Records from 2011 to 2026. Most recent: inspection, 3 January 2026.
Documentation record
Registered dimensions (L × B × D)93.0 ft × 40.0 ft × 22.2 ft
Registered tonnagegross 194 / net 132
ITC dimensions (L × B × D)93.0 ft × 40.0 ft × 22.2 ft
ITC tonnagegross 414 / net 124
BuilderICE FLOE LLC · FREELAND, WA, UNITED STATES · built 2010
Hull materialSteel
PropulsionDiesel
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, charter, Registry
DocumentationValid · issued 3 March 2026 · expires 28 February 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it414 - Convention (Subpart B), Gross Ton
194 - Regulatory (Subpart C or D), Gross Ton
321 - Dead Weight, Ton
817 - Displacement, Ton
124 - Convention (Subpart B), Net Ton
132 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 20
3 January 2026
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8289693
11 August 2025
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 8259257
24 August 2023
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7776661
15 August 2023
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7769098
31 July 2023
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7758771
2 February 2023
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7630994
6 December 2022
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7604175
22 August 2022
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7540779
1 December 2021
MARPOL Annex VI Survey · MARPOL Annex I Examination · Ballast Water Examination · Exemption · MARPOL Annex IV Survey · Administrative Inspection · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7367585
26 May 2021
Deficiency Check · Initial Certification
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7206379
30 December 2020
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7117959
28 July 2019
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6959277
5 June 2019
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6709790
8 August 2018
Bulk Liquid Transfer Monitor
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6587499
11 July 2018
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6476087
23 April 2018
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6397808
14 August 2013
MTSA Verification
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4686037
16 July 2012
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4380846
24 May 2012
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4329937
20 January 2011
MTSA Verification · Industry Initiated Exam
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 3930510
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 3 January 2026
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions.
Vessel lost propulsion in one z-drive while underway.
46 CFR 143.205(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2026
Resolved 3 January 2026
Resolution: Received ABS report
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 13 December 2021
Resolved
The master must ensure that all lifesaving equipment is properly maintained and ready for use at all times. Vessel's liferaft discovered past due for required annual servicing. 46 CFR 141.230
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 December 2021
Resolution: Received servicing report for liferaft and verified documentation that liferaft was properly installed on board vessel.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 13 December 2021
Resolved
All portable fire extinguishers, semi-portable fire-extinguishing systems, fire detection systems, and fixed fire-extinguishing systems, including ventilation, machinery shutdowns, and fixed fire-extinguishing system pressure-operated dampers on board the vessel, must be inspected or tested at least once every 12 months. Vessel's portable fire extinguishers and fixed fire-extinguishing system discovered past due for required annual servicing. 46 CFR 142.240(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 December 2021
Resolution: Verified required servicing documentation attesting to serviced fixed and portable fire-extinguishing systems.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 3 June 2021
Resolved
All safety and relief valves for use on pressure vessels
shall be designed to meet the protection and service requirements for which they are intended and shall be set to relieve at pressure which does not exceed the "maximum allowable working pressure". MI observed the pressure relief valve is set higher the the MAWP.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 June 2021
Resolved 15 June 2021
Resolution: New relief safety pressure valve installed on 02 air receivers and has PSI set to 250.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 26 May 2021
Resolved
Each towing vessel must be operated in compliance with 33 CFR parts 101 and 104, as applicable. MI did not see a valid security plan on board. Vessel must have a security plan on board.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2021
Resolved 15 June 2021
Resolution: Verified an active Vessel Security Plan on board, vessel had documentation of an Alternative Security Plan. Meets regulations