Records from 2008 to 2026. Most recent: inspection, 5 May 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the tow units, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 27 March 2025
Resolved
Bulkheads of galleys, paint and lamp lockers, and emergency generator rooms shall be of “A” Class construction. The galley's rolling shutter door did not operate as intended, rather it became stuck before it could seal at the fully closed position.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2025
Resolved 28 March 2025
Resolution: Vessel replaced the non-functional unit in question with another that was onboard.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 27 March 2025
Resolved
The boundary bulkheads and decks separating the accommodations and control stations from cargo and machinery spaces, galleys, main pantries and storerooms, other than small service lockers, shall be of “A” Class construction. The overhead structural fire protection in the generator room was damaged and in need of replacement.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2025
Resolved 30 March 2025
Resolution: Vessel replaced damaged structural fire protection.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 27 March 2025
Resolved
The boundary bulkheads and decks separating the accommodations and control stations from cargo and machinery spaces, galleys, main pantries and storerooms, other than small service lockers, shall be of “A” Class construction. The 03 deck machinery locker had missing fire caulk and loose wire pass-throughs.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2025
Resolved 29 March 2025
Resolution: Vessel replaced wire pass-throughs in question and re-sealed the missing caulk.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 27 March 2025
Resolved
The owner of a vessel shall ensure that such vessel is equipped with a vessel master key control system, manual or electronic, which provides controlled access to all copies of the vessel's master key. Vessel was not equipped with a master key control system.
46 USC 3106(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2025
Resolved 27 March 2025
Resolution: Vessel created a master key control log to meet the requirements of 46 USC 3106.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 27 March 2025
Resolved
The owner of a vessel to which the surveillance requirements of 46 USC 4901 applies shall provide clear and conspicuous signs on board the vessel notifying the crew of the presence of video and audio surveillance equipment. Vessel did not have required signage.
46 USC 4901
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2025
Resolved 29 March 2025
Resolution: Proper postings were put in place.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Bunker delivery notes
Issued 19 March 2024
Resolved
Bunker delivery receipts are to be retained for a period of three years after the fuel oil has been delivered on board; vessel did not have any bunker receipts. To be cleared at next topside.
73 MARPOL (2011) VI/18.3.6
Action required: 705 - Other - as specified
Resolved 27 March 2025
Resolution: Inspected bunker receipts in question, found that they were all satisfactory.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Bunker delivery notes
Issued 19 March 2024
Resolved
Bunker delivery notes shall be accompanied by a representative sample of fuel; vessel did not have any fuel samples. To be cleared at next topside.
73 MARPOL (2011) VI/18.3.8.1
Action required: 703 - Prior to bunkering operations
Resolved 27 March 2025
Resolution: Inspected bunker samples in question, found that they were all satisfactory.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 22 December 2023
Resolved
Classes I, II, and III pressure vessels not containing hazardous materials must be designed and constructed in accordance with the requirements in Section VIII, division 1, of the ASME Boiler and Pressure Vessel Code. These pressure vessels must also comply with the requirements that are listed or prescribed in paragraphs (d) through (g) of this section.
Crane House Air Receiver: The pressure vessel for the crane house was newly installed prior to credit drydock. Additional information regarding the new installation is required.
Provide certified plans to the USCG prior to operations of the system in which the air receiver is incorporated.
46CFR90.20-1
46CFR54.01-5(c)(3)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 March 2024
Resolved 27 March 2025
Resolution: Inspected pressure vessels in question, found that they were all satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 26 April 2023
Resolved
Each side of the rescue boat must be marked with the name of the vessel, home port, and the number of persons for which the boat is equipped.
The rescue boat was not marked with proper markings.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 May 2023
Resolved 28 April 2023
Resolution: Vessel rep provided pictures of the rescue boat showing the markings.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 March 2022
Resolved
Electrical equipment must be arranged to prevent damage from vapors or dripping liquids. The main switchboard had cracked gray water pipe above it. Crop and renew gray water pipe.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2022
Resolved 6 April 2022
Resolution: Verified deficiency was rectified. Images uploaded to documents.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 March 2022
Resolved
All vessels shall have efficient guards on decks. P/S guard rails had missing lines which pose a potential danger. Gate on crane was damaged and inoperable. Place lines into service and replace gate.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2022
Resolved 6 April 2022
Resolution: Verified deficiency was rectified. Images uploaded to documents.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 28 March 2022
Resolved
A vessel must undergo annual maintenance of firefighting systems. Vessel did not have a firefighting maintenance report from 2022. Vessel must complete annual maintenance.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2022
Resolved 31 March 2022
Resolution: Vessel provided a Fire Fighting Maintenance Report which has been uploaded into documents.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 March 2022
Resolved
Each access to a helicopter landing area must have the following signage in place: "BEWARE OF TAIL ROTOR". Post signage at both access point.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2022
Resolved 6 April 2022
Resolution: Verified deficiency was rectified.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 28 March 2022
Resolved
Vessel must be provided with an international shore
connection available on both sides of the vessel. Stbd side connection was outfitted for overboard discharge.
Shore connection must be made available for firefighting efforts
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2022
Resolved 14 April 2022
Resolution: Images sent showing the correct configuration for this system. Uploaded into documents.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 March 2022
Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment shall be made without the knowledge of the [name withheld] on vessel. Must be approved by CG prior to use.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2023
Resolved 14 April 2022
Resolution: PAMS have been removed.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 1 April 2021
Resolved
Each vessel must have a stability letter issued by the Coast Guard or R.O. before the vessel is placed into service. This letter sets forth conditions of operation. Vsl had a crane on-board not calculated for in stability letter. Vsl must provide an updated stability letter with current equipment.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2021
Resolved 21 April 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 April 2021
Resolved
Fuel oil supply hoses on the port and starboard generator prime mover were severely chaffed. Vsl must provide non-metallic flex hose IAW SAEJ 1942.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2021
Resolved 19 April 2021
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 April 2021
Resolved
Transfer procedures must be permanently posted or available at a place where the procedures can be easily seen and used by members of the crew when engaged in transfer operations. Transfer procedures were not present at the transfer manifold. Vsl must post or make procedures available.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2021
Resolved 19 April 2021
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 1 April 2021
Resolved
A survival craft that weighs 185 kilograms( 407.8 pounds) or less may be lifted not more than 300 millimeters (1 foot) in order to launch. Vsl had cables installed in front of the liferafts. Cables must be removed so that the liferafts can be launched without exceeding the 1 foot limit.
Action required: 10 - Deficiency Rectified
Due 1 May 2021
Resolved 1 April 2021
Resolution: Crew removed wire cables.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 1 April 2021
Resolved
Where pressure-indicating gages are used, in no case shall the upper range of the gage be less than 1.2 times nor more than 2 times the pressure at which the relieving device is set to. The relief valve was set to 200 and the gage had a max psi of 160. Change gauge or relief valve to meet the proper gauge range.
Action required: 10 - Deficiency Rectified
Due 1 May 2021
Resolved 1 April 2021
Resolution: Crew changed pressure gauges to meet the required range.
01 - Certificates & Documentation › 013 - Documents › Garbage record book
Issued 25 March 2020
Resolved
Every ship of 100 GT and above, and every ship which is certified to carry 15 persons or more, shall carry a Garbage Management Plan which the crew shall follow. Write and provide evidence of a satisfactory Garbage Management Plan for the vessel.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2020
Resolved 11 February 2022
Resolution: Examined Garbage Record Book.
01 - Certificates & Documentation › 013 - Documents › Garbage record book
Issued 25 March 2020
Resolved
Every ship of 400 GT and above and every ship which is certified to carry 15 or more persons shall be provided with a Garbage Record Book. The Garbage Record Book, whether as part of the ship's official logbook or otherwise, shall be in the form specified in the appendix of MARPOL Annex V. Begin a Garbage Record Book for the vessel and continue to log entries.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2020
Resolved 11 February 2022
Resolution: Examined the Garbage Management Plan.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 March 2020
Resolved
The landing area of each helicopter facility must have drainage facilities that prevent the collection of liquids and prevent liquids from spreading to or falling on other parts of the unit. Adjust the helicopter deck drain pipe so fuel would drain overboard in emergency.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 April 2020
Resolved 11 February 2022
Resolution: Witnessed the proper functionality of the Helicopter deck drain system.
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 25 March 2020
Resolved
External high-pressure fuel delivery lines between the high-pressure fuel pumps and fuel injectors shall be protected with a jacketed piping system capable of containing fuel from a high-pressure line failure. Replace 1 missing cap on main generator.
Action required: 10 - Deficiency Rectified
Resolved 25 March 2020
Resolution: Replaced missing cap.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 25 March 2020
Resolved
A line-throwing appliance complying with the requirements of section 7.1 of the Lifesaving Code, including no less than 4 working projectiles, shall be provided. Replace expired projectiles.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 25 March 2020
Resolution: Replaced expired line throwing appliance charges.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 26 November 2018
Resolved
02 doors in galley were discovered to not have proper closing capabilities for fire protection. Vessel may transit to MSU Houma OCMI zone for repair.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 28 February 2019
Resolved 22 March 2019
Resolution: Operated and tested 02 Fire doors to be satisfactory.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 26 November 2018
Resolved
Upon completion of wire installation, conduct load test and submit records to local OCMI prior to performing any other operations with on-board crane. Notify local OCMI prior to conducting load test.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 January 2019
Resolved 28 January 2019
Resolution: Vessel conducted load test and provided all required paperwork.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 26 November 2018
Resolved
While operating the fire main system, the fire main piping on the 04 deck had excessive leaking due to wastage in the pipe. Repair fire main piping system.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 28 February 2019
Resolved 29 January 2019
Resolution: hipyard replaced damaged piping and retested satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 November 2018
Resolved
03 panelboards were discovered missing directory cardholder with required information. Provide panelboards with proper circuit directory with descriptions noted above.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 February 2019
Resolved 29 January 2019
Resolution: Vessel searched and labeled all missing breakers on directory.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 26 November 2018
Resolved
Identification on relief valve of set pressure could not be identified nor could records be provided. Provide evidence of proper set pressure of relief valve.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 February 2019
Resolved 29 January 2019
Resolution: Replaced relief valve and set and tested it as per regulations.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 26 November 2018
Resolved
Fire damper in the galley was inoperable. Indicator light was displaying the damper was in the closed position while in the open position. Correct indicator to display proper position of damper.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 March 2019
Resolved 29 January 2019
Resolution: Replaced Microswitch in dampener controller in galley
Fire Fighting › Automatic Sprinkler System › Pump
Issued 1 March 2018
Resolved
Show operation of and provide service report for sprinkler system in accomodation spaces.
Action required: 60 - Rectify deficiencies prior to movement
Due 2 March 2018
Resolved 4 April 2018
Resolution: Hiller serviced sprinkler system and provided certificate.
Operations/Management › EPA Vessel General Permit (VGP) › 1.5.1-VGP Notice of Intent (NOI)
Issued 1 March 2018
Resolved
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 2 March 2018
Resolved 4 April 2018
Resolution: Valid NOI onboard vessel.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 1 March 2018
Resolved
Conduct adequate drills to the satisfaction of attending Marine Inspector.
Action required: 705 - Other - as specified
Due 2 March 2018
Resolved 4 April 2018
Resolution: Satisfactory drills conducted in presence of attending Marine Inspector.
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 1 March 2018
Resolved
New eye needs welded on deck to secure Hydrostatic Release unit.
Action required: 60 - Rectify deficiencies prior to movement
Due 2 March 2018
Resolved 12 March 2018
Resolution: New pad eyes were welded.
Fire Fighting › Fire Main › Valves
Issued 1 March 2018
Resolved
Replace or show proper operation of check valve and gate valve in the Fire Main.
Action required: 60 - Rectify deficiencies prior to movement
Due 2 March 2018
Resolved 12 March 2018
Resolution: New Valve installed.
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 1 March 2018
Resolved
Fuel hoses greater then 30" on emergency generator, fixed piping should be installed at next drydock.
Action required: 705 - Other - as specified
Due 14 December 2018
Resolved 29 January 2019
Communications › Alarms/Indicators › General Alarm
Issued 14 December 2016
Resolved
General alarm not audible on barge deck
Condition: Improper/Lack of Maintenance
Due 2 February 2017
Resolved 26 January 2017
Resolution: Fixed speakers, test sat.
Communications › Radio Communications › EPIRB
Issued 8 March 2016
Resolved
EPIRB installation was not in a float free arrangement due to canopy.
Action required: 705 - Other - as specified
Resolved 17 March 2016
Resolution: EPIRB was moved to a satisfactory location.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 8 March 2016
Resolved
E lighting needs to be installed in the winch room.
Action required: 705 - Other - as specified
Resolved 17 March 2016
Resolution: E lighting was added to the winch rooms.
Communications › Radio Communications › EPIRB
Issued 30 March 2015
Resolved
Provide unexpired battery for EPIRB
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 April 2015
Resolution: Deficiency cleared during MI reattendance
Lifesaving › Lifebuoys › Approval
Issued 30 March 2015
Resolved
One ring buoys waterlogged, another not approved and with inoperable waterlight
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 April 2015
Resolution: Deficiency cleared during MI reattendance
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 30 March 2015
Resolved
Restore missing sections of structural fire protection
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 April 2015
Resolution: Deficiency cleared during MI reattendance
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 30 March 2015
Resolved
Provide legible replacements for two fire control plans
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 April 2015
Resolution: Deficiency cleared during MI reattendance
Documentation › Markings/Placards › Garbage Placard
Issued 30 March 2015
Resolved
Replace MARPOL V placard with updated version
Action required: 705 - Other - as specified
Due 30 April 2015
Resolved 21 April 2015
Resolution: Deficiency cleared during MI reattendance
Deck/Cargo › Cargo Transfer (solid) › General
Issued 30 March 2015
Resolved
Hydraulic leak at swing motor IWO crane port side
Due 30 April 2015
Resolved 21 April 2015
Resolution: Deficiency cleared during MI reattendance
Fire Fighting › Fire Hoses › Location
Issued 30 March 2015
Resolved
Repair fire hose bracket at helideck
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 April 2015
Resolution: Deficiency cleared during MI reattendance
Communications › Alarms/Indicators › General Alarm
Issued 30 March 2015
Resolved
Provide operable red-flashing light for general alarm in engineering spaces.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 April 2015
Resolution: Deficiency cleared during MI reattendance
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 30 March 2015
Resolved
Provide logs of monthly EPIRB tests by next annual inspection
Action required: 705 - Other - as specified
Resolved 21 April 2015
Resolution: Deficiency cleared during MI reattendance
Electrical › Electric Generation Source (service) › Overcurrent Device
Issued 30 March 2015
Resolved
Conduct overspeed shutdown tests for both port/stbd generators
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 April 2015
Resolution: Deficiency cleared during MI reattendance
Operations/Management › Cargo Transfer/Lightering › Vessel Transfer Procedures on Hand
Issued 21 January 2014
Resolved
Post transfer proceedures with line diagram at operating stations.
Condition: Improper/Lack of Maintenance
Action required: 703 - Prior to bunkering operations
Resolved 19 February 2014
Resolution: Proceedures posted at operating locations.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 21 January 2014
Resolved
Repair structural fire protection in overhead in generator room.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2014
Resolution: Structural fire protection in the "E" gen space was replaced in kind and found adequate.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 21 January 2014
Resolved
Replace missing exhaust lagging on port generator.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2014
Resolution: Lagging has been reinstalled.
Electrical › Electric Supply System (service) › Battery Installation
Issued 21 January 2014
Resolved
Replace Battery terminals on STBD Generator. 1 Terminal is not the correct size and has a screw inserted for a spacer and the other is cracked.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 19 February 2014
Resolution: Cables have been replaced.
Communications › Alarms/Indicators › General Alarm
Issued 21 January 2014
Resolved
Repair stobe for general alarm in generator space and post sign IAW 46 CFR 97.37-7.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2014
Resolution: Strobe has been repaired and proper markings were posted.
Electrical › Electrical Distribution System (emergency) › Panelboard
Issued 21 January 2014
Resolved
Repalce missing bolts in distribution panel in E-GEN space (EP-200)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2014
Resolution: repaired.
Lifesaving › Lifebuoys › Serviceable
Issued 21 January 2014
Resolved
Replace Lifebuoys onboard. Lifebuoys onboard not serviceable 1 Missing plug and saturated with water, others missing retro, plugs and approval numbers.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2014
Resolution: Lifebouys were replaced as needed and verified to be properly marked and on board.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 21 January 2014
Resolved
Prove proper operation of and post signs at emergency escape scuttles. Escape signs were missing and multiple scuttles had gear stowed on top.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2014
Resolution: Verified escape hatches had proper operation. Signs were posted.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 21 January 2014
Resolved
Make repairs and prove propper operation of welding room vent closure. Crew was unable to close and dog.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2014
Resolution: Welding leads were removed from the vents.
Electrical › Electrical Distribution System (service) › Non-conducting Deck Covering
Issued 21 January 2014
Resolved
Place Electrical matting in the front and back of switchboards
Action required: 705 - Other - as specified
Resolved 19 February 2014
Resolution: Matting has been installed where required.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 21 January 2014
Resolved
Post IMO symbols for all lifesaving equipment IAW 46 CFR 199.178 - IMO RES A.760 (18) and Firefighting equipment IAW 97.37. Lifejacket, Lifebuoys, EPIRB, embarkation stations and Recue boat storage areas were not marked with the IMO symbols.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2014
Resolution: IMO symbols were placed at all equipment locations for fire and lifesaving equipment.
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 21 January 2014
Resolved
Lifejacket Storage container had water in the bottom.
Action required: 705 - Other - as specified
Due 21 January 2014
Resolved 21 January 2014
Resolution: Water was removed and holes drilled in the bottom.
Engineering › Diesel Engine (auxiliary) › Nozzle, Injection (fuel injection)
Issued 21 January 2014
Resolved
Missing Fuel rack brackets on outboard side of STBD generator.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2014
Resolution: Fuel rack brackets were secured and all lines were properly supported.
Fire Fighting › Fire Hoses › Diameter
Issued 16 February 2012
Resolved
Vsl had the wrong size fire hose on the outside fire stations. Vsl needs to install 2 1/2" fire hoses on the outside fire stations.
Action required: 705 - Other - as specified
Resolved 9 April 2012
Resolution: Received email from vsl rep that all the 2.5" fire hose have been installed on the outside fire stations.
Operations/Management › Drills/Instruction › Fire
Issued 15 February 2012
Resolved
Crew was not very knowledgeable about the fire drill. Crew looked unfamiliar with equipment and training. This deficiency will remain open until next inspection.
Action required: 705 - Other - as specified
Resolved 15 February 2012
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 15 February 2012
Resolved
Crew was not very knowledgeable about the man overboard drill. Crew looked unfamiliar with the FRC and equipment. Crew needs to conduct more training on drills.
Action required: 705 - Other - as specified
Resolved 15 February 2012
Electrical › Electric Generation Source (service) › Generator
Issued 8 September 2010
Resolved
VESSEL TO RETURN TO MAKE PERMANENT REPAIR[S] TO BOTH SSDG NLT 01DEC10 OR AT THE COMPLETION OF IT'S CURRENT WORK LOAD, WHICH EVER OCCURS FIRST. CAUSE OF BOTH GENERTOR FAILURES TO BE DETERMINED AND PROVIDED TO THE C.G. ONCE COMPLETE. DUE DATE IS "NOT OPERATING LATER THAN" DATE ONLY. REPAIRS MAY TAKE LONGER BASED ON GENERATOR AVAILABLITY.
Action required: 705 - Other - as specified
Due 1 December 2010
Resolved 2 May 2011
Resolution: Repairs completed and all tests conducted with A.B.S. surveyor witnessing, under the provisions of NVIC 10-92.