Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
1190 - Simplified, Gross Ton
1190 - Simplified, Net Ton
Maury page id
psix-872925
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 6 October 2025Resolved
Each tank vessel must meet the applicable requirements in Sub-chapter S of this chapter.
Marine Safety Center (MSC) review has not been completed and subsequent documentation provided to the cognizant OCMI following the Dead-weight Survey conducted on 09/30/2025.
Provide a copy of the MSC Approval and all related documents for the Dead-weight Survey.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 October 2025
Resolution: Professional Engineer provided a copy of the MSC correspondence for the new Deadweight Survey.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 3 August 2025Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7 millimeter (0.5 inch) diameter and is at least 25.4 millimeters (1 inch) long. It must be located at the top of the flange face, midway between boltholes, and in line with the bolthole pattern.
MI observed missing vapor stud at the vapor connection on both port and starboard vapor connections flange faces.
Vessel REP shall provide objective evidence to the satisfaction of the attending Marine Inspector that there is now a permanent stud on both vapor connections flange faces.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 October 2025
Resolution: Vessel provided objective evidence to MI that vapor line studs had been permanently installed on the vapor collection flanges.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 3 January 2023Resolved
All pressure vessels not exempted under provisions of § 54.01-15 shall be inspected by a marine inspector referring to procedures outlined in UG-92 through UG-103 of section VIII of the ASME Boiler and Pressure Vessel Code. All gages shall be calibrated against a standard dead weight tester or a calibrated master gage. Gages shall be re-calibrated at any time that there is reason to believe that they are in error. Marine Inspectors identified air receiver gauge non functioning. Repair unit and/or replace with calibrated and functioning gauge.
***Prior to carriage of cargo is intended to mean prior to unloading of cargo and/or any use of air receiver.***
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2023
Resolved 7 January 2023
Resolution: Crew removed/replaced the faulty gage. Documentation has been provided showing gage installed and working properly.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 26 August 2019Resolved
P/V valve test date exceeded 1 year.
33 cfr 156.170(f)(3)(g)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 September 2019
Resolved 27 August 2019
Resolution: Vsl rep sent documentation of inspection of the p/v valve.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 19 April 2016Resolved
The ground detection for the 240V panel is inoperable due to a failed component.
Action required: 705 - Other - as specified
Due 31 May 2016
Resolved 31 May 2016
Resolution: Ground detection is working properly for the 240v system.
Liquid overfill protection: Audible portion of the alarm system is inoperable. Ensure alarms are working properly prior to loading any cargo Grade A and lower. Vessel can only load Grades D & E Cargo.
Action required: 705 - Other - as specified
Resolved 26 July 2010
Resolution: Vessel''s alarms are in satisfactory operational condition.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 2 May 2008Resolved
Install studs on VCS flanges.
Action required: 705 - Other - as specified
Resolved 15 May 2008
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 2 May 2008Resolved
Properly stencil VCS pipeline.
Action required: 705 - Other - as specified
Resolved 15 May 2008
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 11 April 2008Resolved
Company must provide approved vessel response plan, to the satisfaction of an attending CG marine inspector, prior to cargo operations.
Action required: 705 - Other - as specified
Resolved 7 May 2008
Engineering › Pressure Vessel › Marking and Stamping
Issued 11 April 2008Resolved
Company must provide stamped (by professional engineer) design drawing of pressure vessel . CG must then propeller stamp pressure vessel prior to using /pressurizing. (46 CFR 54.01-18, 54.01-5 (e)).
Action required: 705 - Other - as specified
Resolved 2 May 2008
Resolution: Pressure vessel installation found satisfactory.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 11 April 2008Resolved
Company must provide an approval letter from MSC for vsl's hydraulic crane system prior to operating crane.
Action required: 705 - Other - as specified
Resolved 2 May 2008
Resolution: Crane''s installation and load test satisfactory.