MAURY USCG vessel records
← All vessels

BROWNSVILLE

Built
2008
Last inspected
19 March 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.

Inspection record

Last inspected 19 March 2026
…with no type recorded21
Operational controls None recorded without a removal date
Years with a record 19 calendar years (2008–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9385738
WDE5095
921406
Flag
UNITED STATES
Maury page id
psix-921406

Documentation record

Registered dimensions (L × B × D)144.0 ft × 46.0 ft × 27.0 ft
Registered tonnagegross 919 / net 625
ITC dimensions (L × B × D)144.0 ft × 46.0 ft × 27.0 ft
ITC tonnagegross 1,348 / net 404
BuilderEASTERN SHIPBUILDING GROUP · PANAMA CITY, FL, UNITED STATES · built 2008
Hull materialSteel
PropulsionDiesel
Hull shapeShip
Hull configurationMonohull
Hailing portWILMINGTON, DE
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 18 March 2026 · expires 30 April 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it919 - Regulatory (Subpart C or D), Gross Ton
1348 - Convention (Subpart B), Gross Ton
625 - Regulatory (Subpart C or D), Net Ton
404 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 81 inspections, each with its date, unit and type; 34 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 1 other vessel inspected with it; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

PETROCHEM TRADER Tank Barge · MISLE 943849 · 1 March 2025 · activity 8095675PETROCHEM TRADER Tank Barge · MISLE 943849 · 23 February 2021 · activity 7144893PETROCHEM TRADER Tank Barge · MISLE 943849 · 11 January 2009 · activity 3392354

Inspection history · 81

19 March 2026 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8328787
30 December 2025 MTSA/ISPS Verification · ACP Periodic Oversight · Deficiency Check · Periodic Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8288650
26 December 2025 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8287435
26 November 2025 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8274637
10 November 2025 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8266499
29 October 2025 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8260360
13 October 2025 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8251515
6 October 2025 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8247486
15 July 2025 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8186212
1 March 2025 Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8095675
13 December 2024 Damage Survey · Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8047134
10 December 2024 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8044101
8 December 2024 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8044734
14 November 2024 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8034701
15 October 2024 ACP Annual Oversight · Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8019515
26 September 2024 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8009775
29 August 2024 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7991735
26 July 2024 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7967405
26 June 2024 Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7942604
15 April 2024 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7895482
8 April 2024 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7891606
8 April 2024 Administrative Inspection · Permit to Proceed
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7892152
5 April 2024 Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7890540
5 April 2024 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7991930
24 October 2023 MTSA/ISPS Verification · ACP Handover Survey · Ballast Water Examination · COI Inspection · Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7791545
14 January 2023 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7620756
13 December 2022 Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7608447
4 November 2022 Annual Inspection · MARPOL Annex I Examination · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7588137
19 March 2022 TPO Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7416297
7 March 2022 ISM SMC Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7407146
27 January 2022 MTSA/ISPS Verification · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7386802
30 December 2021 Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7373811
9 November 2021 Security Plan Review - VSP · Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7348070
1 November 2021 Drydock Exam · Administrative Inspection · Underwater Inspection in lieu of Drydock
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7366654
20 October 2021 Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7335813
28 September 2021 Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7323147
18 May 2021 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7200317
14 May 2021 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7197069
23 February 2021 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7144893
1 February 2021 Examination of Repairs · Administrative Inspection · Damage Survey
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7134035
22 January 2021 MTSA/ISPS Verification · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7115692
14 January 2021 Deficiency Check · Damage Survey · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7124750
22 April 2020 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 6942243
10 February 2020 Administrative Inspection · MTSA/ISPS Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6904984
11 December 2019 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6872049
30 April 2019 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6673260
15 October 2018 MARPOL Annex VI Survey · Internal Structural Exam · MARPOL Annex IV Survey · Administrative Inspection · Ballast Water Examination · Hull Examination · Examination of Repairs · Drydock Exam · MTSA/ISPS Verification · MARPOL Annex V Examination · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6561322
24 August 2018 Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6521943
5 December 2017 Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6319771
7 December 2016 MTSA/ISPS Verification · DAPI Audit · MARPOL Annex I Examination · Periodic Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6056845
14 September 2016 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6000773
9 June 2016 Underwater Inspection in lieu of Drydock
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5914449
6 June 2016 Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5895028
17 March 2016 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5835033
5 January 2016 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5790994
16 January 2015 Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5054320
13 January 2015 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5050566
9 June 2014 MTSA/ISPS Verification
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 4883774
13 September 2013 COI Inspection · Examination of Repairs · MARPOL Annex I Examination · Internal Structural Exam · DAPI Audit · Hull Examination · Administrative Inspection · Plan Review (Other than "T") · Welding Related Inspections Qualification Testing · Drydock Exam · Ballast Water Examination · MTSA/ISPS Verification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4727909
25 January 2013 MTSA Verification · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4522593
1 May 2012 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4299669
17 January 2012 DAPI Audit · Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4225682
15 July 2011 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4082650
30 June 2011 Underwater Inspection in lieu of Drydock · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4053231
11 May 2011 MTSA/ISPS Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4008234
14 February 2011 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3944736
5 January 2011 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3921006
24 September 2010 Deficiency Check
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3856176
24 June 2010 Administrative Inspection
Administrative · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3775302
22 June 2010 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3773875
12 May 2010 Deficiency Check
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3736620
3 May 2010 Deficiency Check
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3767900
14 January 2010 Annual Inspection
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3672372
2 December 2009 Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3643600
1 December 2009 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3646425
30 April 2009 Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3464201
14 March 2009 In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3433556
12 February 2009 In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3416819
11 January 2009 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3392354
28 December 2008 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3389337
10 May 2008 MARPOL Annex I Examination · Construction Oversight · Initial Certification · MTSA/ISPS Verification · Plan Review (Other than "T")
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 3355061

Deficiency record · 34

07 - Fire Safety › N/A - No Subsystem › Main Vertical zone
Issued 30 December 2025 Resolved
Where "A" class divisions are penetrated, such penetrations shall be in accordance with FTP code. Wire penetration from storage locker with galley fire extinguishing system to the main stair case has open areas and B rated panel in stair case damaged and not connected to adjacent panel.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 January 2026
Resolved 5 January 2026
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 30 December 2025 Resolved
Fire protection system and fire fighting systems and appliances shall be properly tested and inspected. Fixed CO2 system rupture valves on exterior of CO2 room had holes blocked with safety seal.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 January 2026
Resolved 5 January 2026
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 30 December 2025 Resolved
An immersion suit of an appropriate size complying with the requirements of section 2.3 of the code shall be provided for every persons on the ship. Three crew could not properly don the provided immersion suits.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 January 2026
Resolved 5 January 2026
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 April 2024 Resolved
Propulsion machinery, including main engines, reduction gears, shafting, bearings, and electrical equipment and systems, must: (1) be maintained to ensure proper operation; (2) be suitable for route and service; and (3) have suitable propulsion controls to provide the operator full control. On 5APR24, Sector Miami received notice of a port engine malfunction. Identify and repair the port engine. Provide a class survey attesting to the functionality of the port engine prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 June 2024
Resolution: Received ABS Survey Report (Findiing # 252.1), attesting to the repairs of the port MDE.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 January 2023 Resolved
Operational tests and checks of all safety and limit controls, combustion controls, programming controls, and safety relief valves must be conducted by the owner, chief engineer, or person in charge at the inspection for certification, periodic inspection, and when directed by the Officer in Charge, Marine Inspection, to determine that the control components and safety devices are functioning properly and are in satisfactory operating condition. No record of last testing of safty relief valve on thermal fluid heater.
Condition: Invalid
Action required: 705 - Other - as specified
Due 2 July 2023
Resolved 24 February 2023
Resolution: Received third party test certificate, requirements cleared
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 4 November 2022 Resolved
In the CO2 space on the 01 Level, there was excessive gear stowed (filters, rowing machine and assorted bags) which blocked the accessibility to the operation of the fixed CO2 system. Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. (Area cleared while on-board)
Action required: 10 - Deficiency Rectified
Due 4 November 2022
Resolved 4 November 2022
Resolution: Area cleared while onboard
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 4 November 2022 Resolved
On the main deck, the goose-neck air supply vent closure for the paint locker, is inoperable/frozen and not able to be closed in the case of discharging the fixed CO2. Fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs, structural fire protection including fire resisting divisions, and protection of openings and penetrations in these divisions.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 November 2022
Resolution: (Item corrected after departure Master provided pictures)
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 4 November 2022 Resolved
The vent closure on the 01 Level for the incinerator room, which is on the main deck, is not able to be closed in the case of discharging the fixed CO2. Fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs, structural fire protection including fire resisting divisions, and protection of openings and penetrations in these divisions.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 November 2022
Resolution: (Item corrected after departure Master provided pictures)
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 4 November 2022 Resolved
The area around the rescue boat davit on 01 Level, was blocked by 55 gallon drums and a pilot ladder hanging over the handrail making it difficult to raise the boat by hand crank handle. This area is to be cleared. Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 4 November 2022
Resolution: (Item corrected after departure Master provided pictures)
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 4 November 2022 Resolved
The sheaves on the davit arm for the rescue boat do not roll when in use, (boat is still able to be launched). Demonstrate that all the sheaves roll as needed. Life-saving appliances and associated parts shall be in good working order.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 November 2022
Resolution: (Item corrected after departure Master provided pictures)
14 - Pollution Prevention › 146 - MARPOL Annex VI › Incinerator incl. operations and operating manual
Issued 4 November 2022 Resolved
A inspection of the incinerator, on the main deck, found the refractory wall broken, separating and cracked. The condition of the walls makes the incinerator unsafe to use. The condition of the ship and its equipment shall be maintained to conform with the regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on-board. The incinerator is NOT to be used until proper repairs are made by a authorized repair company/technician and may not go into service until a technicians report is provided and inspected by a USCG Marine Inspector.
Action required: 705 - Other - as specified
Due 30 June 2023
Resolved 15 December 2023
Resolution: MI received, reviewed and accepted documentation from ABS attesting to the satisfactory repair and testing of the vessel's incinerator. Def cleared.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 4 November 2022 Resolved
Each boiler, including super heater, reheater, economizer, auxiliary boiler, low-pressure heating boiler, and unfired steam boiler, must be available for examination by the marine inspector at intervals specified. The boiler in the engine room is not listed on the present COI. If the vessel intends to use the boiler, prior to its operation, the boiler must be examined by a USCG Marine Inspector
Action required: 705 - Other - as specified
Resolved 14 January 2023
Resolution: Tested safety devices with the exception of the Thermal Fluid Heater Saftey Relief Valve. Issued new requirement for testing under activity 7620756.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 January 2021 Resolved
(b)The main steering gear and rudder stock must be - (1) Of adequate strength for and capable of steering the vessel at maximum ahead service speed, which must be demonstrated to the satisfaction of the cognizant Officer in Charge, Marine Inspection. (4) Designed so that they will not be damaged when operating at maximum astern speed; however, this requirement need not be proved by trials at maximum astern speed and maximum rudder angle. Prior to conducting operations as an ATB with cargo. Vessel is to conduct repairs to the starboard rudder seal box to the satisfaction of the RO (ABS) and the cognizant OCMI.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 January 2021
Resolution: Received ABS survey report noting condition of class issued for stbd rudder stock seal box to be repaired no later than 20OCT21.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 10 February 2020 Resolved
Line on life buoys shall be resistant to ultraviolet light. Replace deteriated line on buoys on both bridge wings and Strb main deck.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 February 2020
Resolved 18 February 2020
Resolution: Vessel replaced lines and provided photos to office.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 24 August 2018 Resolved
Vessel has reduced maneuverability (as designed) due to a loose articulating rudder flap. Make permanent repairs to the articulating rudder flap to normal operation. If repairs are to be made at the 2018 drydock, advise this OCMI and request an extension for this deficiency. All navigation watch standers and harbor pilots shall be informed of the reduced maneuverability as it relates to the posted maneuvering fact sheet.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 September 2018
Resolved 14 November 2018
Resolution: Repaired in drydock
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 13 January 2015 Resolved
Lower bolt of the keel conenction for the forward strap of the rescue baot lifting assembly was found sheared off. Temporary repair was authorized. Vessel may proceed to Tampa where permanent repairs are to be conducted to satisfaction of Marine Inspector IAW manufacturer requirements. 46CFR 90.27-1
Action required: 705 - Other - as specified
Due 13 January 2015
Resolved 16 January 2015
Resolution: Bolt replaced with new as per manufacturer requirements. Harding Technician Wayne provided tech report (see attached).
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 17 January 2012 Resolved
Control air UPV to be hydrostatically tested prior to 01/21/12.
Action required: 705 - Other - as specified
Due 21 January 2012
Resolved 20 January 2012
Resolution: Witnessed hydrostatic test of the UPV to 250 psi, all sat.
Documentation › Certificates/Documents › International Air Pollution Prevention Certificate
Issued 17 January 2012 Resolved
Vessel has SOVC cert. issued by ABS. Needs IAPP cert. by 08Jan2012 to make international voyages as per Policy Ltr 09-01. 835 issued restricting the vessel to domestic voyages only.
Action required: 705 - Other - as specified
Resolved 1 May 2012
Resolution: Received copy of full term IAPP certificate issued by ABS.
Operations/Management › Drills/Instruction › Not Conducted
Issued 17 January 2012 Resolved
Vessel required to conduct fire and abandon ship drill to the satisfaction of attending Marine Inspector within 14 days.
Condition: Invalid
Due 31 January 2012
Resolved 23 January 2012
Resolution: Completed drills. All sat.
Engineering › Pressure Vessel › Marking and Stamping
Issued 7 January 2011 Resolved
Pressure Vessels (2 air receivers and 1 thermal boiler) are not stamped with the ASME symbol, indicating compliance with ASME code. Pressure vessels were built in Europe to a different standard. Submit documentation to MSC for equivalancy.
Action required: 705 - Other - as specified
Due 19 March 2011
Resolved 17 May 2011
Resolution: Cleared based on documetary evidence.
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 5 January 2011 Resolved
Relief valves did not relieve at design pressure for air receivers, 33 bar. #1 relieved at 34 bars, #2 at 36 bars.
Action required: 705 - Other - as specified
Due 19 February 2011
Resolved 11 February 2011
Resolution: Witnessed 2 new valves installed with certificates.
Deck/Cargo › Towing › Terminal Gear
Issued 22 June 2010 Resolved
Install the three manufacturer upgrades to the grease system for the pins as discussed in CDV letter #16711 dated 11June2010 no later than 11July2010.
Due 11 July 2010
Resolved 20 July 2010
Resolution: Received email verifying condition has been corrected.
Engineering › Diesel Engine (propulsion-reduction gear) › Valve
Issued 14 January 2010 Resolved
Demonstrate successful vital system automation test procedures IAW 46 CFR 61.40.
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 3 May 2010
Resolution: Procedures have been amended and appropriate tools to carry out procedures have been provided.
Engineering › Steam Boiler (auxiliary/waste heat) › Automation Equipment
Issued 14 January 2010 Resolved
Demonstrate successful test procedures on both automatic auxiliary boilers IAW 46 CFR 61.35.
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 3 May 2010
Resolution: Procedures have been amended and appropriate tools to carry out procedures have been provided.
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 14 January 2010 Resolved
Revise the SMS to include a more definitive test procedure for both the OWS and the engine room dewatering bilge pump IAW 46 CFR Part 96. (ISM Code).
Action required: 705 - Other - as specified
Due 14 February 2010
Resolved 14 February 2010
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 14 January 2010 Resolved
Ensure all exhaust/thermal pipes are covered with insulation (all exposed pipes) to include the harbor generator, EDG and TFH IAW 46 CFR 56.50.
Action required: 705 - Other - as specified
Due 14 February 2010
Resolved 14 February 2010
Construction/Loadline › Structures › Superstructure
Issued 14 January 2010 Resolved
Renew the broken window on the pilot house (port side).
Action required: 705 - Other - as specified
Resolved 24 September 2010
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 2 December 2009 Resolved
Prior to departing Kenner Anchorage make permanent repairs to propulsion system. Demonstrate proper operation of system to attending marine inspector. Provide service tech, and Class reports to marine inspector. Stand-by tug to remain on scene until repairs are made.
Action required: 17 - Rectify deficiencies prior to departure
Due 3 December 2009
Resolved 3 December 2009
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Distributor (fuel injection)
Issued 2 December 2009 Resolved
provide analysis and proposal for MDE fuel system modifications that will prevent loss of fuel in the event of power loss
Due 3 January 2010
Resolved 7 December 2009
Resolution: ABS issued requirement for further testing for adaquacy of fuel system reserve.
Engineering › Fuel Oil Service System › Piping
Issued 2 December 2009 Resolved
Make permanent repairs to EDG fuel system to prevent system from becoming air bound. Until repairs are made, run EDG twice daily, without load for 10 minutes. Log in engineers log.
Action required: 705 - Other - as specified
Due 3 January 2010
Resolved 8 December 2009
Engineering › Diesel Engine (propulsion-direct drive) › Bearing
Issued 14 March 2009 Resolved
MV. Brownsville reported that the STBD engine automated alarm system is malfunctioning resulting in numerous alarm defaults including high bearing temp. As a result the vessel secured use of the STBD engine until the manufactures representative could identify the cause of the alarm.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2009
Resolution: The cause of the malfunctioning alarm system was an improperly secured ground located in the main control panel. CG-835 Cleared
Engineering › Diesel Engine (propulsion-reduction gear) › Valve
Issued 12 February 2009 Resolved
Vessel is to provide a written report attesting to the proper operation of the port main engine after discovery of an intermittent electrical fault that caused a false overspeed indication and resulted in the involuntary shutdown of the port main engine. Report from engines manufacture rep. shall be provided prior to the vessels departure from Port Canaveral.
Action required: 705 - Other - as specified
Due 13 February 2009
Resolved 14 February 2009
Resolution: Wartsila technician provided report attesting to the proper operation of the engine
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 10 May 2008 Resolved
Company to submit risk analysis to ABS for assessment of Fire Control Station located on the main deck passage way. Recommendations are to then be forwarded to MSC for review and final approval.
Action required: 705 - Other - as specified
Due 4 February 2009
Resolved 23 January 2009
Resolution: Resolved, see MSC ltr 23JAN09 H2-090057 in vsl documents.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 10 May 2008 Resolved
Prior to receiving reduction in manning after vessel has logged minimum hours of service. Company to submit verified ATP's as initialed by the Attending Inspector to the [name withheld] for stamping and final approval.
Action required: 705 - Other - as specified
Resolved 30 April 2009
Resolution: Spoke w/ [name withheld] and determined that there will be no reduction in manning.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.