Records from 2008 to 2025. Most recent: inspection, 14 May 2025.
Documentation record
Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.5 ft
Registered tonnagegross 735 / net 735
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderC & C MARINE & REPAIR INC · BELLE CHASSE, LA, UNITED STATES · built 2008
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portST LOUIS, MO
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 11 February 2026 · expires 31 March 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it735 - Simplified, Gross Ton
735 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 25
14 May 2025
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8136103
26 September 2022
Type not recorded
No type recorded · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 7577317
27 January 2022
Administrative Inspection · Internal Structural Exam · MTSA Verification · COI Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7386655
13 March 2019
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6688462
18 September 2018
Damage Survey · Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6543015
17 September 2018
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6550712
19 October 2017
Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6290890
19 October 2017
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6321039
26 May 2017
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6156252
17 May 2017
Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6148433
16 May 2017
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6148404
18 November 2016
Examination of Repairs · Hull Examination · Internal Structural Exam · MTSA Verification · Cargo Tank Internal · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6041715
20 July 2016
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 5969895
15 July 2016
Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 5956975
7 August 2015
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 5755815
2 September 2014
Periodic Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4973519
11 June 2013
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4646984
18 June 2012
Internal Structural Exam · MTSA Verification · Administrative Inspection · COI Inspection · Cargo Tank Internal
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4348081
12 June 2012
Administrative Inspection
Administrative · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 4341728
18 February 2011
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3946681
18 January 2011
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3928447
30 August 2010
Administrative Inspection
Administrative · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3838009
16 June 2010
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3762967
14 May 2009
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3477630
8 April 2008
Administrative Inspection · COI Inspection · Construction Oversight · Cargo Tank Internal · Hull Examination · Initial Certification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3179640
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 September 2018
Resolved
When major alterations or major repairs of tank vessels become necessary the work shall be done under the direction of the Officer in Charge, Marine Inspection, and shall be in accordance with the regulations in effect for new construction insofar as possible. When minor alterations or minor repairs of tank vessels become necessary such work shall be under the direction of the Officer in Charge, Marine Inspection, and shall be in accordance with the regulations in effect at the time the vessel was contracted for or built, or in accordance with the regulations in effect for new construction insofar as possible.
NO2 Cargo Tank suffered damage as follows: Nos. 5, 6 & 7 Starboard raised trunk vertical stiffener plates and horizontal cargo tank top stiffeners recently set aft 0” to 18” from original.
Crop and renew three (3) 18” x 3/8” vertical flanged plate approximately 5’3” long each and part renew three (3) 18” x 3/8” flanged plate approximately 4’0” long each.
(705) One time discharge/prior to loading
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 4 October 2018
Resolution: Verified satisfactory repair in kind is complete
Stability › Weathertight Integrity › General
Issued 17 May 2017
Resolved
Prior to movement provide and recieve approval fro salvage plan.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 31 May 2017
Resolved 17 May 2017
Resolution: Recieved and approved plan
Construction/Loadline › Hull › Bottom Plating
Issued 17 May 2017
Resolved
Vessel was involved in significant collision which caused the port timberhead to become lodged in the rake of another vessel. No apparent damage, however due to the impact, vessel directed to offload cargo and make bow rake gas free and available for inspection.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 June 2017
Resolved 26 May 2017
Resolution: Entered and examined bow rake void, no damage found.
Construction/Loadline › Hull › Side Shell
Issued 15 July 2016
Resolved
The forward 25’-3” of the port No. 3 wingtank side plating was set in from 0-6” over height with the outboard 27” of the adjacent deck plating distorted from 0-1” to conform over a length of 2’-6”.
The after 14’-6” of the upper 5’ of the port No. 3 wingtank side plating was set in from 0-3 ½”.
The internal structurals were distorted to conform to the above-described damages.
Action required: 705 - Other - as specified
Due 29 July 2016
Resolved 20 July 2016
Resolution: Satisfacorily completed air test. See narritive for steel replacement.
Construction/Loadline › Hull › Hull Plating
Issued 15 July 2016
Resolved
An aprox. 18” x 1/8” fracture at stbd bow rake knuckle
Action required: 705 - Other - as specified
Due 29 July 2016
Resolved 20 July 2016
Resolution: Air test satisfactorily completed. fracture was repaired in accordance with NVIC 7-68.
Deck/Cargo › Vapor Control Systems › Vapor Recovery Unit
Issued 8 April 2008
Resolved
Vessel is not authorized to use the Vapor Recovery System until it as been approved and inspected by the US Coast Guard
Due 30 April 2008
Resolved 22 April 2008
Resolution: Received proper documentation from the MSC for the approval of the VRS