MAURY USCG vessel records
← All vessels

LITTLE LADY II

LITTLE LADY II is a 2007 passenger vessel (inspected). The Coast Guard has recorded 24 inspections since 2016, most recently in April 2026, along with 15 deficiencies, 1 operational control and 5 casualty investigations between 2009 and 2022.

Records from 2009 to 2026. Most recent: inspection, 1 April 2026.

Built
2007
Last inspected
1 April 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 1 April 2026
…with no type recorded4
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDE7746
869085
Flag
UNITED STATES
Maury page id
psix-869085

Documentation record

Registered dimensions (L × B × D)64.9 ft × 22.0 ft × 6.0 ft
Registered tonnagegross 27 / net 22
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSEA TAXI CATAMARANS, INC. · OPA LOCKA, FL, UNITED STATES · built 2007
Hull materialFRP (Fiberglass)
PropulsionDiesel Direct
Hull shapeShip
Hull configurationTwin Hull
Hailing portJERSEY CITY, NJ
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 19 August 2025 · expires 30 September 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it22 - Simplified, Net Ton
27 - Simplified, Gross Ton
38 - Displacement, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

MISS NEW JERSEY Passenger (Inspected) · MISLE 365120 · 12 December 2019 · activity 6873280

Inspection history · 24

1 April 2026 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8333641
12 June 2025 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8157607
25 April 2025 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8120253
12 June 2024 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7932433
13 June 2023 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7713809
6 April 2023 Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7662329
13 June 2022 Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7469898
13 May 2022 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7449888
3 May 2022 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7443273
30 September 2021 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7448517
3 March 2021 Examination of Repairs · Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7149348
24 July 2020 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7014820
12 December 2019 Damage Survey · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6872828
12 December 2019 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6873280
17 July 2019 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6752967
7 March 2019 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6751147
23 January 2019 Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6614167
22 January 2019 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6626408
13 June 2018 Annual Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6444467
3 January 2018 Deficiency Check · Administrative Inspection
Physical examination · Navigation Center · Activity 6331954
29 June 2017 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6190394
13 February 2017 Administrative Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6087175
19 August 2016 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5977573
20 July 2016 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5946793

Deficiency record · 15

11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 1 April 2026 Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. Placard for life jacket model # S225RT is missing, post placards.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2026
Resolved 8 April 2026
Resolution: Rectified.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 1 April 2026 Resolved
The owner, managing operator, or a qualified servicing facility as applicable must conduct the following inspections and tests. Monthly inspections required by NFPA 10 may be conducted by the owner, operator, person-in-charge, or a designated member of the crew. Monthly inspections of fire extinguishers were not completed and logged.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2026
Resolved 8 April 2026
Resolution: Monthly inspection of fire extinguishers were completed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 1 April 2026 Resolved
Unless other means are provided to ensure that a potential waste receptacle fire would be limited to the receptacle, waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. Waste receptacle is constructed of plastic.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2026
Resolved 2 April 2026
Resolution: Rectified, other means are provided to prevent a fire.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 1 April 2026 Resolved
Each lighting fixture globe, lens, or diffuser must have a guard or be made of high strength material. Replace stbd side broken light fixture in the lazarette space.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2026
Resolved 18 May 2026
Resolution: Deficiency rectified. Light fixture and connection were replaced with new connection and light.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 1 April 2026 Resolved
Each child size life jacket must be stowed in a location that is appropriately marked and separated from adult life jackets so the child size life jackets are not mistaken for adult life jackets. Child life preservers were not stowed separate from adult life jackets. Ensure child life jackets are stowed separately from adult life jackets.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2026
Resolved 2 April 2026
Resolution: Barrier between child and adult life jackets.
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 1 April 2026 Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Dead end wire found in port outboard side of Generator. Repair or remove wires.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2026
Resolved 8 April 2026
Resolution: Dead end wire removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 June 2025 Resolved
A submersible electric bilge pump may be used as a power bilge pump required by table 182.520(a) only on a vessel of not more than 19.8 meters (65 feet) carrying not more than 49 passengers other than a ferry, provided that: (7) a positive shut off valve is installed at th e hull penetration. The following sea cocks were observed to be seized: Port: Forepeak, Generator Space, Fuel Tank Void, Engine Compartment, Lazarette. STBD: Forepeak, Laz. Additionally the STBD Engine compartment is unable to completely close due to proximity to bilge piping and requires modification to properly close. 46 CFR 182.520 (e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 23 June 2025
Resolution: MI observed all listed seacocks were replaced. All appeared in good order.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 June 2025 Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protected devices must be in satisfactory condition. Existing penetration in STBD forepeak is not permanently capped/terminated. 46 CFR 176.830 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 23 June 2025
Resolution: Firestop was placed in the STBD Forepeak
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 12 June 2025 Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. If the handle to the shutoff valve at the tank is located inside the machinery space, it must be located so that the operator does not have to reach more than 300 millimeters (12 inches) into the machinery space and the valve handle must be shielded from flames by the same material the hull is constructed of, or some noncombustible material. STBD Engine fuel shutoff valve shielding is wasted and not providing proper shielding. 46 CFR 182.455 (b)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2025
Resolved 23 June 2025
Resolution: Vessel replaced the shielding for both Port and Stbd Fuel Shutoff valve
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 12 June 2024 Resolved
A vessel with a power driven main steering gear must be provided with the following: an independent rudder angle indicator at the operating station. MI observed in port side steering space, an emergency steering station with no rudder angle indicator. Vessel must install means of providing rudder angle indcator at that operating station. 46 CFR 182.610
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2024
Resolved 14 June 2024
Resolution: Recieved email with photo confirmation of double clamping for bilge hoses. Additionally receieved receipt of rudder angle indcator system for e-steering position. Qualified MI reviewed photos and accepted.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 12 June 2024 Resolved
In systems and appliances where flexible hoses are permitted to be clamped, double hose clamping is required where practible. MI observed bilge dewatering system with flex hoses in both port and starboard steering flat without double clamping. Hoses must be double clamped. 46 CFR 182.410(d)(1)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2024
Resolved 14 June 2024
Resolution: Received photo evidence of double clamping of hoses.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 May 2022 Resolved
The construction and arrangement vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull,protection against fire, means of escape in case of sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. On 03MAY2022, vessel reported loss of power/loss of propulsion. Prior to passenger operations, vessel shall submit repair plan for all impacted equipment, provide technician report attesting to operation of impacted machinery, and provide causal analysis report. 46 CFR 177.2100, 701c
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2022
Resolution: A USCG Marine Inspector attended LITTLE LADY II (1194797) earlier today (13JUN2022) and cleared the remaining deficiency. Operator sent a satisfactory causal analysis/technician report. MI documented reported under vessel’s profile. MI witnessed satisf
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 24 July 2020 Resolved
Fire Insulation is missing on overhead hatches in port and starboard enginge rooms; insulation is not fastened to overhead in port generator room. 46CFR177.410(c)(4)
Action required: 705 - Other - as specified
Due 27 July 2020
Resolved 27 July 2020
Resolution: Received email and pictures.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 December 2019 Resolved
replace clutch circuit board and prove proper operation of the control system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 December 2019
Resolution: Vessel made in kind replacement of the clutch relay circuit card and proved proper operation.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 12 December 2019 Resolved
fix the railing and fiberglass attachment point.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 December 2019
Resolution: Vessel made proper repairs to the stbd fwd aluminum rail, all sat.

Casualty record · 5

21 August 2009Routine · role: Involved in a Marine Casualty · activity 3572729
19 August 2016Routine · role: Involved in a Marine Casualty · activity 5977573
22 January 2019Routine · role: Involved in a Marine Casualty · activity 6626408
12 December 2019Routine · role: Involved in a Marine Casualty · activity 6873280
13 May 2022Routine · role: Involved in a Marine Casualty · activity 7449888
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.