Records from 2007 to 2024. Most recent: inspection, 23 June 2024.
Inspection history · 17
23 June 2024
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7940347
2 April 2024
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7880117
16 March 2024
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7880175
31 July 2023
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7758635
31 July 2023
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7758771
15 December 2022
PSC A
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7609475
16 June 2021
PSC B
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7226743
12 April 2020
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6938531
6 April 2020
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7071982
25 October 2019
Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6842199
25 September 2019
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6816104
24 November 2017
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6312036
13 May 2016
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5876147
1 April 2009
MARPOL Annex V Examination · Ballast Water Examination · MARPOL Annex I Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3435705
25 June 2008
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3247776
16 June 2008
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3238575
26 September 2007
ISPS II Exam · Ballast Water Examination · MARPOL Annex V Examination · MARPOL Annex I Examination · PII Safety Exam
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3066085
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 2 April 2024
Resolved
Maintenance, testing and inspections of life-saving appliances shall be carried out in a manner having due regard to ensuring reliability of such appliances. PSCO observed port side lifeboat with cracked forward window.
74 SOLAS (20) III/20.3.1
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 22 June 2024
Resolution: Class report received attesting to satisfaction of repairs completed by vessel.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 25 September 2019
Resolved
0999 - PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED. OBSERVED A FRESH WATER SUPPLY PIPE IN THE SHIPS LAUNDRY ROOM THAT HAD MULTIPLE PATCHES. SOLAS 2004 CONS. CH. II-1/26
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 October 2019
Resolved 25 October 2019
Resolution: received photos from the vessel attesting to the satisfactory replacement of the fresh water supply pipe in the ship's laundry room
Fire Fighting › Fire Main › Condition
Issued 1 April 2009
Resolved
Epoxy soft patch/temporary repair found on the # 1 and #2 fire/general service pump flange to the suction pipe; crew stated flanges were holed/leaking and temporally repaired it approximately 2 months ago. No evidence provided of non-conformity report submitted to company. Address to class/flag representative satisfaction.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 April 2009
Resolution: The temporary repaired pipes on suction side of no.1 and no. 2 fire and gs pump were replaced with brand new pipes. Such repaired pipes were tested under normal operating condition with pressure 5MPa and found satisfactory.