Inspection history · 61
6 March 2026
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8320961
4 March 2026
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8320003
6 October 2025
Administrative Inspection · COI Inspection · MTSA/ISPS Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8244670
8 January 2025
ACP Annual Oversight · Annual Inspection · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8042749
7 January 2025
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8059286
13 May 2024
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7912887
5 January 2024
Annual Inspection · ACP Annual Oversight
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7848043
3 January 2023
MTSA/ISPS Verification · ACP Annual Oversight · Annual Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7615777
24 October 2022
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7583080
6 July 2022
Damage Survey · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7499604
3 January 2022
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7375102
15 December 2021
Annual Inspection · ACP Annual Oversight
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7368855
16 July 2021
Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7257894
13 January 2021
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7123772
5 January 2021
Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7120102
9 October 2020
COI Inspection · MTSA/ISPS Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7057576
13 December 2019
ACP Annual Oversight · MTSA Verification · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6872715
24 July 2019
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6760762
21 June 2019
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6721395
21 June 2019
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6727806
30 April 2019
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6673213
10 April 2019
Examination of Repairs · Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6659848
8 January 2019
MTSA Verification · Annual Inspection · Deficiency Check · ACP Annual Oversight
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6607520
7 August 2018
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6504771
7 July 2018
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6475872
7 July 2018
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6481182
10 January 2018
MTSA/ISPS Verification · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6322181
27 November 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6332004
11 January 2017
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6070637
25 July 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5955615
7 December 2015
Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5778067
14 September 2015
Drydock Exam · ACP Handover Survey · MTSA/ISPS Verification · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5717775
7 September 2015
Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5733639
23 June 2015
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5161548
2 April 2015
In-Service Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 5096462
29 January 2015
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5061648
29 January 2015
Type not recorded
No type recorded · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 5063836
17 October 2014
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5006806
28 July 2014
In-Service Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4938529
6 July 2014
Damage Survey · Examination of Repairs
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 4914939
6 July 2014
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 4933687
21 May 2014
MTSA Verification · Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4864089
10 April 2014
In-Service Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4854214
18 February 2014
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 4805567
12 December 2013
Administrative Inspection · In-Service Inspection · Underwater Inspection in lieu of Drydock
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4768083
29 October 2013
Deficiency Check · Internal Structural Exam · Administrative Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4742954
15 October 2013
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4769863
5 October 2013
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4732064
1 October 2013
In-Service Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4727340
8 August 2013
Type not recorded
No type recorded · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4683892
14 June 2013
Annual Inspection · MTSA Verification · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4620326
30 April 2013
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4610205
28 January 2013
Examination of Repairs · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4524412
18 October 2012
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4466727
14 October 2012
Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4464214
26 July 2012
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4395951
20 June 2012
MTSA Verification · DAPI Audit · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4350411
14 September 2011
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4144816
13 September 2011
Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4144354
23 September 2010
COI Inspection · Construction Oversight · Initial Certification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3855839
11 August 2008
Plan Review (Other than "T")
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 3297387
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 October 2025
Resolved
Electrical installations shall be such that: the safety of passengers, crew and ship from electrical hazards will be ensured. Load Shed Panel (labeled P206) was missing cover and blank. 74 SOLAS (20) II-1/40.1.3
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 November 2025
Resolved 22 October 2025
Resolution: Replaced cover
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 January 2025
Resolved
An embarkation ladder complying with the requirements of paragraph 6.1.6 of the Code extending, in a single length, from the deck to the waterline in the lightest seagoing condition under all conditions of trim of up to 10 & a list of up to 20 either way shall be provided at each embarkation station or at every 2 adjacent embarkation stations for survival craft launched down the side of the ship. The vessel was found to have only 1 embarkation ladder,whereas the vessel's Fire Plan & SOLAS regs require 2 (one on each embarkation station). Ensure the provision of a second embarkation ladder. 74 SOLAS (20) III/11.7
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 January 2025
Resolution: Received class report requiring ladders be provided.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 8 January 2025
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 705 - Other - as specified
Due 8 April 2025
Resolved 10 January 2025
Resolution: Received class report requiring internal audit for SASH compliance be conducted.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 8 January 2025
Resolved
A fixed gas fire-extinguishing system complying with the provisions of the Fire Safety Systems Code. At each location there shall be clear instructions relating to the operation of the system having regard to the safety of personnel. Vessel’s SAPPHIRE fixed firefighting system had incorrect placards for operating instructions. Replace placards with approved placards from manufacturer’s manual.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 February 2025
Resolved 10 January 2025
Resolution: Received class report verifying placards were posted.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 8 January 2025
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. Fire main piping had small pin hole leak along seam of piping. Leak is on the piping below the overhead of the engine room leading after the main fire pump. Repair fire main piping.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 February 2025
Resolved 10 January 2025
Resolution: Received class report requiring piping to be cropped and renewed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 January 2025
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. Main fire pump’s pressure gauge read 25 psi at the pump. Fire hose testing performed at satisfactory pressure with incorrect gauge reading. Renew pressure gauge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 February 2025
Resolved 10 January 2025
Resolution: Received class report verifying pressure gauge replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 January 2025
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. The forward metal plate on the starboard main engine for the turbo washing gear is snapped from the mount. The oil line into the turbo snapped and is capped. Repair broken plate and oil line.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 February 2025
Resolved 10 January 2025
Resolution: Received class report verifying broken plate and oil line are repaired.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 8 January 2025
Resolved
Two means of escape shall be provided from each machinery space of category A. In particular, one of the following provisions shall be complied with:
.1 two sets of steel ladders, as widely separated as possible, leading to doors in the upper part of the space, similarly separated and from which access is provided to the open deck. One of these ladders shall be located within a protected enclosure that satisfies regulation 9.2.3.3, category (4), from the lower part of the space it serves to a safe position outside the space. Self-closing fire doors of the same fire integrity standards shall be fitted in the enclosure;
Emergency escape door at the bottom of the engine room is a watertight door that is not self-closing. Outfit door with self-closing arrangement.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 February 2025
Resolved 10 January 2025
Resolution: Received class report requiring vessel to outfit door with self-closing device.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 January 2025
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. Vessel reported a reduction in propulsion due to turbo malfunctioning while transiting to [name withheld] Terminal near Cross Ledge Light. Vessel is completing remaining transit to [name withheld] Terminal for cargo offload and then will transit to Paulsboro Marine Terminal for repairs, with tug assist. Complete repairs to the satisfaction of Class prior to departing Paulsboro Marine Terminal.
Action required: 705 - Other - as specified
Resolved 10 January 2025
Resolution: Turbo charger was replaced & sat op test conducted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 5 January 2024
Resolved
Vessels approved NOV22 PSTP's did not match what the crew was actually doing to test the Main Engines and Generators. When the C/E was asked for their copy of the PSTP's, the crew only had pages 1-40 out of the 140 page approved PSTP. The shut down and alarm testing was in the pages the crew did not have. The C/E stated he has never tested over speed, hight temp and low lube pressure shut downs/alarms the way the procedures states, they usually call in a third party to test by using a single generator and lowering set point/ parameters. Crew also stated they recently installed a new Kongsberg system. It looks to be power management for the gens but could be automation in general. Which seems like they system was never commissioned/tested by ABS or CG after installation.
Vessel is required to resubmit PSTP's to be approved and tested to the satisfaction for ABS
Vessel is also required to have the new Kongsberg system approved and tested to the satisfaction of ABS.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2024
Resolved 9 January 2024
Resolution: Received ABS report/Finding #512.0. ABS will take responisiblity.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 3 January 2023
Resolved
The main steering gear shall be capable of putting the rudder over from 35 on one side to 35 on the other side in not more than 28 s. Starboard rudder is turning slow while under non followup control from the center bridge console. This is an intermittent issue that seems to correct itself after several minutes. 74 SOLAS (2020Cons) II-1/29.3.2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 January 2023
Resolved 17 January 2023
Resolution: ABS has taken deficiency for action.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 15 December 2021
Resolved
SOLAS (20) II-2 14.2 At all times while the ship is in service, the requirements of paragraph 1.1 shall be complied with. Fire protection systems and fire-fighting systems and appliances shall be maintained ready for use. A smoke detector in the aux machinery space was observed to be covered with plastic wrap.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 December 2021
Resolution: Accepted as condition of ACS.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 15 December 2021
Resolved
SOLAS (20) II-2 4.1 The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met: means shall be provided to control leaks of flammable liquids. The starboard day tank manhole was leaking fuel into the aux space, saturating tank insulation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 December 2021
Resolution: Accepted as condition of ACS.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 December 2019
Resolved
During the annual inspection, the CG requested the vessel to preform certain PSTP tests as written within the procedures. Found some PSTP items were unable to be tested due to the vessel's system configuration. A review of the vessel's PSTP program shall take place specify noting items that are unable to be tested per the approved PSTPs. A list of the PSTPs that are unable to be preformed per the approved procedures shall be submitted to the CG for review. Additionally, the vessel shall submit records showing the remaining PSTPs for CY19 are completed or are noted with a description of why the test could not be preformed. 46 CFR 61.40-6
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2020
Resolved 29 January 2020
Resolution: O/O operated submitted proof the PSTPs were conducted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 21 June 2019
Resolved
Vessel reported an issue with their engine cooling system. Both main diesel engines are operating at 30% load. Diagnose the issue and make appropriate repairs. Prove full load testing of the engines to the satisfaction of a CG marine inspector or ABS surveyor.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 July 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 April 2019
Resolved
Make proper repairs to the #2 generator and prove proper operation to Class.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2019
Resolved 2 May 2019
Resolution: Received ABS Class Report and Tech report clearing the deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 April 2019
Resolved
Vessel lost power while transiting in the Delaware River and the vessel is currently anchored at [name withheld] Anchorage. Provide tech report identifying the cause of the loss of power and prove proper operation of generating plant to the satisfaction of the vessel's authorized Class Society Surveyor and Coast Guard Marine Inspector prior to movement from [name withheld] Anchorage.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 11 April 2019
Resolution: Received Technician's report from Slootmaker Marine Equipment, Inc. identifying the cause of the loss of power and detailing the repairs made. Received Class Surveyor report from ABS attesting to the repairs.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 10 January 2019
Resolved
Prove proper operation of the watertight door switch door switch for both the ER escape, tank level and gallery level door per vessel PSTP 5.1. While on-board, the ships crew were not able to demonstrate the PSTP and the indication system appeared to have a fault.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 February 2019
Resolved 17 January 2019
Resolution: Observed alarm panel from bridge.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 January 2019
Resolved
Correct engine exhaust leak found on starboard main engine.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 February 2019
Resolved 5 February 2019
Resolution: Received ABS report attesting to exhaust repair.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 10 January 2019
Resolved
Prove the sliding type 3 watertight door meets the time requirement of between 20-40sec for closure starting from when the door begins to move. While on-board, CG inspectors observed a closing time of approx 12-15sec
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 February 2019
Resolved 17 January 2019
Resolution: Observed watertight door close in 32 seconds.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 10 January 2018
Resolved
Repair visual indicator for engine room watertight door.
Action required: 705 - Other - as specified
Due 10 February 2018
Resolved 30 January 2018
Resolution: Repaired to satisfaction of ABS Surveyor
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 10 January 2018
Resolved
Repair emergency steering station rudder angle indicator.
Action required: 705 - Other - as specified
Due 10 February 2018
Resolved 30 January 2018
Resolution: Repaired to the satisfaction of ABS Surveyor
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 11 January 2017
Resolved
Address low pressure reading on Aux Machinery Space Sapphire bottle gauge.
Action required: 705 - Other - as specified
Due 25 January 2017
Resolved 26 January 2017
Resolution: Received statement from the C/E that Sea Safety was on board, replaced a leaking schrader valve, and recharged the nitrogen bottle.
Engineering › Diesel Engine (propulsion-reduction gear) › Seal
Issued 11 January 2017
Resolved
Repair jacket water leak on port main engine. Monitor leak during operation of engine when at normal operating temperature.
Action required: 705 - Other - as specified
Due 25 January 2017
Resolved 26 January 2017
Resolution: Received statement from C/E that the gasket on the jacket water cooler was replaced and does not leak.
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 8 December 2015
Resolved
The vessel's port main engine tripped while underway from an overspeed condition. Make main engine available for inspection by the attending USCG marine inspector.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 December 2015
Resolved 9 December 2015
Resolution: Received statement from chief engineer.
Electrical › Electric Generation Source (service) › Generator
Issued 7 September 2015
Resolved
The vessel's spare generator is not operating correctly. Vessel has permission to shift berths to Northeast Ship berth 6 with tug assist. Vessel has installed a temporary generator to the #3 generator engine. Vessel must demonstrate proper installation and operation to the satisfaction of the attending USCG MI.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 September 2015
Resolution: Received tech report from Cummins rep. which detailed the problem and satisfactory testing performed.
Engineering › Sea-water System (primary cooling) › Piping
Issued 29 January 2015
Resolved
A 1.5" - 2" hole was discovered on the overboard piping of the sea water cooling system outboard of the skin valve. Complete temporary repairs prior to movment. Submit statement from Master attesting to the seaworthiness of the vessel prior to movement. Submit plans for permanent repairs
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 January 2015
Resolution: The sea water cooling overboard discharge pipe was cropped 15" and renewed. The existing slip on flange was replaced with a new, welded flange. The repairs were visually examined, and checked for tightness, at operational pressure, and found sat by ABS.
Engineering › Steering Gear System › Power Unit
Issued 17 October 2014
Resolved
NW01 Make satisfactory permanent repiars to the control power supply for the #2 steering gear control unit. Provide causal analsysi and repair method.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 16 November 2014
Resolved 27 October 2014
Resolution: Vessel repaired power supply to #2 steering gear control unit.
Electrical › Electrical Distribution System (service) › Cable
Issued 6 July 2014
Resolved
Overheating of electrical box resulted in electrical conduit melting.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 7 July 2014
Resolution: Replaced in kind.
Engineering › Steering Gear System › Rudder
Issued 12 December 2013
Resolved
Make the vessel available for quarterly underwater inspections of the temporary repair made to the rudder/nozzle system to the satisfaction of the attending MI.
Action required: 705 - Other - as specified
Resolved 12 October 2015
Resolution: Permanent repair made to rudder/nozzle IAW ABS PE approved plans.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 29 October 2013
Resolved
Vessel has a fuel oil leak in the #1 void stbd side. Submit plan proposal to repair and identify use of piping.
Due 29 November 2013
Resolved 31 October 2013
Resolution: Vessel rep submitted plan proposal and identified the piping as a sight glass for an adjacent HFO bunker tank. Leak was repair per the plan. Visual inspection conucted.
Engineering › Compressed Air System (start air) › Valve
Issued 14 June 2013
Resolved
Prove proper operation of start air (air receiver) relief valves.
Action required: 705 - Other - as specified
Due 24 June 2013
Resolved 27 June 2013
Resolution: Proper operation of relieve valves for air receivers has ben verified.
Engineering › Fuel Oil Service System › Valve, Control
Issued 14 June 2013
Resolved
Prove proper operation of fuel shut offs/quick closing valves.
Action required: 705 - Other - as specified
Due 24 June 2013
Resolved 19 June 2013
Resolution: Proper operation of fuel shut offs demonstrated.
Fire Fighting › Ventilation Systems › Ducts
Issued 14 June 2013
Resolved
Prove proper operation of port aft louver.
Action required: 705 - Other - as specified
Due 24 June 2013
Resolved 19 June 2013
Resolution: Proper operation demonstrated.
Fire Fighting › Fire Hoses › Diameter
Issued 14 June 2013
Resolved
Provide 03- 2.5" fire hoses as required by 46 CFR 95.10-10
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 July 2013
Resolved 20 June 2013
Resolution: Vessel provided evidence of 03 new 2.5" fire hoses for the fire stations on the exterior of the vessel.
Engineering › Steering Gear System › Rudder
Issued 28 January 2013
Resolved
Vessel was found to have cracks in rudder system as noted in activity narritive.
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 31 January 2013
Resolution: Repairs were completed as noted in activity narritive.
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 14 October 2012
Resolved
Make satisfactory repairs to port engine and provide technical report. Vessel required to mainatain assist tug on scene.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 October 2012
Resolution: Speed sensors were replaced and satisfactory underway sea trial completed. Received Wartsilla technicians report reflecting same. Vessel fit for route and service specified on COI.
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 20 June 2012
Resolved
Vessel has no copy of the design verification test procedure onboard and is unable to locate a copy. Vessel is required to provide a copy of the approved dvt procedure within 30 days. (46 CFR 61.40-1(c))
Action required: 705 - Other - as specified
Due 20 August 2012
Resolved 19 October 2012
Resolution: Verified copy of DVT on board.
Engineering › Steering Gear System › Piping
Issued 20 June 2012
Resolved
Vessel is required to have permanent piping from the storage tank to the hydraulic oil resevoirs. Currently, a hose is clamped via camlocks and is used as needed to refill the resevoirs. The vessel has 30 days to correct. (46 CFR 58.25-20(c)(2))
Action required: 705 - Other - as specified
Due 20 August 2012
Resolved 19 October 2012
Resolution: Vessel rep. has been granted extension for final repairs until next drydock in 2014.
Electrical › Electric Supply System (service) › Reverse Current Protection
Issued 20 June 2012
Resolved
Vessel was unable to test the reverse power protection using the approved test procedure found in the revised periodic safety test procedures (PSTP). Using an alternate method, the reverse power protection was verified. Vessel is required to determine problem with the approved test procedure and notify OCMI of findings.
Action required: 705 - Other - as specified
Due 30 November 2012
Resolved 28 November 2012
Resolution: Witnessed sat. test of all three generator reverse power relays.
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 20 June 2012
Resolved
Prove starting air receivers meet the construction standards of 46 CFR 54.01-2
Action required: 705 - Other - as specified
Due 20 August 2012
Resolved 16 August 2012
Resolution: Air receivers were approved by ABS and certificates provided.
Engineering › Compressed Air System (start air) › Valve
Issued 20 June 2012
Resolved
Provide starting air receivers with relief valves IAW 46 CFR 54.15
Action required: 705 - Other - as specified
Due 21 July 2012
Resolved 5 July 2012
Resolution: Valves were supplied with foreign built air receivers. Determined they meet the requirements of 46 CFR 54.15.
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 13 September 2011
Resolved
Stbd MDE shutdown on oil demister sensor. VSL not to operate stbd MDE until SAT test run witnessed by marine inspector and tech report received that SAT repairs have been made to stbd mde.
Action required: 705 - Other - as specified
Resolved 22 September 2011
Resolution: Received tech report and class report attesting to the SAT repairs made to the MDE.