Inspection history · 39
2 September 2025
In-Service Inspection · Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 8226511
11 June 2025
Deficiency Check · COI Inspection · MTSA Verification · Administrative Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 8157036
30 September 2024
Administrative Inspection · Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 8011939
3 September 2024
Administrative Inspection · Annual Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7995616
30 June 2023
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7733298
29 June 2023
Hull Examination · Internal Structural Exam · Administrative Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7742694
12 May 2023
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7687041
26 October 2022
Administrative Inspection · MTSA Verification
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7584318
15 September 2022
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7560424
22 November 2021
Type not recorded
No type recorded · Station Freeport · USCG Heartland District (CGD-H) · Activity 7356724
5 November 2021
Annual Inspection · Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7347837
25 August 2021
In-Service Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7296557
14 November 2020
Deficiency Check · Damage Survey · Administrative Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7095921
31 August 2020
Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7046776
26 August 2020
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7043227
3 July 2020
Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6994679
20 April 2020
DAPI Audit · Initial Certification · MTSA Verification · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6973590
28 November 2018
In-Service Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6588498
14 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6511413
11 October 2017
Administrative Inspection · Damage Survey
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6287171
20 September 2017
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6286960
23 May 2012
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4319567
18 May 2012
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4318979
22 September 2011
Industry Initiated Exam · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4161410
20 September 2011
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4150493
20 September 2011
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4155172
1 October 2010
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3861019
24 May 2010
MTSA Verification
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3745893
7 July 2004
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2125402
7 November 2001
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1476459
6 December 1999
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 144820
28 August 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 56223
8 July 1997
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 47656
8 July 1997
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 195251
8 July 1997
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 756182
19 August 1996
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 191092
19 August 1996
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 757681
7 September 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 19057
29 December 1992
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 36174
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 2 September 2025
Resolved
A vessel must be operated in accordance with applicable laws and regulations and in such a manner as to afford protection against hazards to life, property, and the environment. Recieved a report of a soft grounding. Vessel required to be made available to USCG MI to conduct post casualty assment to assess bilges/internal structures, testing machinery, steering, prior to commercial operation. 46 CFR 140.205(a) 17c
Action required: 705 - Other - as specified
Resolved 3 September 2025
Resolution: Satisfactory assessed vessel.
09 - Working and Living Conditions › 091 - Living Conditions › Galley, handlingroom (maintenance)
Issued 24 June 2025
Resolved
An exposed hazard such must be protected by a cover, guard or rail. The stove top guard rail must be secured to protect the crew from hot surfaces. 46CFR144.820
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2025
Resolved 8 July 2025
Resolution: Recieved satisfactory evidence the galley guard was properly re-installed, with missing bolts permenantly attached.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 24 June 2025
Resolved
Electrical conductors passing though watertight bulkheads must be installed so that the bulkhead remains watertight. Electric power supply cord passing from the aft search light through the bulkhead needs to be re-sealed. 46CFR143.400(h)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2025
Resolved 8 July 2025
Resolution: Port enginer provided pictures of new through bulkhead gland installed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 June 2025
Resolved
Electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Batteries stored loosely on the deck and in buckets must be stored and secured to prevent electrical hazards. Battery supply for generators must be secured to the satisfaction of the USCG. 46CFR143.205
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2025
Resolved 8 July 2025
Resolution: Battery storage box re-installed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 June 2025
Resolved
Each vessel must be designed and constructed to minimize fire hazards insofar as reasonable and practicable. The oxygen and LPG tanks were stored improperly in their designed location. Each tank must be secured as designed to prevent a hazardous condition from existing. 46CFR144.405
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2025
Resolved 8 July 2025
Resolution: Picture evidence of LPG Tanks were properly relocated inboard.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 June 2025
Resolved
Each vessel must be designed and constructed to minimize fire hazards insofar as reasonable and practicable. The laundry area 220v junction box needs to have blank covers installed. The dryer vent must be installed in a manner not to create fire hazard. The washer and dryer need to have sufficient arrangements to secure to deck or bulkhead. 46CFR144.405
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2025
Resolved 8 July 2025
Resolution: New 220v. junction box with proper cover installed, washer and dryer permenantly mounted and secured to the vessel.
10 - Safety of Navigation › N/A - No Subsystem › Bridge Navigation Watch Alarm System (BNWAS)
Issued 24 June 2025
Resolved
Except as provided in paragraph (d) or (e) of this section, a towing vessel with overnight accommodations and alternating watches (shift work), when pulling, pushing or hauling alongside one or more barges, must have a system to detect when its master or mate (pilot) becomes incapacitated. Prior to conducting commercial operations as indicated in the first sentence of this paragraph, vessel must have an installed Bridge Navigation Watch Alert System in accordance with all the provisions of 46CFR142.450 or provide a second person in the pilothouse. 46CFR143.450(a)
Action required: 705 - Other - as specified
Due 24 July 2025
Resolved 8 July 2025
Resolution: Vessel currently employs 2 person watch system for u/w nav watches.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 24 June 2025
Resolved
Fire detection control panel must; Visual alarm systems to identify the zone or zones of orgin of a fire. Operator tested detector in engine room, panel alarmed with Zone 9 which was not on the fire detection system key that identified proper locations for detectors and zones of the installed system. Re-map the fire detection system to include all fire zones and detector locations on the fire detection system key. 46CFR142.330(a)(4)(iii)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2025
Resolved 8 July 2025
Resolution: Re-mapped the fire detection system, provided proper location key, including servicing report.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 June 2025
Resolved
An exposed hazard such as gears and rotating machinery, must be protected by a cover, guard or rail. Starboard aft engine room electric motors on outboard bulkhead were observed not having a protective cover over rotating motor shaft. 46CFR144.820
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2025
Resolved 8 July 2025
Resolution: Picture evidence provided that protective guard was re-installed with replacing the missing bolts during the observed condition.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 24 June 2025
Resolved
Each towing vessel must be equipped with an industrial type of first aid cabinet or kit, appropriate to the size of the crew and operating conditions. Each towing vessel operating on oceans, coastwise routes must have a means to take blood pressure readings, splint broken bones, and apply large bandages for serious wounds. Operator needs to replenish all of supplies in first aid kit and include replacing splints and providing means to take blood pressure readings, and materials to apply large bandages for serious wounds. 46CFR140.435
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2025
Resolved 8 July 2025
Resolution: Reciept provided to showign the purchase of the missing items. and Photograph showing the items in the first aid cabinet.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 June 2025
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Generator raw water cooling hoses were observed to only have one hose clamp. Afix two hose clamps per each end of the hose on all vital systems. 46CFR143.540
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2025
Resolved 8 July 2025
Resolution: Additional Hose clamps were installed. documented by picture evidence.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 25 September 2024
Resolved
Machinery systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Install proper machinery guard on the FWD air compressor.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 October 2024
Resolved 30 September 2024
Resolution: Machinery Guard installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 September 2024
Resolved
Electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Properly support STBD generator battery charger wiring.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 October 2024
Resolved 30 September 2024
Resolution: Wires properly routed and supported.
09 - Working and Living Conditions › 091 - Living Conditions › Laundry
Issued 25 September 2024
Resolved
Machinery systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Install lint trap and route proper piping
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 October 2024
Resolved 30 September 2024
Resolution: Lint trap installed.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage of rescue boats
Issued 25 September 2024
Resolved
Liferaft has a gate or other suitable opening large enough to allow the liferaft to be pushed directly overboard. Install pin to prevent gate from opening.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 October 2024
Resolved 30 September 2024
Resolution: Pin installed and support bracket made to assist pin extraction.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 5 November 2021
Resolved
Where practicable and except as provided in § 144.515, each space where crew may be quartered or normally employed must have at least two means of escape. Port quarter engine room emergency exit spring is not attached, Emergency exit is too heavy for the smallest crew member to operate. Repair hatch ensuring that every crew member can operate it. 46CFR144.500
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 November 2021
Resolved 22 December 2021
Resolution: Hatch was repaired to the satisfaction of the USCG.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 August 2021
Resolved
systems, must be maintained to ensure proper operation.
Vessel experience high temperature in stbd transmission while underway with a barge in tow. Provide report after repair has been conducted and coordinate proper operation in the presence of the attending USCG marine inspector.
46 CFR 143.205 (c)(1)
Action required: 17 - Rectify deficiencies prior to departure
Due 8 September 2021
Resolved 5 November 2021
Resolution: VSL's red gear tested U/W. Test SAT.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 19 January 2021
Resolved
Port and Starboard Doors for main deck not fully sealing against gaskets.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 January 2021
05 - Radio Communications › N/A - No Subsystem › MF Radio installation
Issued 25 June 2020
Resolved
Vessel must be equipped with a single side band radio for routes listed on COI. Vessel does not have a single side band radio. Vessel is restricted to operations within 20 nautical miles.
Action required: 705 - Other - as specified
Resolved 3 July 2020
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 25 June 2020
Resolved
Vessel must have a valid FCC Safety Radiotelephony
Certificate. SSB radio was not surveyed
according to Certificate.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 3 July 2020
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 25 June 2020
Resolved
Electrical equipment must minimize system failure and fire and shock hazards. Bus bridge must be installed to prevent both generators from operating simultaneously.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 31 August 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 June 2020
Resolved
Exposed hazards such as rotating machinery must be protected. Engine room had several areas of exposed rotating machinery.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 31 August 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 June 2020
Resolved
Fuel systems must be maintained to prevent spills of fuel. Fuel filters did not have fuel filter bowls.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 31 August 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 June 2020
Resolved
Propulsion machinery must be maintained to ensure proper operation. Vibrations have worn fuel pipes on main engines in the engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 31 August 2020
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 25 June 2020
Resolved
Line throwing appliances must be approved under 160.040.
Vessel is missing 3 line throwing appliances.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 31 August 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 June 2020
Resolved
Water heaters must be designed for safe operation. The safety relief valve must be oriented correctly.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 31 August 2020
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 25 June 2020
Resolved
Electrical equipment must minimize system failure and
fire and shock hazards. Surge protector cannot be daisy chained.
Action required: 10 - Deficiency Rectified
Resolved 25 June 2020
Resolution: Operator fixed electrical equipment arrangement.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 14 August 2018
Resolved
MMSI: Vsl is broadcasting invalid MMSI
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 January 2019
Resolved 17 January 2019
Resolution: Vessel operator acknowledged the AIS discrepancy and provided proof from the AIS website.