Inspection history · 32
15 January 2026
Administrative Inspection · Internal Structural Exam · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8267640
4 November 2024
MARPOL Annex I Examination · Annual Inspection · Administrative Inspection · MARPOL Annex VI Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8029309
27 July 2024
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7970552
25 October 2023
COI Inspection · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7821110
1 August 2023
Deficiency Check · COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7654478
8 May 2023
Drydock Extension · Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7654475
9 August 2022
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7497552
29 July 2021
Periodic Inspection · Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7271997
14 October 2020
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7077036
15 August 2019
MARPOL Annex I Examination · MARPOL Annex VI Survey · COI Inspection · MTSA Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7118105
6 January 2019
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6606302
11 October 2018
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6559309
8 August 2018
Internal Structural Exam · Cargo Tank Internal · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6449691
6 August 2018
MARPOL Annex I Examination · MARPOL Annex VI Survey · MTSA Verification · COI Inspection · MARPOL Annex II Examination · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6490945
23 May 2018
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6421240
16 October 2017
Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6288302
9 August 2016
MTSA Verification · Deficiency Check · Periodic Inspection · MARPOL Annex I Examination · MARPOL Annex VI Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5967171
28 July 2016
Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5955173
6 January 2016
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5791544
16 January 2015
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5054110
16 October 2014
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 5006019
5 December 2013
Hull Examination · Drydock Exam · COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4751526
11 December 2012
Annual Inspection · MARPOL Annex I Examination · MARPOL Annex VI Survey · MTSA Verification · MARPOL Annex II Examination · SIP Inspection/Audit
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4500050
20 October 2011
Internal Structural Exam · Periodic Inspection · SIP Inspection/Audit
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4172158
29 November 2010
SIP Initial Entry · Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3900549
19 November 2010
Annual Inspection · Administrative Inspection · SIP Inspection/Audit · MARPOL Annex II Examination · MTSA Verification · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3894968
12 January 2010
Annual Inspection · MARPOL Annex II Examination · MARPOL Annex VI Survey · MTSA Verification · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3658488
12 March 2009
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3432820
12 March 2009
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3432925
9 March 2009
ISM Oversight
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3431008
10 December 2008
Type not recorded
No type recorded · Sector Key West · USCG Southeast District (CGD-SE) · Activity 3377923
16 October 2008
Construction Oversight · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3346185
01 - Certificates & Documentation › 011 - Ships Certificates › International Oil Pollution Prevention (IOPP)
Issued 4 November 2024
Resolved
Each U.S. oil tanker of 150 gross tons and above and each other U.S. ship of 400 gross tons and above; that engages in voyages to ports or off-shore terminals under the jurisdiction of other parties to MARPOL 73/78 must have on board a valid International Oil Pollution Prevention (IOPP) Certificate. Barges's IOPP has expired and as such, the barge is restricted to domestic voyages.
Action required: 705 - Other - as specified
Resolved 19 December 2024
Resolution: IOPP Issued during COI Inspection.
01 - Certificates & Documentation › 011 - Ships Certificates › International Air Pollution Certificate (IAPP)
Issued 4 November 2024
Resolved
Every ship of 400 gross tons and above shall be subject to the surveys specified below: A renewal survey at intervals specified by the Administration, but not exceeding five years. Barge's IAPP has expired and as such the barge is restricted to domestic voyages.
Action required: 705 - Other - as specified
Resolved 19 December 2024
Resolution: Issued IAPP during COI inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 1 August 2023
Resolved
Each vessel must carry lifebuoys approved under approval series 160.150. Grab lines for 05 lifebuoys were found deteriorated and no longer serviceable, and 01 self igniting light attachment line was also found deteriorated. Repair or replace lifebouys and replace line for light.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2023
Resolved 10 August 2023
Resolution: Received picture evidence of new grablines and light
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 1 August 2023
Resolved
No marine employer shall engage or employ any individual to serve as a crew member unless the individual passes a chemical test for dangerous drugs for that employer. Marine employer did not have a list of employed individuals that have successfully completed a chemical test prior to employment. Provide updated list of crew members enrolled in consortium.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2023
Resolved 2 August 2023
Resolution: Received MIS report and crew member list.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Volatile organic compounds in tankers
Issued 1 August 2023
Resolved
Any tanker carrying crude oil shall have on board and implement a VOC management plan approved by the administration. Vessel does not have a approved VOC plan and is authorized per its CA to carry crude.
MARPOL VI/15.6
705- Prior to carrying crude oil
Action required: 705 - Other - as specified
Resolved 4 March 2025
Resolution: MSC approved VOC plan on board.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 11 October 2018
Resolved
Vessel representative reported a hole in the port rake approximately two feet below the deck. Vessel is be to be attended by a marine chemist, submit a repair proposal plan for review and approval, and conduct repairs to the satisfaction of the attending CG Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 15 October 2018
Resolution: Received the following from company: Repair proposal plan, marin chemist certificate on 12 October. On 15 October received verification that all welding was complete and final weld testing was conducted. All was done to the satisifaction of ABS.Def cleare
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 August 2018
Resolved
Ring lifebuoys have lifelines attached to grablines. Reattach lifelines to body of ring lifebuoys.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2018
Resolved 7 August 2018
Resolution: Ring lifebuoy lifelines reattached to body of lifebuoys.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 August 2018
Resolved
Ring lifebuoy grablines deteriorated. Renew grablines to satisfaction of attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2018
Resolved 7 August 2018
Resolution: Ring lifebuoy grablines renewed to satisfaction of attending CG Marine Inspector.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 August 2018
Resolved
Ground detected within the number one cargo pump engine lube oil heater outlet receptacle. Repair and test ground detection on the 110V panel within the machinery space to the satisfaction of attending Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2018
Resolved 7 August 2018
Resolution: Ground detector to 110V machinery space panel repaired and tested to the satisfaction of attending CG Marine Inspector.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 16 October 2017
Resolved
Provide documentation for PV Valve bench test prior to next dry dock.
Action required: 705 - Other - as specified
Due 30 November 2018
Resolved 7 August 2018
Resolution: Barge installed and bench tested new PV valves to the satisfaction of the attending CG Marine Inspector.
Construction/Loadline › Structures › Manhole
Issued 16 October 2017
Resolved
Replace gaskets on the following hatches: #1 port forward void space, #2 port forward void space and #4 port void space.
Action required: 705 - Other - as specified
Due 24 November 2017
Resolved 9 August 2018
Resolution: Completed credit drydock 23 July 2018 with worklist items cleared.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 9 August 2016
Resolved
The 120V distribution panel in the generator room has a ground detection device that is rated for 208 to 600 VAC & therefore will not work in a 120V system. Replace with suitable ground detection. 46 CFR 111.05-21(d)
Action required: 705 - Other - as specified
Due 23 August 2016
Resolved 12 August 2016
Resolution: New ground detetion was installed and operating properly.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 9 August 2016
Resolved
Both prime mover shafts to the pumps are not vapor tight, isolating the hazardous and non hazardous zones. Replace the bellows to make vapor tight. 46 CFR 32.50-1
Action required: 705 - Other - as specified
Due 16 August 2016
Resolved 12 August 2016
Resolution: New vapor tight bellows were installed on both cargo pumps.
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 August 2016
Resolved
Freezer in the generator room is hooked up using an extension cord. Remove the extension cord. 46 CFR 111.60-13(b)
Action required: 705 - Other - as specified
Due 16 August 2016
Resolved 12 August 2016
Resolution: Freezer has been hard wired into the electrical system and no longer uses an extension cord.
Engineering › Diesel Engine (auxiliary) › Blower, Centrifugal
Issued 9 August 2016
Resolved
The exhaust side of the turbos on the cargo pump prime movers are not properly insulated. Provide proper insulation. 46 CFR 58.10-10, 46 CFR 58.10-5(d), and ABYC P-1
Action required: 705 - Other - as specified
Due 23 August 2016
Resolved 12 August 2016
Resolution: Lagging has been added to both generator's exhaust turbos.
Electrical › Electrical Distribution System (service) › Neutral Ground
Issued 9 August 2016
Resolved
Dryer and stove contain a floating neutral. Vessel must isolate the floating neutral with a transformer. The dryer and stove must be on separate transformers off of the distribution panel or be replaced with suitable appliances. 46CFR111.05-15(a)
Action required: 705 - Other - as specified
Due 23 August 2016
Resolved 12 August 2016
Resolution: Vessel had already previously fixed this issue and individual transformers were installed. Vessel reps and crew are now aware that the appropriate equipment is on board.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 9 August 2016
Resolved
The 240 panel in the house has an opening where a circuit breaker has been removed. Blank-off this opening w/ a suitable blank. 46 CFR 111.01-1(a)(2)
Action required: 705 - Other - as specified
Due 23 August 2016
Resolved 12 August 2016
Resolution: Appropriate blanks have been installed over openings on panel.
Construction/Loadline › Structures › Cofferdam
Issued 28 July 2016
Resolved
See Scanned 835 worklist for other defs identified during ISE.
Action required: 705 - Other - as specified
Due 30 November 2018
Resolved 9 August 2018
Resolution: Completed credit drydock 23 July 2018 with completed worklist items.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 5 December 2013
Resolved
Vessel must prove correct name on the Certificate of Documentation prior to loading cargo.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 December 2013
Resolution: Vessel has provided updated Certificate of Documentation reflecting name change from GCS 235 to DOUBLE SKIN (DS) 41.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 11 December 2012
Resolved
Monthly fire and boat drills need to be logged in official log book monthly. Results and details noted in ICR to be logged as well.
Due 11 December 2012
Resolved 11 December 2012
Resolution: CR generated for deficiency.
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 11 December 2012
Resolved
Paint locker needs to be drained and cleaned in the stbd containment.
Due 11 December 2012
Resolved 11 December 2012
Resolution: CR generated for deficiency and completed.
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 11 December 2012
Resolved
Excessive paint needs to be stored on the deck of the paint locker or removed.
Due 11 December 2012
Resolved 11 December 2012
Resolution: CR generated for deficiency and completed.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 11 December 2012
Resolved
Need to start logging monthly EPRIB tests.
Due 11 December 2012
Resolved 11 December 2012
Resolution: CR generated for deficiency and completed.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 11 December 2012
Resolved
Lifebuoys need to be re-stenciled.
Due 11 December 2012
Resolved 11 December 2012
Resolution: CR generated for deficiency and completed.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 20 October 2011
Resolved
Port void #5 between bay 5 & 6 from forward, between SSS 3-6 from the top are buckled. Vessel must crop and renew as marked and discussed with vessel rep.
Action required: 705 - Other - as specified
Due 3 November 2011
Resolved 1 November 2011
Resolution: Received ABS report # NY2058388_E stating the affected swash bulkhead plating was cropped out and inserted with a (2) 3/8" thick plates for an overall area of 120" X 42", all work was examined during repairs and upon completion, found satisfactory.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 20 October 2011
Resolved
Port Void #4: between bay 4&5 from forward, between SSS 5-6 are buckled. Vessel must crop and renew as marked and discussed with vessel rep.
Action required: 705 - Other - as specified
Due 3 November 2011
Resolved 1 November 2011
Resolution: Received ABS report # NY2058388_E stating the affected swash bulkhead plating was cropped out and inserted with a (1) 45" X 21" X 3/8" plate, all work was examined during repairs and upon completion, found satisfactory.
Documentation › Logs/Records › Bunker Delivery Notes/Samples
Issued 12 January 2010
Resolved
Vsl is currently not in compliance with MARPOL Annex VI regulations. Vsl is restricted to domestic voyages only until compliance is proven.
Due 5 November 2013
Resolved 8 March 2011
Resolution: Vessel is in compliance with MARPOL Annex VI Regs.