Inspection history · 40
4 March 2026
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8319790
29 October 2025
Periodic Inspection · MTSA Verification · Deficiency Check · Vessel Attendance
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8256506
4 June 2025
Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8166401
12 December 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8047159
13 March 2024
Bulk Liquid Transfer Monitor
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7878228
15 November 2023
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7821813
28 September 2022
COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7567025
24 June 2022
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7485690
16 May 2022
Deficiency Check · Administrative Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7452145
26 October 2021
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7331839
14 October 2020
Deadweight Survey · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7066827
23 July 2019
MARPOL Annex I Examination · Periodic Inspection · MARPOL Annex VI Survey · MARPOL Annex II Examination · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6759852
5 April 2019
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6656777
27 February 2019
Bulk Liquid Transfer Monitor
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6633636
12 July 2018
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6476328
28 September 2017
COI Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6276315
31 July 2017
Internal Structural Exam · Cargo Tank Internal · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6226594
30 June 2016
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5924361
14 July 2015
Deficiency Check · MTSA Verification · Internal Structural Exam · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5183883
28 July 2014
Annual Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4939555
3 June 2014
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4878805
12 November 2013
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4751208
14 August 2013
Annual Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4684162
17 December 2012
Type not recorded
No type recorded · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 4503397
18 September 2012
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4444327
18 September 2012
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4444419
18 July 2012
MTSA Verification · Internal Structural Exam · COI Inspection · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4384610
16 May 2012
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4313213
2 December 2011
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4200484
29 November 2011
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4197999
8 October 2010
Internal Structural Exam · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3866013
27 September 2010
MTSA Verification · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3857858
30 March 2009
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3442749
9 March 2009
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3444761
5 January 2009
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3388792
6 November 2008
Deficiency Check · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3360377
27 October 2008
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3352002
29 September 2008
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3335342
12 April 2008
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3183737
23 October 2007
Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3085587
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 29 October 2025
Resolved
After loading and prior to departure and at all other times necessary to assure the safety of the vessel, the Master or Person in Charge must determine that the vessel complies with all applicable stability requirements in the vessel's trim and stability book, stability letter, Certificate of Inspection, and Load Line Certificate, as the case may be. The vessel may not depart until it is in compliance with these requirements.
The CargoMax system used by the vessel has not been maintained in accordance with ABS approved loading instrument instruction manual. Periodic in service verifications have not been conducted to ensure continued accuracy of the loading instrument used for stability safety of the vessel.
46 CFR 35.20-7(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 November 2025
Resolved 4 March 2026
Resolution: Crew had received training on the CargoMax system and showed familiarity with periodic verification testing procedures.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 29 October 2025
Resolved
The high-level alarm and tank overfill alarm must: activate an alarm in the event of loss of power to the alarm system and activate an alarm during the failure of electrical circuitry to the tank level sensor.
Power fault alarm and independent battery power supply to the alarm system are inoperable, batteries are not charging and for system power failure is inoperable.
46 CFR 39.2009(a)(1)
46 CFR 39.2007
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 November 2025
Resolved 1 December 2025
Resolution: New batteries and battery charger installed for emergency power. Tested power loss and witnessed audible and visual power fault alarm.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 October 2025
Resolved
Each cable installation [in hazardous locations] must meet: (1) Sections 6, of IEEE 45.8-2016 (incorporated by reference; see § 110.10-1 of this subchapter); or (2) Cables manufactured to IEC 60092-353:2016 must be installed in accordance with IEC 60092-352:2005 (both incorporated by reference; see § 110.10-1 of this subchapter), including clause 8.
Cable improperly installed on starboard floodlight within hazardous location above starboard machinery space.
46 CFR 111.105-17(a)
46 CFR 111.60-5(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 November 2025
Resolved 25 November 2025
Resolution: Starboard flood light wiring corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 29 October 2025
Resolved
At least one-half the total number of lifebuoys on the vessel must each be fitted with a self-igniting light approved under approval series 161.010.
Installed batteries do not meet manufacturer lithium battery requirements.
46 CFR 199.70(a)(3)(ii)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 November 2025
Resolved 25 November 2025
Resolution: Lithium batteries ordered.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 December 2024
Resolved
Each vessel must carry lifebuoys approved under approval series 160.150. The vessel's lifebuoys were unserviceable. Replace lifebuoys to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 December 2024
Resolved 3 February 2025
Resolution: Received objective evidence that the ring buoy was replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 December 2024
Resolved
Ground indicators must be at the vessel's ship's service generator distribution switchboard for the normal power, normal lighting, and emergency lighting systems; The ground detection light was out on the distribution panel in the port engine room. Replace light bulb to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 December 2024
Resolved 3 February 2025
Resolution: Received objective evidence that the Ground Detector lights have been replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 December 2024
Resolved
Each nameplate for a circuit breaker must show the electrical load served and the setting of the circuit breaker. One circuit breaker in the port engine is not marked showing the load served. Properly label circuit breaker to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 December 2024
Resolved 3 February 2025
Resolution: Received objective evidence that the Electrical Distribution panel are properly labeled.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 14 October 2020
Resolved
Repairs, or alterations of extensive amounts of cables, or other electrical equipment must comply with regulations in 46 CFR 110.25, plan review. Submit plans required by CFR 110.25 to review extensive electrical alterations prior to operating associated equipment.
Action required: 705 - Other - as specified
Resolved 16 May 2022
Resolution: System was taken out of service and disconnected from vessel. Operator will contact OCMI if they decide to put system back into use.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 14 October 2020
Resolved
Portable extinguishers and their stations must be numbered IAW 46CFR35.40-25. Multiple portable fire extinguishers were not in their designated locations and some designated locations did not have extinguishers in them. Verify location of all extinguishers IAW fire plan.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 October 2020
Resolved 1 December 2020
Resolution: All missing fire extinguishers were put back in proper location in accordance with the Fire plan.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 14 October 2020
Resolved
Twist-on type of connectors may not be used for making joints in cables, facilitating a conductor splice, or extending the length of a circuit. Battery charger in generator room has electrical connections that do not meet standard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 October 2020
Resolved 1 December 2020
Resolution: Battery charger connections were replaces with proper connectors.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 October 2020
Resolved
Electrical installations on vessels must ensure protection of crew and the vessel from electrical hazards. The 120 volt panel has an opening on the bottom.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 October 2020
Resolved 1 December 2020
Resolution: The opening on the bottom of the panel was covered with an appropriate blank.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 October 2020
Resolved
Electrical installations on vessels must ensure protection of crew and the vessel from electrical hazards. There is a transformer in generator room with an opening on the case.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 October 2020
Resolved 1 December 2020
Resolution: The transformer was fitted with appropriate fitting.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 October 2020
Resolved
Machinery driven forced draft and induced draft fans must be fitted with remote controls from a readily accessible and marked. Ventilation emergency stop not marked.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 October 2020
Resolved 1 December 2020
Resolution: Emergency stop switch was properly marked.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 October 2020
Resolved
Sufficient illumination must be provided by the emergency lighting source under emergency conditions to effect damage control procedures and to provide for safe egress from each space. All emergency lights inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 October 2020
Resolved 12 February 2021
Resolution: All emergency lights tested sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 October 2020
Resolved
All pressure vessels other than unfired steam boilers shall be protected by pressure-relieving devices that will prevent the pressure from rising more than 10 percent above the maximum allowable working pressure, except when the excess pressure is caused by exposure to fire or other unexpected source of heat.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 October 2020
Resolved 1 December 2020
Resolution: A new pressure relief valve was installed and was appropriately marked.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 July 2019
Resolved
Grab lines on lifebouys were deteriorated and in need of replacement.
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Due 29 August 2019
Resolved 24 August 2019
Resolution: Grab lines on the life buoys were replaced.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 5 April 2019
Resolved
No extensive alterations involving the safety of a tank vessel in regard to hull shall be made without the approval of the [name withheld] a repair proposal plan, gas free the affected space, and make repairs to the damage found in 1P void space to the satisfaction of the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 April 2019
Resolution: Completed satisfactory air test of #2 Port Void.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 14 July 2015
Resolved
A pressure gauge shall be installed for each pump discharge, and it shall be located at a point visible with respect to the pump controls. Both cargo pump gauges cannot be seen from the operation stations.
Action required: 705 - Other - as specified
Due 31 July 2017
Resolved 22 July 2015
Resolution: Vessel installed port viewing holes to each operating station so that they have a clear view of the guages on the pumps.
Electrical › Electric Generation Source (service) › Ground Detection
Issued 28 July 2014
Resolved
Each ungrounded system must be provided with a ground detection system located at the respective switchboard which provides continuous indication of circuit status to ground. Ground detection bulb is out, vessel must repair bulb ensuring there are no grounds on board. (46CFR111.05-25)
Condition: Improper/Lack of Maintenance
Due 12 August 2014
Resolved 29 July 2014
Resolution: Vessel repaired fuse associated with ground detection panel. All ground detection indicating bulbs operating as designed.
Electrical › Electric Supply System (service) › Cable
Issued 14 August 2013
Resolved
Electrical extension cord was found in the hazardous zone are running into the cargo pump room engine house through stuffing tube.
Due 28 August 2013
Resolved 21 August 2013
Resolution: Vessel removed electrical extension cord was found in the hazardous zone are running into the cargo pump room engine house through stuffing tube.
Deck/Cargo › Vapor Control Systems › Liquid Overfill Protection
Issued 14 August 2013
Resolved
Electrical cable for high/overfill alarm wiring is exposed within the hazardous area.
Due 28 August 2013
Resolved 21 August 2013
Resolution: Vessel properly secured wiring into the deck high/overfill alarm connection.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 14 August 2013
Resolved
Cargo pump engine # 1 bellow is cracked. Cargo pump engine # 1and 2 not properly secured.
Due 28 August 2013
Resolved 9 September 2013
Resolution: Vessel fabricated steel enclosures with gaskets around the drive shafts of #1 and #2 cargo pump engines.
Construction/Loadline › Hull › Stiffener
Issued 8 October 2010
Resolved
During ISE Marine Inspector discovered crack welds in the 4 Port. Vessel was instructed to V/W #5 vertical side shell stiffener (VSS) W/M IWO # 1 SSL
Due 13 November 2010
Resolved 3 November 2010
Resolution: Visually inspected welds and found satisfactory.
Construction/Loadline › Hull › Stiffener
Issued 8 October 2010
Resolved
During ISE Marine Inspector discovered crack welds in the 4 Port. Vessel was instructed to V/W #6 vertical side shell stiffener (VSS) W/M IWO # 1 SSL + diagonal stiffener.
Due 13 November 2010
Resolved 3 November 2010
Resolution: Visually inspected welds and found satisfactory.
Construction/Loadline › Hull › Stiffener
Issued 8 October 2010
Resolved
During ISE Marine Inspector discovered crack welds in 4 Port. Vessel was instrcuted to V/W #8 VSS W/M IWO #1 SSL + diagonal.
Due 13 November 2010
Resolved 3 November 2010
Resolution: Visually inspected welds and found satisfactory.
Construction/Loadline › Hull › Stiffener
Issued 8 October 2010
Resolved
4 Port, V/W #9 VSS W/M IWO #6 SSL
Due 13 November 2010
Resolved 3 November 2010
Resolution: Visually inspected welds and found satisfactory.
Construction/Loadline › Hull › Stiffener
Issued 8 October 2010
Resolved
During ISE Marine Inspector discovered crack welds in 3 Port,. Vessel was instrcuted to V/W #7 VSS W/M IWO #6 SSL
Due 13 November 2010
Resolved 3 November 2010
Resolution: Visually inspected welds and found satisfactory.
Construction/Loadline › Hull › Stiffener
Issued 8 October 2010
Resolved
During ISE Marine Inspector discovered crack welds in 2 Port. Vessel was instrcuted to V/W between bay 7/6 TWF at #5 SSl W/M.
Due 13 November 2010
Resolved 3 November 2010
Resolution: Visually inspected welds and found satisfactory.
Construction/Loadline › Hull › Stiffener
Issued 8 October 2010
Resolved
During ISE Marine Inspector discovered crack welds in 5 Port. Vessel was instructed to V/W #1 VSS IWO #1 SSL W/M
Due 13 November 2010
Resolved 3 November 2010
Resolution: Visually inspected welds and found satisfactory.
Construction/Loadline › Hull › Stiffener
Issued 8 October 2010
Resolved
During ISE Marine Inspector discovered crack welds in 4 Stbd. Vessel instructed to V/W #7 VSS IWO #1 SSL W/M
Due 13 November 2010
Resolved 3 November 2010
Resolution: Visually inspected welds and found satisfactory.
Construction/Loadline › Hull › Stiffener
Issued 8 October 2010
Resolved
During ISE Marine Inspector discovered crack welds in 4 Stdb. Vessel was instructed to V/W #5 IWO #2 SSL W/M
Due 13 November 2010
Resolved 3 November 2010
Resolution: Visually inspected welds and found satisfactory.
Construction/Loadline › Hull › Stiffener
Issued 8 October 2010
Resolved
During ISE Marine Inspector discovered crack welds in the 2 Stbd. Vessel was instructed to V/W #1 VSS IWO #1 SSL W/M
Due 13 November 2010
Resolved 3 November 2010
Resolution: Visually inspected welds and found satisfactory.
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 27 October 2008
Resolved
There was no paint locker aboard the vessel and numerous paint cans in different locations throughout the vessel. Issued a requirement to provide a flammable stores locker.
Condition: Unknown
Due 27 November 2008
Resolved 5 December 2008
Resolution: A flammable stores locker was added.