Records from 2008 to 2026. Most recent: inspection, 26 May 2026.
Documentation record
Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.5 ft
Registered tonnagegross 735 / net 735
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderC&C MARINE · BELLE CHASSE, LA, UNITED STATES · built 2008
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 18 November 2025 · expires 31 December 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it735 - Simplified, Net Ton
735 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 24
26 May 2026
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8380834
4 January 2023
Internal Structural Exam · MTSA Verification · Examination of Repairs · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7616211
27 July 2021
Damage Survey · MTSA Verification · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7269973
30 April 2019
Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6673470
12 December 2018
Annual Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 6598927
5 January 2018
Drydock Exam · Internal Structural Exam · Cargo Tank Internal · Administrative Inspection · COI Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6332971
10 May 2017
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6143134
11 March 2016
MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5830536
13 August 2015
Examination of Repairs · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5211742
6 July 2015
Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5183956
21 January 2015
Deficiency Check · Examination of Repairs · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5053801
30 December 2014
Type not recorded
No type recorded · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 5046048
30 December 2014
Damage Survey · MTSA Verification
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 5046049
28 January 2014
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4786972
24 February 2012
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4250548
21 February 2011
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3956173
18 February 2011
Periodic Inspection · MTSA Verification
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3946490
4 January 2011
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3920689
17 December 2009
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3652030
16 December 2009
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3651010
13 May 2009
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3473975
11 May 2009
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3472209
7 February 2009
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3414762
6 February 2008
Administrative Inspection · Hull Examination · MTSA Verification · Deadweight Survey · Initial Certification · Cargo Tank Internal · Construction Oversight · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3142665
02 - Structural Conditions › N/A - No Subsystem › Cargo tank vent system
Issued 4 January 2023
Resolved
For a Coast Guard-approved vessel VCS that began operating on or after July 23, 1990, the tank vessel owner operator must submit plans, calculations, and specifications to the MSC for review and approval before modifying the system. While attending vessel for COI the Pressure-Vacuum valve installed did not coincide with the specifications listed on the vessels VCS Planned Review Information Sheet (PRIS). The installed P/V valve had settings of 3.0psi on the pressure and 0.5psi on the vacuum sides. The approved VCS PRIS listed setting of 3.0psi on the pressure and 3.0psi on the vacuum sides. The Owner operator needs to align P/V valve to the satisfaction of Marine Inspector.
46CFR39.1013(b) 701C
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 February 2023
Resolved 2 February 2023
Resolution: Vessel representitive provided evidence of repairs.
Construction/Loadline › Hull › Side Shell
Issued 6 July 2015
Resolved
Deck Knuck inset (5' x 2'). Repair prior to loading.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 3 August 2015
Resolved 13 August 2015
Resolution: Inspected and tested required repairs in the presence of marine inspector. 835 cleared.
Construction/Loadline › Hull › Hull Plating
Issued 30 December 2014
Resolved
Repair in kind the inset and fracture IWO the STBD bow corner wrap which was damaged by an allision.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 January 2015
Resolution: Cleared by [name withheld] of Sector New Orleans. Witnessed satisfactory air test of repairs at 1.5 PSI. Inspected welds repaired in kind.
Communications › Alarms/Indicators › General Alarm
Issued 18 February 2011
Resolved
J/W temperature gauge was not working on the main engine (cargo pump).
Action required: 705 - Other - as specified
Due 25 February 2011
Resolved 22 February 2011
Resolution: J/W gauge replace and operational.
Deck/Cargo › Cargo Heating › General
Issued 18 February 2011
Resolved
The relief valve for the cargo heating (steam) header needs to be replaced, or bench tested to prove proper operation.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 25 February 2011
Resolved 22 February 2011
Resolution: Relief Valve was replaced in kind.
Engineering › Pressure Vessel › Support
Issued 18 February 2011
Resolved
The hydraulic accumulator for the starting system on the main engine needs to have its missing support bracket/clamp replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 February 2011
Resolved 22 February 2011
Resolution: Missing braket was replaced.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 11 May 2009
Resolved
Vessel failed to conduct annual inspection.
Action required: 705 - Other - as specified
Due 11 May 2009
Resolved 11 May 2009
Resolution: Vessel completed annual exam, Issued NOV