Documentation record
Registered dimensions (L × B × D)559.8 ft × 74.0 ft × 40.1 ft
Registered tonnagegross 11,147 / net 11,147
ITC dimensions (L × B × D)559.8 ft × 74.0 ft × 40.1 ft
ITC tonnagegross 13,462 / net 8,791
BuilderVT HALTER MARINE INC · PASCAGOULA, MS, UNITED STATES · built 2009
Hull materialSteel
PropulsionNone
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portSAN FRANCISCO, CA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 17 June 2026 · expires 31 July 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it13462 - Convention (Subpart B), Gross Ton
11147 - Regulatory (Subpart C or D), Gross Ton
8791 - Convention (Subpart B), Net Ton
27023 - Dead Weight, Ton
11147 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 33
8 January 2026
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8292464
12 June 2025
Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8158729
4 October 2024
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8014349
6 March 2024
COI Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7875060
12 September 2023
Bulk Liquid Transfer Monitor
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7790480
7 March 2023
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7650228
8 April 2022
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7416133
14 October 2021
Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7327837
2 June 2021
Periodic Inspection · MTSA Verification
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7214099
18 June 2020
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6980114
10 December 2018
COI Inspection · Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6606613
21 May 2018
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6422761
27 April 2017
DAPI Audit · Periodic Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6129117
22 February 2017
Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6134238
26 September 2016
Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6011343
27 May 2016
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5900592
22 October 2015
Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5748549
8 August 2015
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5219113
7 May 2015
MTSA Verification · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5118343
22 November 2014
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5028396
14 September 2014
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4982757
22 January 2014
Drydock Exam · MTSA Verification · COI Inspection · Internal Structural Exam · MARPOL Annex I Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4789899
23 July 2013
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4662267
19 October 2012
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4467628
17 August 2012
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4414051
23 May 2012
MTSA Verification · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4320536
9 May 2012
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4312545
7 March 2012
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4258818
4 December 2011
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4201741
17 November 2011
Internal Structural Exam
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4190664
22 March 2010
Annual Inspection · MTSA Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3700351
16 March 2009
MARPOL Annex II Examination · Plan Review (Other than "T") · Construction Oversight · MTSA/ISPS Verification · Deadweight Survey · MARPOL Annex I Examination · Ballast Water Examination · Initial Certification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3434426
18 December 2007
Plan Review (Other than "T")
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3117660
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 12 June 2025
Resolved
All installations must be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Identified fuel leaks coming from the fuel rail on the #1 and #2 cylinders.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 July 2025
Resolution: Received ABS Class report attesting to repairs made to generator. Attending surveyor tested at full load with no leaks observed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 12 June 2025
Resolved
All installations must be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Fuel line on hotel generator was dry rotted.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 July 2025
Resolution: Received ABS Class report attestsing to replacement of fuel line. Attending surveyor tested at full load with no leaks observed.
Engineering › Freshwater System (jacketwater cooling) › Hose
Issued 21 May 2018
Resolved
Non-metallic expansion joints showed significant signs of fatigue and deterioration.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 May 2018
Resolved 21 May 2018
Resolution: All non-metallic expansion joints replaced prior to CG team departing.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 5 May 2017
Resolved
Amend barge fire control plans to remove foam system storage tanks, and submit new plan to OCMI for review.
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 May 2017
Resolved 17 May 2017
Resolution: See Narrative.
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 27 April 2017
Resolved
Provide replacement/ equivilant for fixed foam system on deck.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 May 2017
Resolution: Equivalency properly installed/operational, see narrative.
Deck/Cargo › Cargo Heating › General
Issued 27 April 2017
Resolved
Repair motor controller for thermal fluid heater, restricted from thermal fluid heater operation until motor repaired.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 5 May 2017
Resolution: See Narrative.
Communications › Audible Communications › Horn/Whistle
Issued 27 April 2017
Resolved
Secure cargo high level alarm [loose connection] located on port machinery space.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 April 2017
Resolved 5 May 2017
Resolution: See Narrative.
Engineering › Pressure Vessel › Maximum Allowable Working Pressure
Issued 27 April 2017
Resolved
Provide satisfactory testing of all pressure vessels, internals, and relief valves.
Action required: 705 - Other - as specified
Due 12 May 2017
Resolved 28 April 2017
Resolution: See Narrative.
Construction/Loadline › Structures › End Bulkhead
Issued 26 September 2016
Resolved
Identify and provide authorized repairs for source of product weepage from cargo tank into #3P Ballast tank. Pin hole leak located in #3P Ballast tank, near aft bulkhead, on deep well pump reservoir, overhead weld seam.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 September 2016
Resolution: Identified pin hole leak in cargo tank #3. Back gouged, and rewelded full penetration seam. Mag particle passed NDT, and air pressure test of tank at 1 PSI passed. ABS witness, submitted tech report.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 7 May 2015
Resolved
Vessel shall provide line diagrams of vessel's transfer piping and vapor collection system piping to include in the transfer procedures IAW 33CFR155.750.
Condition: Invalid
Due 7 June 2015
Resolved 8 May 2015
Resolution: Port Engineer provided copy of line diagram of vessel''s transfer piping arrangements.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 7 May 2015
Resolved
Vessel shall install a synchronizing lamp for paralleling generators IAW 46 CFR 111.30-25(d)(3).
Condition: Invalid
Due 11 November 2015
Resolved 22 October 2015
Resolution: Company provided syncronizing lamps.
Electrical › Electric Supply System (service) › Reverse Current Protection
Issued 7 May 2015
Resolved
Vessel shall prove operation of the reverse power relay for paralleling generators IAW 46 CFR 111.12-11(f).
Condition: Invalid
Due 7 June 2015
Resolved 8 May 2015
Resolution: Chief Engineer provided evidence that satisfactory test of reverse power relay was conducted.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Relief Valve
Issued 7 May 2015
Resolved
Vessel removed relief valves on discharge side of cargo pumps. Provide relief valves or proof that cargo pumps are not capable of providing pressure above the maximum allowable working pressure of the system IAW 46 CFR 56.07-10(b).
Condition: Invalid
Due 7 June 2015
Resolved 8 May 2015
Resolution: Vessel provided approval letter from Marine Safety Center approving the removal of the cargo pump relief valves. Letter E1-1203488.