during the
inspection.
For questions or additional information, please contact the unders
Engineering › Pressure Vessel › Shell Plate
Issued 21 July 2017
Resolved
Pressure vessels subject to corrosion shall be as required by UG-25 of section VIII of the ASME Boilder and Pressure Code. The provided report for Airdyner vertical tank ser# 570463-570464 indicates that corrosion exceeds allowances per form U-1A dated 5NOV2007. The tank shall be repaired/replaced to original condition.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 August 2017
Resolved 9 August 2017
Resolution: Received a letter (see documents) from [name withheld] of Noble Energy requesting that the issued air receiver deficiency be rescinded. Provided letter included a photo of the data plate and Form R-2 showing a MAWP de-rating from 200 to 178 psi.
Lifesaving › Lifeboat › Self-contained Air Support System
Issued 6 July 2016
Resolved
Air supply lines leaking, not holding pressure. Permanently repair air supply lines.
Due 22 July 2016
Resolved 25 July 2016
Resolution: New air hoses installed in air system.
Electrical › Electric Supply System (service) › Battery Installation Ventilation
Issued 24 August 2015
Resolved
Ensure battery boxes for fire pump diesel engines have openings to allow for the escape of gas.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 September 2015
Resolved 26 August 2015
Resolution: Received email verification of correction.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 24 August 2015
Resolved
Ensure proper operation of fire dampers for gas turbine generators.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 September 2015
Resolved 8 September 2015
Resolution: Received email verification of correction.
Electrical › Electric Generation Source (emergency) › Generator
Issued 24 August 2015
Resolved
Emergency generator was not aligned to start automatically. Ensure properly lined up for auto start in the case of emergency.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 August 2015
Resolved 24 August 2015
Resolution: System correctly aligned in presence of Marine Inspector.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 24 August 2015
Resolved
Multiple electrical boxes in production deck hazardous areas were not marked as approved equipment. Provide proof these boxes are approved for these hazardous areas.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 24 September 2015
Resolved 2 September 2015
Resolution: Received email verification of correct components installed in boxes.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 28 May 2014
Resolved
MCC space has multiple areas that do not have Rise system in place as per A60 requirement
Due 11 July 2014
Resolved 21 August 2014
Resolution: Proof provided with detailed testing procedures on repaired Rise system
Fire Fighting › Fire Main › Condition
Issued 28 May 2014
Resolved
Fire pump A inop
Condition: Damaged By Earlier Event
Due 17 June 2014
Resolved 23 June 2014
Resolution: Fire pump has been repaired and is operational
Lifesaving › Launching Appliances › Winch
Issued 28 May 2014
Resolved
Lifeboat B winch brake release inop. Requiring replace (due to multiple attempts at repairing).
Condition: Improper/Lack of Maintenance
Due 24 June 2014
Resolved 8 July 2014
Resolution: Brake system is working IAW with specs
Lifesaving › Rescue Boat › Construction
Issued 28 May 2014
Resolved
Fast response craft was found to have numerous deficiencies including inoperable bucket and broken fuel gauge. NORSAFE 3rd party report numerous issues as well.
45 day extension granted on rescue boat. Unit has furnished a rental until repairs can be made.
Due 8 August 2014
Resolved 5 August 2014
Resolution: Vessel rep provided statement of fact that the lifeboat had been refurbished.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 28 May 2014
Resolved
Emergency generator (outboard facing) ventilation louver does not self close. Repair/replace to original conditional.
Condition: Improper/Lack of Maintenance
Due 10 July 2014
Resolved 8 July 2014
Resolution: NVIC 9-97 Change 1 states that the lover system does not have to be A class. Opened in error.
Engineering › Generator (propulsion/auxiliary-electric) › Generator Excitation Circuitry
Issued 4 March 2009
Resolved
Re-install exciter on emergency generator and prove proper operation of generator to the satisfaction of the Coast Guard Marine Inspector.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 29 June 2009
Fire Fighting › Miscellaneous Items › A Class Division Penetrations
Issued 4 March 2009
Resolved
Demonstrate compliance with 46 CFR 111.105-33 for all electrical installations in hazardous locations.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 June 2009
Fire Fighting › Fire Main › Pressure
Issued 4 March 2009
Resolved
Demonstrate fire protection system for helicopter landing deck is capable of discharging from each hose at 100 PSI prior to helicopter fueling operations.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 17 March 2009
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 4 March 2009
Resolved
Demonstrate man-overboard drill with fast rescue craft.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 June 2009
Documentation › Certificates/Documents › Cargo Ship Safety Construction Certificate
Issued 4 March 2009
Resolved
Satisfy ABS comment to provide manufacturer’s certification on penetration sealing systems.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 June 2009
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 4 March 2009
Resolved
Demonstrate compliance with 46 CFR 58.60 and 46 CFR 111.107 for all industrial systems.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 17 March 2009
Documentation › Manuals/Policy Documentation › Operations Manual (Incinerator)
Issued 4 March 2009
Resolved
Obtain approval of Operating Manual and Construction Portfolio.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 June 2009
Documentation › Safety Management System › Emergency Drill/Exercise Programs
Issued 4 March 2009
Resolved
Obtain USCG approval of Emergency Evacuation plan (EEP) IAW 33 CFR 146.140.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 6 March 2009
Resolution: CG Marine inspector approved Emergency Evacuation Plan.
Operations/Management › Navigation Safety › Proper Use of Navigation/Anchor Lights
Issued 4 March 2009
Resolved
Install omni-directional red obstruction light on flare boom.
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 17 March 2009
Communications › Alarms/Indicators › General Alarm
Issued 4 March 2009
Resolved
Once offshore and operating all machinery/equipment, demonstrate that the general alarm signal produces minimum sound pressure levels above ambient noise levels as required by 46 CFR 113.25-12 and 46 CFR 113.50-15 for public address system.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 17 March 2009
Fire Fighting › Fire Pumps › Power Source
Issued 4 March 2009
Resolved
Prove proper operation of both diesel-driven fire pumps to include alarms and shutdowns.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 17 March 2009
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Valves
Issued 4 March 2009
Resolved
Prove proper operation and adequate coverage of the deluge fire suppression system, to include isolation valves and operation of Control Room electronic displays.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 June 2009
Communications › Alarms/Indicators › Fire Alarm
Issued 4 March 2009
Resolved
Prove installation and proper operation of all gas detectors to include cause and effect verifications prior to hydrocarbons on platform.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 June 2009
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Valves
Issued 4 March 2009
Resolved
Prove operation of Control Room electronic displays for management of fire water isolation valves (to hull) on each column top.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 June 2009
Fire Fighting › Remote Fuel Shutoff › General
Issued 4 March 2009
Resolved
Prove proper operation of ESDs (Emergency Shutdowns) prior to hydrocarbons on platform.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 June 2009
Communications › Alarms/Indicators › Ballast Alarm
Issued 4 March 2009
Resolved
Prove proper operation of hull draft sensors.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 June 2009
Fire Fighting › Fire Hoses › Condition
Issued 4 March 2009
Resolved
Conduct annual fire hose hydrostatic tests on fixed hose reels and replace solid hose (MD-FE-14).
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 June 2009
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 4 March 2009
Resolved
Install and demonstrate fire extinguishing system for production deck paint locker (DZZ-9210) prior to stowage of paint.
Action required: 705 - Other - as specified
Resolved 29 June 2009
Fire Fighting › Fixed CO2 Fire Extinguishing System › Remote Pulls
Issued 4 March 2009
Resolved
Relocate manual pull stations for export compressor fixed CO2 System for safe & simple access.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 29 June 2009
Fire Fighting › Fixed CO2 Fire Extinguishing System › Nozzle
Issued 4 March 2009
Resolved
Resolve with ABS the installation of missing dirt traps on fire suppression systems in Solar Turbine generator enclosures. See ABS Houston Letter ref.294853 dated 22 Feb 2008. Solar DWG No. 3A462-149463 shows no dirt traps, and has damper activation tube in location where dirt trap should be.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 17 March 2009
Lifesaving › Inflatable Liferafts › Markings
Issued 4 March 2009
Resolved
Stencil "THUNDER HAWK" on top of lifeboat IAW 46 CFR 108.645A(a)(3).
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 29 June 2009
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 4 March 2009
Resolved
Resolve with [name withheld] the approval of the unit's Station Bill, Safety Plan and Fire Control Plan
Action required: 705 - Other - as specified
Resolved 29 June 2009
Documentation › Markings/Placards › Warning Signs
Issued 4 March 2009
Resolved
Post Hazardous Area Plan.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 29 June 2009
Operations/Management › Drills/Instruction › Safety Orientation
Issued 4 March 2009
Resolved
Provide training material onboard vessel as required by 46 CFR 109.213(g).
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 June 2009
Lifesaving › Rescue Boat Equipment › Instructions (engine start/operation)
Issued 4 March 2009
Resolved
Provide manufacturer's instructions for maintenance of lifesaving appliances onboard lifeboat.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 June 2009
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 4 March 2009
Resolved
Conduct annual cargo loading hose hydrostatic tests prior to loading operations.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 6 March 2009
Resolution: Satisfactory hydrostatic tests conducted on cargo hoses.
Fire Fighting › Fire Main › Pressure
Issued 4 March 2009
Resolved
Replace fire-main PSI gauges in the column tops and hull with appropriate range gauges; i.e.:400 PSI gauge for 200 PSI system.
Action required: 705 - Other - as specified
Resolved 29 June 2009
Fire Fighting › Fire Main › Condition
Issued 4 March 2009
Resolved
Demonstrate proper function for fixed fire extinguishing systems on compressor turbine enclosures.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 29 June 2009
Fire Fighting › Fixed High-Expansion Foam Fire Extinguishing System › Foam Generator
Issued 4 March 2009
Resolved
Provide documentation that “door fan test” was satisfactorily completed for FM- 200 system in MCC space.
Action required: 705 - Other - as specified
Resolved 29 June 2009
Lifesaving › Lifeboat › Carriage Requirement
Issued 4 March 2009
Resolved
Post operating instructions in vicinity of all survival craft IAW 46 108.655.
Action required: 705 - Other - as specified
Resolved 17 March 2009