Records from 2008 to 2025. Most recent: inspection, 1 December 2025.
Documentation record
Registered dimensions (L × B × D)576.0 ft × 105.6 ft × 61.7 ft
Registered tonnagegross 29,242 / net 11,926
ITC dimensions (L × B × D)576.0 ft × 105.6 ft × 61.7 ft
ITC tonnagegross 29,242 / net 11,926
BuilderAKER PHILADELPHIA SHIPYARD INC · PHILADELPHIA, PA, UNITED STATES · built 2008
Hull materialSteel
PropulsionDiesel Direct
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 12 September 2025 · expires 31 October 2026
Service, as the file records itTank Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it29242 - Convention (Subpart B), Gross Ton
56242 - Displacement, Ton
11926 - Convention (Subpart B), Net Ton
46817 - Dead Weight, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 55
1 December 2025
Deficiency Check · Periodic Inspection · MTSA/ISPS Verification · ACP Periodic Oversight
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8262705
2 October 2025
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8245189
2 June 2025
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8149703
9 May 2025
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8131546
18 October 2024
ACP Annual Oversight · MTSA/ISPS Verification · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8024255
28 May 2024
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7921818
5 May 2024
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 8050566
14 March 2024
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7879413
26 December 2023
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7842500
24 November 2023
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7829051
24 November 2023
In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7829054
5 September 2023
Re-Inspection · MTSA/ISPS Verification · ACP COI Oversight
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7784957
25 August 2023
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7782021
28 July 2023
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7755187
30 November 2022
Administrative Inspection · MTSA/ISPS Verification
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7603141
21 November 2022
MTSA/ISPS Verification · ACP Annual Oversight · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7597883
11 August 2022
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7530593
1 July 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7492477
20 June 2022
ISM SMC Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7482695
11 June 2022
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7476567
15 May 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7451449
12 January 2022
MTSA/ISPS Verification · ACP Annual Oversight · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7380010
14 April 2021
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7175116
22 December 2020
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7115215
5 November 2020
ACP Annual Oversight · MTSA/ISPS Verification · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7089089
28 March 2020
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6932665
8 March 2020
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6990659
16 September 2019
MTSA/ISPS Verification · Annual Inspection · ACP Annual Oversight
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6812780
12 September 2019
In-Service Inspection · Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6813201
6 September 2018
ACP COI Oversight · MTSA/ISPS Verification · Re-Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6528583
27 November 2017
Annual Inspection · ACP Annual Oversight
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6313207
5 September 2017
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6281108
17 May 2017
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6228740
22 March 2017
Deficiency Check · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6110435
21 March 2017
In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6109425
21 March 2017
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6123229
28 October 2016
Type not recorded
No type recorded · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6031427
28 September 2016
Administrative Inspection · MTSA/ISPS Verification · ACP Annual Oversight
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6009687
7 June 2016
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5901164
7 April 2016
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5856517
6 January 2016
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5793395
7 December 2015
MTSA/ISPS Verification · Administrative Inspection · ACP Annual Oversight
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5772195
30 August 2014
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4969522
8 February 2012
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4249661
3 February 2012
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4237943
7 September 2011
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4160165
23 November 2010
ACP Annual Oversight
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3898946
3 December 2009
ACP Annual Oversight
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3644560
9 July 2009
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3528702
10 April 2009
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3450085
8 February 2009
In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3425230
25 September 2008
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3332988
25 September 2008
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3334789
28 August 2008
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3311240
21 April 2008
MTSA/ISPS Verification · ACP COI Oversight · Construction Oversight
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3189014
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 1 December 2025
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a
design and construction adequate for the service for which they are intended and shall be so installed and
protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts,
hot surfaces and other hazards. The design shall have regard to materials used in construction, the purpose
for which the equipment is intended, the working conditions to which it will be subjected and the
environmental conditions on board. Marine Inspectors observed a significant water leak coming from the Emergency Fire pump seal. 74 SOLAS(04)II-1/26.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 January 2026
Resolved 5 December 2025
Resolution: Received ABS report. Mechanical seal was replaced with ships spare, pump operationally tested, and all found to be satisfactory.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 1 December 2025
Resolved
he machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a
design and construction adequate for the service for
which they are intended and shall be so installed and
protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts,
hot surfaces and other hazards. The design shall have regard to materials used in construction, the purpose
for which the equipment is intended, the working conditions to which it will be subjected and the
environmental conditions on board. Marine Inspector observed make-up-feedwater pipe from freshwater tank to system in steering gear room with multiple soft patches between tank and isolation valve. 74 SOLAS(04)II-1/26.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 January 2026
Resolved 5 December 2025
Resolution: ABS Survey report received. Physical attendance carried out on 03 Dec 2025 by the undersigned to verify that the crew removed existing soft patches, cleaned the pipe,
and applied "STOP-IT" pipe wrap product. This product does have an ABS product design
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management System (BMWS)
Issued 28 May 2024
Resolved
The master, owner, operator, agent, or person in charge of a vessel equipped with ballast tanks that operates in the waters of the United States must employ one of the following ballast water management methods:
(1) Install and operate a ballast water management system (BWMS) that has been approved by the Coast Guard under 46 CFR part 162. Ballast water treatment discharge system is not eliminating chlorine as designed. Repair ballast water treatment system to the satisfaction of the RO (ABS). Vessel authorized to employ ballast treatment option D-1 as indicated on Ballast Water Management Certificate.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 June 2024
Resolved 2 July 2024
Resolution: Received survey report from ABS.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 November 2023
Resolved
The requirements of § 58.10–5 (a)... shall apply to diesel engine installations... All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. The #2 cylinder on the vessel's main engine experienced a high-temperature alarm. The #2 cylinder was taken off-line leaving the remaining 5 cylinders operational. Due to the loss of the #2 cylinder, the vessel is only able to operate at 70% propulsion capacity. Proper repairs shall be conducted in Port Everglades. An attestation letter from the Recognized Organization shall be submitted to Sector Miami prior to the vessel's departure.
46 CFR § 58.10-10
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 November 2023
Resolution: it was determined that the non-return valves for unit #2 and #5 malfunctioned and was replaced with new non-return valves manufacture Part number P9083-0040 and drop down test of all 6 exhaust valves were carried out and found satisfactory .
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 12 January 2022
Resolved
Structural fire protection, including fire-resisting divisions, and protection of openings and penetrations in these division shall be kept in good order so as to ensure their required performance if a fire occurs. Fire boundary penetrations in the deck of the navigation bridge electrical equipment room has mixed and disturbed fire stop material. All were found to have mismatched systems using a mix of concrete fire stop material and putty fire stop material in each penetration which is not an approved installation. 74 SOLAS (09) II-2/14.2.1.1.1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 January 2022
Resolution: ABS accepted the deficiency as a condition of Class by report number 5108991.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 12 January 2022
Resolved
Doors that are required to be self-closing in fire-resisting divisions in cargo ships shall not be fitted with hold-back hooks. The fire door at the navigation bridge stairway had a mechanical hold-back screwed into the door and was secured in the open position. 74 SOLAS (09) II-2/9.4.2.2
Action required: 10 - Deficiency Rectified
Resolved 12 January 2022
Resolution: Mechanical hold back was removed from the fire door and the door was verified to self-close.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 5 November 2020
Resolved
Except as provided in paragraphs 5 & 6, lifesaving appliances and arrangements required by this chapter shall be approved by the administration. Rescue boat launching appliances are not marked as required by 46 CFR 160. Mark release gear and davit assemblies to the satisfaction of the Marine Inspector. 46CFR160.133-17(b)(1), 46CFR160.115-17(c)(5), 46CFR160.132-17(c)(5).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2020
Resolved 9 November 2020
Resolution: ABS converted to statutory deficiency.
Electrical › Electric Generation Source (service) › Generator
Issued 21 March 2017
Resolved
Failure of online generator, causing ship to lose power, lose main engines and go darken ship.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 21 March 2017
Resolved 22 March 2017
Resolution: Recieved ABS report CX3303915 attesting deficiency correction.
Engineering › Lubricating Oil Service System › Valve, Control
Issued 6 January 2016
Resolved
Vessel experienced main propulsion loss while transiting the LMR due to cylinder oil control system failure.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 January 2016
Resolved 8 January 2016
Resolution: Vessel determined that the lubrication system control module on the main engine malfunctioned and would not allow the engine to perform as designed. Module was repaired and underway tested. See attached technical and class reports.
Deck/Cargo › Holds/Tanks › Portable Gas Measuring Equipment
Issued 3 December 2009
Resolved
Vessel only had 1 portable gas detector onboard, and it was not working properly. Vessel is required to have 2 properly operating portable gas detectors onboard. Issued CG-835 stating: Prior to conducting cargo operations vessel must have 2 properly operating gas detectors onboard.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 December 2009
Resolution: Received satisfactory class report.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 3 December 2009
Resolved
Vapor connection flange 0.5 x 1.0 stud was missing on the port side manifold. Issued CG-835 stating: Properly repair VCS vapor connection port side manifold to the satisfaction of attending Coast Guard Marine Inspector, and prior to discharge which requires the vapor control system.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 5 December 2009
Resolution: Received satisfactory class report.
Construction/Loadline › Markings › Load Line Mark
Issued 3 December 2009
Resolved
Load line marking on the port side of vessel were not visible. Issued CG-835 stating: Port Side load line markings need to be in contrasting color to the satisfaction of the classification certifying authority within 30 days.
Action required: 705 - Other - as specified
Resolved 5 December 2009
Resolution: Received satisfactory class report.
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 21 April 2008
Resolved
Submit Plans & Drawings for Main Engine Governor Control System to include alarms, failure Modes Analysis, And Functionality for Governor failure And Governor Signal Failure to Coast Guard Marine Safety Center for Approval. This item is to be cleared to the Satisfaction Of The Officer In Charge Marine Inspections Sector Delaware Bay.
Due 30 October 2009
Resolved 3 November 2009
Resolution: Received documentary proof from MSC satisfying the requirement.