MAURY USCG vessel records
← All vessels

JUDY M

JUDY M is a 1965 towing vessel. The Coast Guard has recorded 23 inspections since 2003, most recently in January 2026, along with 56 deficiencies and 2 casualty investigations between 2011 and 2025.

Records from 2003 to 2026. Most recent: inspection, 29 January 2026.

Built
1965
Last inspected
29 January 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

WDE9653
Flag
UNITED STATES
Maury page id
psix-87679

Inspections, by type

…with no type recorded4
Years with a record 16 calendar years (2003–2026)
The 23 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.

Documentation record

Registered dimensions (L × B × D)57.4 ft × 22.0 ft × 9.4 ft
Registered tonnagegross 98 / net 67
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMAIN IRON WORKS INC · HOUMA, LA, UNITED STATES · built 1965
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portGROTON, CT
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 7 July 2026 · expires 31 July 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it67 - Regulatory (Subpart C or D), Net Ton
98 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.

Inspected as a tow unit · 4

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

MOHAWK 2072-24 Freight Barge · MISLE 1815796 · 9 October 2025 · activity 8251424KIRSTEN GRACE Towing Vessel · MISLE 192993 · 15 January 2015 · activity 5054158BRUCE WOOD 543 Freight Barge · MISLE 375653 · 15 January 2015 · activity 5054158DIGNITY Freight Barge · MISLE 430151 · 5 December 2011 · activity 4206494

Inspection history · 23

29 January 2026 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8302529
19 December 2025 Administrative Inspection · Examination of Repairs · Internal Structural Exam · Drydock Exam · Vessel Attendance
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8286555
9 October 2025 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8251424
5 June 2025 Deficiency Check · COI Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8151348
15 August 2024 Deficiency Check · Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7977775
31 January 2024 Annual Inspection · Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7859609
27 July 2023 Drydock Exam · Internal Structural Exam · Examination of Repairs · Administrative Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7746018
8 September 2022 Annual Inspection · Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7552338
18 August 2021 Annual Inspection · Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7291515
6 August 2021 Administrative Inspection
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7278960
14 September 2020 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7057717
18 June 2020 Deficiency Check · Initial Certification · Administrative Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6946972
12 October 2017 Industry Initiated Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6286545
27 April 2016 Risk-based Targeted Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 5879737
6 April 2016 Administration
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 5848422
15 January 2015 Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 5054158
27 March 2012 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 4318657
5 December 2011 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 4206494
22 October 2009 Industry Initiated Exam · Examination of Repairs · MARPOL
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3622461
17 November 2006 Type not recorded
No type recorded · Station Jones Beach · USCG Northeast District (CGD-NE) · Activity 2823963
14 November 2006 MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2833478
1 April 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2036223
7 November 2003 Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1943592

Deficiency record · 56

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 December 2025 Resolved
All seals and gaskets must be properly maintained to prevent leaks of flammable or combustible liquid into the machinery space. Secure the diesel leak at the 2 elbow connections in the fuel transfer piping located in the engine room, port side.
Action required: 705 - Other - as specified
Due 27 February 2026
Resolved 29 January 2026
Resolution: Piping was taken apart and put back together, no leaks identified. Cleared def
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 December 2025 Resolved
The owner, operator, master of a towing vessel must ensure the strength of each component used to secure the towing vessel to the tow. Remove the paint and allow for further inspection of the fwd weld at the base of the bit inside the store room.
Action required: 705 - Other - as specified
Due 27 February 2026
Resolved 29 January 2026
Resolution: Paint was removed, weld is intact. Cleared def.
09 - Working and Living Conditions › 092 - Working Conditions › Other (working space ILO)
Issued 19 December 2025 Resolved
The vessel must be kept in a sanitary condition. Repair the leak in the sewage discharge piping in the store room.
Action required: 705 - Other - as specified
Due 27 February 2026
Resolved 29 January 2026
Resolution: Discharge piping was missing a hose clamp, clamp was added and there is no more leak. Cleared def
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 19 December 2025 Resolved
A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel are not compromised. Crop and renew/repair to the satisfaction of the attending CG Marine Inspector, the weathertight doors where holed through: Stbd ER door edges and port wheelhouse bottom.
Action required: 705 - Other - as specified
Due 27 February 2026
Resolved 29 January 2026
Resolution: Repairs to the wasted edges were completed and new gaskets provided for all weathertight doors. cleared def
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 19 December 2025 Resolved
Decks and bulkheads designed to be watertight or weathertight must be maintained in that condition. Repair the identified leak in the upper wheelhouse overhead.
Action required: 705 - Other - as specified
Due 27 February 2026
Resolved 13 July 2026
Resolution: completed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 December 2025 Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. Renew the exposed cable located at the port battery box in the engine room.
Action required: 705 - Other - as specified
Due 27 February 2026
Resolved 13 July 2026
Resolution: completed
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 5 June 2025 Resolved
Provide copy of valid Certificate of Documentation (COD), COD expired 5/31/2025. Vessel may not operate without a COD.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 August 2025
Resolution: completed
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 5 June 2025 Resolved
Vessel required 12 flares (6 day and 6 night) for Coastwise route. Vessel had expired flares on board, and more expire in July 2025. Provide 12 flares. Vessel restricted to lakes, bays and sounds route within 3 miles of shore.
Action required: 705 - Other - as specified
Resolved 13 August 2025
Resolution: done
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 5 June 2025 Resolved
Provide copy of valid EPIRB registration for both EPIRB's.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2025
Resolved 13 August 2025
Resolution: completed
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 5 June 2025 Resolved
Provide working navigation lights. Starboard light fixture not attached, and lights not able to be energized. Vessel restricted to daytime operations, and no operations in reduced visibility conditions.
Action required: 705 - Other - as specified
Resolved 13 August 2025
Resolution: completed
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 June 2025 Resolved
Provide gauge for fire pump, or way to test pressure. (50 PSI, with flow rate of 80GPM)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2025
Resolved 13 August 2025
Resolution: completed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 June 2025 Resolved
Label fuel shut off valves.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 June 2025
Resolved 13 August 2025
Resolution: completed
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 5 June 2025 Resolved
Prove proper operation of forward bilge suction. When tested, level either did not move or moved too slowly to verify.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2025
Resolved 13 August 2025
Resolution: completed
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 15 August 2024 Resolved
re-label vessel name due to fading
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2024
Resolved 18 September 2024
Resolution: re-labeled
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 15 August 2024 Resolved
replace lifeline on liferings due to dry rot
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2024
Resolved 18 September 2024
Resolution: replaced
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 15 August 2024 Resolved
check all nav. lights and replace bulbs as needed
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2024
Resolved 18 September 2024
Resolution: replaced bad bulbs
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 15 August 2024 Resolved
label 03 lifejackets with vessel name
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2024
Resolved 18 September 2024
Resolution: labeled
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 15 August 2024 Resolved
replace or add waterlights to all 6 lifejackets
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2024
Resolved 18 September 2024
Resolution: waterlights added
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 25 March 2024 Resolved
Replace gaskets around WT doors (3 main, 3 upper, and 1 hatch). 46 CFR 140.610
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 28 March 2024
Resolution: completed, installed new
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 25 March 2024 Resolved
Provide lighting in Capt's quarters (main light is out).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 28 March 2024
Resolution: completed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 31 July 2023 Resolved
The master must ensure that all hatches, doors, and other openings designed to be watertight or weather-tight function properly. Test all water/weather tight doors, hatches, scuttles, and windows in the presence of the Coast Guard Marine Inspector (CGMI). 2 cracks found in fwd compartment hatch IWO gasket and 1 hole in stbd ER WTD IWO gasket.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: tested deck WT doors with chalk, sat. POC has had difficulty locating gasket material. Clearing this def, and entering a new one for doors and hatches.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 July 2023 Resolved
Electrical components that pose an electrical hazard must be in an enclosure. 01 deck berthing – extension cord used for wiring and splice not in an enclosure. Rewire using approved copper stranded boat cable.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: Yellow cord that looked like an extension cord was actually covered boat cable. It was removed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 July 2023 Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. Remove all dead end wiring under pilot house.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: cleared
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 July 2023 Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. Remove extension cord wiring under pilot house and rewire with approved copper stranded boat cable.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: Extension cord wiring was actually stranded boat cable. completed
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 July 2023 Resolved
Electrical components that pose an electrical hazard must be in an enclosure. In pilot house, place exposed wiring and wires spliced with wire nuts in an enclosure.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: exposed wiring is from upper wheelhouse system that is not plugged in/needed. Cords are not live, and ready for hook up when desired. completed
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 July 2023 Resolved
Electrical components that pose an electrical hazard must be in an enclosure. Install cover on fuse panel in pilot house.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: cleared
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 July 2023 Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Remove pilot house console access panel to allow for inspection.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: removed/inspected
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 31 July 2023 Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Fiddley engine – leaking oil from exhaust. Remove exhaust elbow from engine and lagging, determine cause of oil leak, repair and test run to the satisfaction of the attending Coast Guard Marine Inspector (CGMI).
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: completed
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 31 July 2023 Resolved
A crew work space must be of adequate construction to provide for the safe operation of the vessel and the protection and accommodation of the crew. Crop and renew 2nd step on fwd staircase.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 31 January 2024
Resolution: completed
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 31 July 2023 Resolved
A crew work space must be of adequate construction to provide for the safe operation of the vessel and the protection and accommodation of the crew. Crop and renew marked area on 01 deck fwd staircase.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 31 January 2024
Resolution: completed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 31 July 2023 Resolved
A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel are not compromised. Make watertight port and starboard pilot house windows.
Action required: 703 - Prior to bunkering operations
Due 29 February 2024
Resolved 25 March 2024
Resolution: completed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 31 July 2023 Resolved
A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel are not compromised. Crop and renew marked drain covers on 01 deck fwd of wheelhouse.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 31 January 2024
Resolution: completed
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 31 July 2023 Resolved
A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel are not compromised. Crop and Renew decking beneath 01 deck port side pilot house access stairs.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 21 February 2024
Resolution: completed
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 31 July 2023 Resolved
A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel are not compromised. Crop and renew port side 01 deck marked areas IWO berthing where holed through.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 31 January 2024
Resolution: completed
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 July 2023 Resolved
Electrical equipment and electrical cables must be suitably protected from wet and corrosive environments. Provide repair proposal for aft 01 deck control station to make watertight.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: completed
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 31 July 2023 Resolved
A crew work space must be of adequate construction to provide for the safe operation of the vessel and the protection and accommodation of the crew. Crop and renew aft 01 deck marked railing, railing stanchions, and marked decking to good metal.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 21 February 2024
Resolution: completed
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 31 July 2023 Resolved
A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel are not compromised. Stbd side AC line on 01 deck, make watertight.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: completed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 31 July 2023 Resolved
A crew work space must be of adequate construction to provide for the safe operation of the vessel and the protection and accommodation of the crew. Crop and renew marked railings on stbd side 01 deck to good metal.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: completed
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 31 July 2023 Resolved
A crew work space must be of adequate construction to provide for the safe operation of the vessel and the protection and accommodation of the crew. Secure bottom aft step of stbd side pilot house.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: completed
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 July 2023 Resolved
Electrical components that pose an electrical hazard must be in an enclosure. Place exposed wiring upper pilot house in enclosure.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: exposed wiring is from system that is not hooked up, all wires are dead, ready for hook up when ready. completed
02 - Structural Conditions › N/A - No Subsystem › Wheelhouse -door -window
Issued 31 July 2023 Resolved
A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel are not compromised. Make penetrations in aft of pilot house watertight.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: completed
09 - Working and Living Conditions › 092 - Working Conditions › Winches & capstans
Issued 31 July 2023 Resolved
The owner, managing operator, master or officer in charge of a navigational watch of a towing vessel must ensure the strength of each component used for securing the towing vessel to the tow and for making up the tow is adequate for its intended service. Crop and renew fwd bow bit.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 21 February 2024
Resolution: cleaned, middle section partially replaced, complete and adequate for intended service.
09 - Working and Living Conditions › 092 - Working Conditions › Holds and tanks safety
Issued 31 July 2023 Resolved
A crew work space must be of adequate construction to provide for the safe operation of the vessel and the protection and accommodation of the crew. Crop and renew side shelf for msd tank in fwd compartment.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: completed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 31 July 2023 Resolved
A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel are not compromised. Renew 3 cracked portholes located in fiddley or cover with appropriate weathertight cover.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: completed
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 31 July 2023 Resolved
A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel are not compromised. Crop and renew to good metal marked port side superstructure IWO ER WTD.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 31 January 2024
Resolution: completed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Bulwarks and freeing ports
Issued 31 July 2023 Resolved
A crew work space must be of adequate construction to provide for the safe operation of the vessel and the protection and accommodation of the crew. Crop and renew wasted bulwark aft of port and stbd aft H bit. .
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: completed, smoothed
09 - Working and Living Conditions › 092 - Working Conditions › Winches & capstans
Issued 31 July 2023 Resolved
A crew work space must be of adequate construction to provide for the safe operation of the vessel and the protection and accommodation of the crew. Crop and renew port and stbd marked chocks.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 16 February 2024
Resolution: completed
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 27 July 2023 Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards.Remove extension cord used for wiring heater located in forward compartment space.
Action required: 705 - Other - as specified
Due 29 February 2024
Resolved 25 March 2024
Resolution: completed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 8 September 2022 Resolved
Excessive water coming in vessel from P/S shaft packings. Must make repairs prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 September 2022
Resolution: Cleared
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 8 September 2022 Resolved
Provide proof of servicing on semi-portables in E/R.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 September 2022
Resolved 12 September 2022
Resolution: completed
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 August 2021 Resolved
Semi-Portable (160B) fire-extinguishing system must be inspected or tested at least once every 12 months. Last inspection was 2019. Semi-portable fire extinguisher needs hydrostatic pressure test required by NFPA 10.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 September 2021
Resolved 15 September 2021
Resolution: Completed.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 18 August 2021 Resolved
Fire detection system failed to chirp and go onto the secondary power source according to its design when primary power was shutoff to vessel.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 September 2021
Resolved 15 September 2021
Resolution: Completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 August 2021 Resolved
Discharge valve to bilge system seized. Not operational.
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Due 2 September 2021
Resolved 19 August 2021
Resolution: Valve working properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 August 2021 Resolved
Starboard Aft Fuel Return valve has handle missing. Will not be able to open and close properly.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 2 September 2021
Resolved 19 August 2021
Resolution: Valve replaced.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 18 August 2021 Resolved
Starboard Firemain Station Shutoff valve is rotted. Valve difficult to open and close. Needs replaced.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 2 September 2021
Resolved 19 August 2021
Resolution: Valve replaced.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 18 August 2021 Resolved
COI not framed under glass or transparent material posted in a conspicuous location.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 2 September 2021
Resolved 19 August 2021
Resolution: COI Posted under glass in wheelhouse.

Casualty record · 2

5 December 2011Routine · role: Involved in a Marine Casualty · activity 4206494
9 October 2025Routine · role: Involved in a Marine Casualty · activity 8251424
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.