Records from 2009 to 2025. Most recent: inspection, 21 October 2025.
Inspection history · 32
21 October 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8256193
18 November 2024
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8020275
28 August 2024
Drydock Exam · Administrative Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7989830
22 April 2024
Bulk Liquid Transfer Monitor
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7899550
11 October 2023
MTSA Verification · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7806957
1 March 2023
Periodic Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7643673
10 August 2022
Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7529973
4 October 2021
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7326529
21 October 2020
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7071925
19 May 2020
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6956068
21 January 2020
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6892850
16 July 2019
COI Inspection · Administrative Inspection · Examination of Repairs · Deficiency Check · In-Service Inspection · Drydock Exam · Internal Structural Exam · Cargo Tank Internal · MARPOL Annex VI Survey · MARPOL Annex I Examination · MARPOL Annex II Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6752378
22 February 2019
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6630531
31 October 2018
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6571702
21 August 2018
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6518643
22 August 2017
Periodic Inspection · MTSA Verification · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6248019
5 August 2016
MARPOL Annex I Examination · MARPOL Annex VI Survey · Annual Inspection · MARPOL Annex II Examination · MTSA Verification · Ballast Water Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5963031
4 September 2015
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5234660
10 August 2015
MARPOL Annex VI Survey · Ballast Water Examination · Deficiency Check · MTSA Verification · MARPOL Annex I Examination · Annual Inspection · MARPOL Annex II Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5211494
7 September 2014
MTSA Verification · MARPOL Annex II Examination · MARPOL Annex I Examination · Deficiency Check · MARPOL Annex VI Survey · COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4977283
25 July 2014
Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4933567
6 September 2013
MTSA Verification · MARPOL Annex IV Survey · Deficiency Check · MARPOL Annex VI Survey · MARPOL Annex I Examination · MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4707058
8 August 2012
MTSA Verification · Periodic Inspection · MARPOL Annex VI Survey · MARPOL Annex II Examination · Internal Structural Exam · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4404638
2 May 2012
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4300243
8 February 2012
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4240772
14 October 2011
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4167769
25 August 2011
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4138615
13 December 2010
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3917417
14 October 2010
Annual Inspection · MARPOL Annex VI Survey · MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3865913
20 April 2010
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3722339
4 March 2010
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3689890
18 June 2009
Initial Certification · MARPOL Annex VI Survey · Administrative Inspection · Construction Oversight · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3548362
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 21 October 2020
Resolved
Portside liferaft painter line improperly run, preventing float-free launching. Fix liferaft painter line arrangement and prove float-free operation. 46 CFR 199.130(c)(7)
Action required: 10 - Deficiency Rectified
Due 21 October 2020
Resolved 21 October 2020
Resolution: Crew properly rigged painter and float free arrangement.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 October 2020
Resolved
Inoperable ring lifebuoy waterlights: forward centerline ring linebuoy (expired battery), port fwd ring linebuoy, and stbd ring linebuoy (expired battery). Repair and prove proper operation. 46 CFR 199.70
Action required: 10 - Deficiency Rectified
Due 21 October 2020
Resolved 21 October 2020
Resolution: Batteries replaced and/or light repaired. All waterlights tested satisfactory.
12 - Dangerous Goods › N/A - No Subsystem › Other (tankers)
Issued 21 October 2020
Resolved
Flame screen improperly installed on vacuum side of pressure/vacuum relief valve at #3 port cargo tank. Replace flame screen and prove proper operation. 46 CFR 39.2011
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 November 2020
Resolved 27 October 2020
Resolution: Flame screen properly installed.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 21 October 2020
Resolved
Entry errors in the Oil Record Book Part 1 and Part 2. Part 1 included cargo operations entries which must be logged in Part 2. Make correction entries. 33 CFR 151.25
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 November 2020
Resolved 27 October 2020
Resolution: Crew made correction entries in both ORB Part 1 and Part 2.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 October 2020
Resolved
Excess dust and debris in interior of space heaters located in accommodation spaces presenting a fire hazard. Clean equipment and prove proper operation. 46 CFR 111.01-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 November 2020
Resolved 27 October 2020
Resolution: Crew cleaned heaters.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 October 2020
Resolved
Battery tray for general alarm equipment contained water. Dry and clean battery installation. 46 CFR 111.15-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 November 2020
Resolved 27 October 2020
Resolution: Battery tray cleaned and dry.
02 - Structural Conditions › N/A - No Subsystem › Spaces in cargo areas
Issued 18 December 2019
Resolved
On all tank vessels the cargo pumps shall be designed and installed to minimize the danger of sparking. Special care shall be exercised in the design of packing spaces in order to secure ample depth and accessibility of glands. Where cargo pump shafts pierce gastight bulkheads, stuffing boxes with readily accessible gastight glands shall be provided. Bulkhead penetrations for cargo pump shafts are sealed with flexible rubber tubing with hose clamps. The current arrangement does not meet the requirement for stuffing boxes with gastight glands. - 46CFR32.50–1
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 January 2020
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 18 December 2019
Resolved
Each liferaft or group of liferafts must be arranged for float-free launching. The arrangement must ensure that the liferaft or liferafts, when released and inflated, are not dragged under by the sinking vessel. Painter line was wrapped around liferaft securing straps jeopardizing float-free launching. - 46CFR199.130(c)(7)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 January 2020
Resolution: Vessel representative corrected deficiency, inspected satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 December 2019
Resolved
The respective piping systems installed on ships and barges shall have the necessary pumps, valves, regulation valves, safety valves, relief valves, flanges, fittings, pressure gages, liquid level indicators, thermometers, etc., for safe and efficient operation of the vessel. Fuel leak discovered on #2 generator fuel filter due to missing o-ring. Corrected on the spot. - 46CFR56.01-1
Action required: 10 - Deficiency Rectified
Resolved 18 December 2019
Resolution: Operator replaced o-ring, operational test conducted, no leak. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 December 2019
Resolved
The respective piping systems installed on ships and barges shall have the necessary pumps, valves, regulation valves, safety valves, relief valves, flanges, fittings, pressure gages, liquid level indicators, thermometers, etc., for safe and efficient operation of the vessel. Flexible fitting on exhaust for #1 and #2 cargo pump prime movers were removed for maintenance and reinstalled incorrectly. Corrected on the spot. - 46CFR56.01-1
Action required: 10 - Deficiency Rectified
Resolved 18 December 2019
Resolution: Operator reinstalled flex fitting correctly, prime movers tested. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 December 2019
Resolved
At least one-half the total number of lifebuoys on the vessel must each be fitted with a self-igniting light approved under approval series 161.010. Port quarter and port bow self-igniting lights are inoperable. - 46CFR199.70(a)(3)(ii)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 January 2020
Resolution: Vessel representative replaced batteries in both port waterlights, tested sat.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 18 December 2019
Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 0.5 inch diameter and is at least 1 inch long must be located at the top of the flange face, midway between boltholes, and in line with the bolthole pattern. Studs missing on the port and starboard side aft vapor lines. - 46CFR39.2001(j)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 January 2020
Resolution: Vessel representative welded studs as required, inspected satisfactory.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 31 October 2018
Resolved
Repaint loadlines and draft marks.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 November 2018
Resolved 1 November 2018
Resolution: Loadline and draft marks painted.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 31 October 2018
Resolved
Prior to loading, show proper operation of high level alarm audible horn.
Action required: 705 - Other - as specified
Due 31 October 2018
Resolved 1 November 2018
Resolution: High level alarm repaired and properly working.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 31 October 2018
Resolved
Show proper operation of pressure vessel pressure relief valve.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 November 2018
Resolved 1 November 2018
Resolution: Pressure relief valve properly working.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 31 October 2018
Resolved
Prior to utilizing vapor control system provide vapor tightness certificate and position pin in vapor return line.
Action required: 705 - Other - as specified
Due 31 October 2018
Resolved 21 January 2020
Resolution: Received vapor tight certificate.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 21 August 2018
Resolved
Vessel's regular compliment of two, 6 person life rafts have been removed for required servicing. One, eight person life raft has been temporarily installed for a period not to exceed 14 days. An abandon ship drill and familiarization brief, regarding the single life raft, must be conducted for any and all maintenance personnel authorized by the vessel's COI to be on board. The accompanying tow vessel shall be in attendance or made-up to the barge at all times.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2018
Resolved 17 September 2018
Resolution: Received confirmation that the regular compliment of two 6 person life rafts have been installed on the vessel.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 10 August 2015
Resolved
120V panel has ground detector rated for 208-600V. Provide appropriately rated ground detection to satisfaction of CGMI.
Condition: Improper Installation
Due 10 September 2015
Resolved 22 August 2015
Resolution: Witnessed satisfactory test of ground system rated for 110V
Lifesaving › Line-Throwing Appliances › Projectiles
Issued 10 August 2015
Resolved
Provide 03 line throwing guns to satisfaction of [name withheld] only has 01 line throwing gun.
Condition: Improper Installation
Due 17 August 2015
Resolved 17 August 2015
Resolution: Received receipt for 03 additional line throwing guns.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pressure/Vacuum Relief Valve
Issued 5 September 2013
Resolved
Cargo tank #3 starboard P/V valve must be repaired or replaced in kind prior to loading. Prior To Loading Cargo into #3 Starboard.
Due 30 September 2013
Resolved 12 September 2013
Resolution: Vessel replaced cargo tank #3 starboard P/V valve. Exercised the pressure and vacuum capabilities. Test Satisfactory.
Documentation › Manuals/Policy Documentation › Procedures and Arrangements Manual (NLS)
Issued 5 September 2013
Resolved
Vessel needs to have a approved P&A Manual onboard.
Due 6 October 2013
Resolved 12 September 2013
Resolution: Vessel company provided a P&A Manual to place onboard the vessel.
Documentation › Logs/Records › Bunker Delivery Notes/Samples
Issued 5 September 2013
Resolved
Vessel must keep bunker delivery notes and bunker samples IAW regulations.
Due 6 October 2013
Resolved 7 October 2013
Resolution: Cleared defs, however special note was added stating that during the next inspection, the items need to be inspected thouroughly.
Documentation › Manuals/Policy Documentation › Tank Vessel Loading Information
Issued 5 September 2013
Resolved
Vessel must submit VOC managment plan. Vessel prohibited from carrying crude oil internationally.
Due 15 October 2013
Resolved 10 October 2013
Resolution: Recieved request from vessel rep requested ammendment of COI to prohibit the carrage of crude oil internationally. Def cleared.
Construction/Loadline › Hull › Transverse Frame
Issued 8 August 2012
Resolved
4S Void, 3 frames from aft bulkhead, between 2nd and 3rd longs, crop and renew.
Action required: 705 - Other - as specified
Due 8 October 2012
Resolved 13 September 2012
Resolution: 4S Void, 3 frames from aft bulkhead, between 2nd and 3rd longs, Have been crop and renew to the satisfaction of USCG.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 14 October 2010
Resolved
Prior to onloading and discharging cargo, provide cargo header and cargo hose test paperwork. Provide vapor tightness test documentation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 November 2010
Resolution: Recieved email from Vessel rep with third party test certificates for the cargo header, cargo hose, and vapor tightness test. Cleared CG-835 deficiency.