Records from 2007 to 2026. Most recent: inspection, 17 March 2026.
Documentation record
Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.5 ft
Registered tonnagegross 735 / net 735
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSOUTHWEST SHIPYARD · GALVESTON, TX, UNITED STATES · built 2007
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry, non-fishing vessel
DocumentationValid · issued 16 September 2025 · expires 30 September 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it735 - Simplified, Gross Ton
735 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 22
17 March 2026
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8325016
17 December 2025
Damage Survey
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 8282116
27 September 2025
Damage Survey
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 8242463
30 January 2023
Internal Structural Exam · COI Inspection · Deficiency Check · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7619995
12 December 2017
Administrative Inspection · Examination of Repairs · Drydock Exam · Cargo Tank Internal · COI Inspection · Internal Structural Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6323185
26 October 2016
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6030166
7 October 2015
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5736547
19 September 2014
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4985545
4 March 2014
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4821948
11 December 2013
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4766208
8 October 2013
Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4732057
7 October 2013
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4731575
4 December 2012
Internal Structural Exam · COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4493819
3 April 2012
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4277408
17 March 2012
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4265815
17 March 2012
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4266874
24 October 2011
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 4174411
3 December 2010
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3905066
26 March 2010
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3703387
9 March 2009
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3428640
21 October 2008
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3348815
11 November 2007
Hull Examination · Construction Oversight · Cargo Tank Internal · Internal Structural Exam · Spot Check
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3096554
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 30 January 2023
Resolved
Bolting: Bolts and studs must extend completely through the nuts. Bolts do not extend through the nuts of the steam pipe flange blank located in the #3 Starboard wing void. Install proper sized bolts as required.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2023
Resolved 2 February 2023
Resolution: Replaced bolts with ones of appropriate size
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 30 January 2023
Resolved
Boilers, main and auxiliary machinery, and piping systems shall conform to the requirements of subchapter F (Marine Engineering) of this chapter, except as otherwise provided for in this subchapter. Exhaust pipe on cargo pump prime mover wasted in half. Replace with new.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2023
Resolved 2 February 2023
Resolution: Exhaust pipe replaced with new
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 30 January 2023
Resolved
Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams, and testing of tanks shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society. The following deficiencies were
identified:
* pick-up located in #2 port wing void at #5 vertical frame and #3 stringer
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2023
Resolved 2 February 2023
Resolution: Weld repaired
Construction/Loadline › Hull › Side Shell
Issued 17 March 2012
Resolved
Barge sustained minor damage to the #3 port wing void side shell in the way of a 7' by 2' inset and a 4" by 1/4" fracture. Barge was issued an 835 to make permanent repairs to the satisfaction of U.S. Coast Guard inspector prior to loading cargo.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 April 2012
Resolution: Verified permanent repair of # 3 port wing void with one 6'' 6" x 14'' x 3/8" plating. See attached repair summary.