Records from 1987 to 2026. Most recent: inspection, 15 June 2026.
Inspection history · 249
15 June 2026
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8405497
29 May 2026
COI Inspection · Administrative Inspection · Vessel Attendance
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8377454
7 July 2025
Examination of Repairs · Vessel Attendance · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8178292
9 October 2024
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8026936
3 September 2024
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7990372
12 August 2024
Re-Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7961964
16 May 2024
Administrative Inspection · Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7913536
15 February 2024
Re-Inspection · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7865888
13 November 2023
MTSA Verification · Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7822695
14 August 2023
Administrative Inspection · MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7767978
16 May 2023
MTSA Verification · Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7689707
17 February 2023
Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7638389
10 November 2022
Deficiency Check · Examination of Repairs · COI Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7592528
15 August 2022
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7534173
10 May 2022
Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7447669
24 February 2022
Deficiency Check · Re-Inspection · Administrative Inspection · Examination of Repairs · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7401438
12 November 2021
Deficiency Check · Administrative Inspection · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7349838
5 May 2021
In-Service Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7195085
2 May 2021
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7225816
6 April 2021
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7168915
24 March 2021
Re-Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7156683
18 February 2021
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7142183
4 January 2021
Administrative Inspection · Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7115486
1 January 2021
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7119811
1 January 2021
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7120151
30 December 2020
Damage Survey · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7117715
25 December 2020
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7117711
11 September 2020
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7056198
5 August 2020
In-Service Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7020823
25 July 2020
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7023374
20 July 2020
In-Service Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7011653
9 July 2020
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7001860
14 May 2020
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6953356
21 June 2019
Examination of Repairs · Internal Structural Exam · Drydock Exam · Administrative Inspection · COI Inspection · Construction Oversight · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6720875
13 September 2018
Administrative Inspection · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6539528
22 March 2018
Examination of Repairs · Deficiency Check · MTSA Verification · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6374273
10 January 2018
MTSA Verification · Examination of Repairs · Re-Inspection · Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6335727
21 September 2017
Re-Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6272728
29 June 2017
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6195919
21 March 2017
Administrative Inspection · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6108583
3 January 2017
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6065102
21 September 2016
Deficiency Check · Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6011502
18 June 2016
Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5916553
22 April 2016
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5860365
22 March 2016
Administrative Inspection · COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5837992
2 February 2016
Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5808913
29 December 2015
Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5788440
20 October 2015
Administrative Inspection · Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5758957
17 October 2014
In-Service Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5009393
15 May 2012
COI Inspection · DAPI Audit
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4307766
28 February 2012
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4240924
16 January 2012
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4226863
16 January 2012
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4231789
4 January 2012
Damage Survey · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4218615
4 January 2012
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4226278
30 December 2011
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4217554
20 December 2011
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4211479
20 December 2011
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4211562
23 August 2011
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4132947
25 February 2011
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3953999
15 February 2011
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3951570
30 November 2010
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3902121
4 November 2010
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3884993
8 October 2010
Examination of Repairs · In-Service Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3868220
5 May 2009
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3468182
26 April 2009
Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3460996
25 April 2009
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3465222
5 February 2009
COI Inspection · Deficiency Check · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3412723
22 December 2008
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3385837
11 December 2008
Permit to Proceed
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3378178
26 November 2008
Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3370445
22 October 2008
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3349550
8 October 2008
Examination of Repairs · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3340768
3 October 2008
Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3340228
29 July 2008
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3283244
11 July 2008
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3366444
16 June 2008
Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3238554
3 June 2008
Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3257600
27 May 2008
Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3219392
1 April 2008
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3176451
1 April 2008
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3210740
30 January 2008
Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3138819
12 December 2007
Administrative Inspection · Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3130745
23 October 2007
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3114315
9 October 2007
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3037941
20 July 2007
Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3001895
5 June 2007
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2952378
4 June 2007
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2966883
1 June 2007
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2948519
11 May 2007
Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2927722
2 May 2007
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2920934
5 April 2007
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2909566
1 April 2007
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2909403
1 February 2007
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2865164
18 August 2006
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2755176
8 August 2006
Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2800837
11 May 2006
Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2674773
8 May 2006
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2738764
9 February 2006
COI Inspection · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2582178
9 November 2005
Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2567181
16 August 2005
Re-Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2513947
17 May 2005
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2383779
6 May 2005
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2355380
22 April 2005
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2342360
29 March 2005
Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2322202
11 February 2005
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2290545
7 December 2004
Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2255183
4 August 2004
MTSA Verification · Hull Examination · Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2155669
19 February 2004
COI Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2016712
24 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978840
18 November 2003
Quarterly Examination · Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1964359
18 August 2003
Quarterly Examination
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1880254
15 July 2003
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1855104
30 May 2003
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1805725
13 May 2003
Quarterly Examination
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1796788
5 February 2003
Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1740881
2 January 2003
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1725176
6 November 2002
Deficiency Check · Quarterly Examination
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1706971
25 October 2002
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1695891
25 September 2002
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1685752
24 July 2002
Deficiency Check · Quarterly Examination
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1652674
3 June 2002
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1625361
25 May 2002
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1622662
1 May 2002
Deficiency Check · Quarterly Examination
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1611160
26 February 2002
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1489347
5 February 2002
COI Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1488579
8 January 2002
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1476439
8 January 2002
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1482016
28 November 2001
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1431128
30 October 2001
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 772273
10 October 2001
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1467336
21 September 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1073834
14 September 2001
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1461437
24 June 2001
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 81500
6 June 2001
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1450649
19 April 2001
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1061788
23 March 2001
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1060897
21 February 2001
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1395660
10 January 2001
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1057502
28 September 2000
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1055138
28 August 2000
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1053960
17 August 2000
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 165380
26 July 2000
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 656482
6 June 2000
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 819828
12 May 2000
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 165038
10 May 2000
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1384422
19 April 2000
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 50390
10 April 2000
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1049231
7 April 2000
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 67757
5 April 2000
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 82738
5 April 2000
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 92893
12 March 2000
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 101167
2 March 2000
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1408486
26 January 2000
Deficiency Check · Inclining Experiment
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1433556
27 December 1999
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 656486
12 November 1999
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 280395
1 October 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1348466
24 May 1999
Damage Survey · Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1442825
1 April 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1415162
23 March 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1402813
9 March 1999
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1375672
24 February 1999
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1049539
24 February 1999
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1378541
9 December 1998
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 807453
27 October 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 808816
24 September 1998
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 799504
9 September 1998
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1472611
14 July 1998
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 27497
9 July 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 794034
9 June 1998
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1472517
12 March 1998
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1470141
17 December 1997
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1416609
22 October 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 180278
22 October 1997
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1112802
16 September 1997
Deficiency Check · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1431849
12 June 1997
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6573
11 June 1997
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1465318
16 April 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1100403
11 March 1997
Re-Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1418096
8 February 1997
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 48086
17 January 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 10600
16 December 1996
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1460043
7 December 1996
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 160389
17 September 1996
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1383332
29 August 1996
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 936962
28 August 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 39653
19 July 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 177165
16 July 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1383289
25 June 1996
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 656485
25 June 1996
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1422706
15 June 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 103722
10 June 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1425753
13 March 1996
Re-Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1456342
14 December 1995
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1402149
27 September 1995
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1422566
14 September 1995
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1412857
28 June 1995
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1387810
28 March 1995
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1377371
29 December 1994
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1417726
22 November 1994
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1177198
14 October 1994
Damage Survey · Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1429953
9 October 1994
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 61871
29 September 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1363107
22 September 1994
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1443505
9 August 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 862926
1 August 1994
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 863459
28 July 1994
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1172716
29 June 1994
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1367084
29 March 1994
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1431335
22 December 1993
Re-Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1358262
2 December 1993
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 225349
29 September 1993
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1429768
12 November 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 961049
3 November 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1251074
3 September 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 934324
3 August 1992
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1268860
2 June 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 946451
6 May 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 953689
7 March 1992
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1317886
6 February 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1267230
4 November 1991
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 939689
5 August 1991
Deficiency Check · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 935992
21 May 1991
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1229249
14 February 1991
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 912224
15 November 1990
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1240023
27 August 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1215933
14 August 1990
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1223673
5 July 1990
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1240393
21 June 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1239051
23 May 1990
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 916568
5 April 1990
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1216763
6 March 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1211345
21 February 1990
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1235491
9 February 1990
Damage Survey · Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 910634
29 December 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1230527
16 November 1989
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 916456
5 October 1989
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1019115
14 September 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1344939
7 September 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1203684
16 August 1989
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1197909
18 April 1989
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1195588
12 April 1989
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 895832
16 December 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 902185
16 November 1988
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1204388
18 August 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1345554
9 June 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1031886
6 May 1988
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1344660
7 April 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1341629
17 November 1987
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1019237
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 12 August 2024
Resolved
A vessel equipped with fixed pitch propellers must have on the navigating bridge and at the engine room control station a propeller speed and direction indicator for each shaft. Starboard side port engine control LCD screen is inoperable. Replace screen unit.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2024
Resolved 3 September 2024
Resolution: LCD screen was repaired
08 - Alarms › N/A - No Subsystem › General alarm
Issued 12 August 2024
Resolved
Where the general emergency alarm signal cannot be heard over the background noise, there must be a red-flashing light or rotating beacon, in addition to the general emergency alarm signal that has sufficient intensity above the background lighting that would alert personnel in the space and is activated whenever the general emergency alarm signal in the space are activated. General alarm light located in the engine room was found inoperable. Repair or replace light.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2024
Resolved 3 September 2024
Resolution: Light was replaced
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 August 2024
Resolved
Each battery charger enclosure must meet 46 CFR 111.01-9 Each charger must be suitable for the size and type of battery installation that it serves. Battery charger for the starboard main diesel engine was found inoperable allowing the starboard engine to secure itself upon loss of power. Repair or replace battery charger.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2024
Resolved 20 August 2024
Resolution: Reported complete.
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 12 August 2024
Resolved
An audible and a visible alarm must activate in the pilothouse upon failure of the electric power to the control system of any steering gear; failure of that power to the power unit of any steering gear; or occurrence of a low oil level in any oil reservoir of a hydraulic, power-operated steering-gear system. Vessels #2 steering gear alarms where found to going off intermittently for unknown reasons. Trouble shoot and repair alarm circuit.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2024
Resolved 3 September 2024
Resolution: Steering gear alarm was properly repaired
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 12 August 2024
Resolved
Each navigation light system must meet the following: Dual light sources. Each self-propelled vessel must have duplicate light sources for the side, masthead, and stern lights. Port side light and anchor light secondary light sources are inoperative. Renew secondary lights for port and all-around white anchor lighting.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2024
Resolved 20 August 2024
Resolution: Reported complete.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 August 2024
Resolved
Each vessel must carry lifebuoys approved under 46 CFR 160.050. The grab line shall be 3/8-inch diameter polyethylene, polypropylene, or other suitable buoyant type synthetic material having a minimum breaking strength of 1,350 pounds. The life buoy grab line on the starboard side is deteriorated. Replace grab line.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2024
Resolved 20 August 2024
Resolution: Reported complete.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 12 August 2024
Resolved
A card of instructions giving a clear summary of the radiotelephone distress procedure must be securely securely mounted and displayed in full view of the principal operating position. Emergency broadcast placard missing. Replace emergency distress broadcast placard. 47 CFR 80.868
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2024
Resolved 20 August 2024
Resolution: Reported complete.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 12 August 2024
Resolved
All valves and closing appliances, or other mechanisms which may be required to be operated for damage control purposes in case of an emergency shall be conspicuously marked with letters at least 1 inch high. The placards for fire dampers on main deck were faded and not legible. Replace fire damper placards.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2024
Resolved 20 August 2024
Resolution: Reported complete.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 August 2024
Resolved
Each battery clearly marked with an expiration date and used in an item of survival equipment must be replaced during the annual inspection if the expiration date has passed. The self-igniting lights on the ring buoys were expired. Replace batteries.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2024
Resolved 20 August 2024
Resolution: Reported complete.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 13 November 2023
Resolved
Approved fire extinguishing systems must be installed in internal combustion engine machinery spaces. Timer delay bottle on system was approved/rated to actuate supply valve at 30 seconds (in accordance with onboard procedures). The timer delay actuated at 25 seconds. Replace timer bottle so that actuation occurs at rated time stamped on the bottle (with an allowance of +20%/-0% of stamped time). With a requirement of a 30 second delay, the bottle should actuate between 30 and 36 seconds.
Action required: 60 - Rectify deficiencies prior to movement
Due 13 November 2023
Resolved 16 November 2023
Resolution: CO2 Time Delay activated at 33 seconds, within allowable limits.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 13 November 2023
Resolved
All alarm panels must be continuously powered. Battery back-up for engineering alarms was not operating.
Action required: 60 - Rectify deficiencies prior to movement
Due 13 November 2023
Resolved 15 November 2023
Resolution: Panel and alarm repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 November 2023
Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. The wheel house utilizes an extension cord and power strip to power 5 different appliances creating a potential fire hazard. Provide permanently installed outlets to power appliances that are permanently utilized (i.e. microwave, refrigerator, fan, radio/battery chargers).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 December 2023
Resolved 15 December 2023
Resolution: Permanent electrical outlets installed.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 13 November 2023
Resolved
Illuminated exit signs are required and must be installed in accordance with subchapter J (Electrical Engineering Regulations) of this chapter. The "EXIT" sign in the passenger lounge (aft) illumination is inoperable.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 December 2023
Resolved 15 December 2023
Resolution: Replaced new-in-kind.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 13 November 2023
Resolved
Each lighting fixture must meet UL 1598A or IEC 60092-306 standards. Light in starboard engine room was missing cover. Repair cover.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 December 2023
Resolved 15 November 2023
Resolution: Repaired
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 13 November 2023
Resolved
Emergency lighting must be provided to allow crew to find their way to survival craft and embarkation stations. Emergency lights on the aft vehicle deck were not operating. Repair emergency lights.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 December 2023
Resolved 15 November 2023
Resolution: Repaired
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 November 2022
Resolved
The minimum system monitoring requirement for reduction gears requires a high lube oil temperature alarm. During testing, high lube oil temp alarm for port reduction gear failed. Repair alarm.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 November 2022
Resolution: Alarm repaired and tested within parameters.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 November 2022
Resolved
The minimum system monitoring requirement for propulsion control air is to have an alarm for low control air pressure. Alarm for low control air pressure only activated at 50 PSI, when it should activate at 90-100 PSI. Repair control air alarm.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 November 2022
Resolved 29 November 2022
Resolution: Revised PSTPs, alarm no longer applicable
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 14 November 2022
Resolved
Each lighting fixture must meet UL 1598A or IEC 60092-306 standards. Light in starboard engine room was missing cover. Repair cover.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 November 2022
Resolved 2 December 2022
Resolution: Cover repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 14 November 2022
Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed hazards, such as rotating machinery. Covers were missing over shaft couplers to main engines. Replace covers in way of main engine shaft couplings for both main engines.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 November 2022
Resolved 2 December 2022
Resolution: Guards installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 November 2022
Resolved
Each life jacket aboard vessel must be approved under approval series 160.155, 160.176, or 160.177. Additionally, each life jacket container must be marked with the proper quantity of life jackets within. 2 adult size life jackets were found unserviceable. Unserviceable life jackets were in excess of required carriage amount. Replace unserviceable life jackets or change label on container to match actual number within (if unserviceable life jackets will not be replaced).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 November 2022
Resolved 2 December 2022
Resolution: Lifejackets replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 May 2022
Resolved
The material, design, workmanship, and arrangement must be equivalent to ABS standards for engineering systems. The support bearing on the port shaft has a loose top cap. Repair bearing.
Action required: 10 - Deficiency Rectified
Resolved 10 May 2022
Resolution: Repaired prior to completion of inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 May 2022
Resolved
Each lifebuoy self igniting light must be of the approved type and operational. Repair life buoy light on starboard side.
Action required: 10 - Deficiency Rectified
Resolved 10 May 2022
Resolution: Repaired prior to completion of inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 10 May 2022
Resolved
Each vessel must carry a life jacket that meets required approvals for each person on board. Replace 03 unserviceable adult life jackets.
Action required: 10 - Deficiency Rectified
Resolved 10 May 2022
Resolution: Repaired prior to completion of inspection.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 10 May 2022
Resolved
All portable fire fighting equipment shall be maintained in accordance with NFPA 10. Exterior fire extinguishers were issing service tags. Ensure all extinguishers are properly serviced.
Action required: 10 - Deficiency Rectified
Resolved 10 May 2022
Resolution: Repaired prior to completion of inspection.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 24 February 2022
Resolved
A vessel required to have Type I or II subdivision must be watertight below the bulkhead deck. Additionally, bilges must be kept to a minimum content at all times. Starboard rudder tube/through hull fitting is leaking approximately 0.25 gallons per minute when vessel is underway. Also, pump excess water out of steering space.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2022
Resolution: Leak repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 February 2022
Resolved
The material, design, workmanship, and arrangement must be equivalent to ABS standards for engineering systems. The water pump on the starboard main engine leaks from the seal. Repair water pump.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 March 2022
Resolved 10 March 2022
Resolution: Leak repaired.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 February 2022
Resolved
Emergency lighting must be provided to allow crew to find their way to survival craft and embarkation stations. Emergency lights on the aft vehicle deck were not operating. Repair emergency lights.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 March 2022
Resolved 10 March 2022
Resolution: Lighting repaired.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 24 February 2022
Resolved
The operator of each self-propelled vessel 12 meters or more in length shall carry on board a copy of Inland Navigation Rules. Ensure a current copy of Inland Navigation Rules is placed in the wheelhouse.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 March 2022
Resolved 10 March 2022
Resolution: Nav rules placed on bridge.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 November 2021
Resolved
Approved fire extinguishing systems must be installed in internal combustion engine machinery spaces. Timer delay bottle on system was approved/rated to actuate supply valve at 30 seconds (in accordance with onboard procedures), but timer delay actuated at 40 seconds. replace timer bottle so that actuation occurs at rated time stamped on the bottle (with an allowance of +20%/-0% of stamped time). With a requirement of a 30 second delay, the bottle should actuate between 30 and 30 seconds.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 December 2021
Resolution: Time delay functioned properly
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 November 2021
Resolved
Approved portable and semi-portable extinguishers must be installed in accordance with table 76.50-10(a). Service or replace two fire extinguishers in the engine
room and the one extinguisher in the passenger space.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 December 2021
Resolution: Extinguishers replaced
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 15 November 2021
Resolved
Each machinery space must be ventilated to ensure that, when machinery is running at full power, an adequate supply of air is maintained for operation of machinery and comfort of crew. Motor is inoperable for main supply ventilation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2021
Resolved 23 December 2021
Resolution: Vent fan repaired
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 15 November 2021
Resolved
Gears, couplings, and all machinery capable of injuring personnel shall be provided with adequate covers or guards. Shaft of the potable water pump must be fully guarded from accidental contact with personnel.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2021
Resolved 23 December 2021
Resolution: Guard repaired
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 November 2021
Resolved
Each switchboard must meet the requirements of IEEE code
45-2002. Switchboard rear access is not locked.
Provide lock for access.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2021
Resolved 23 December 2021
Resolution: Access has been locked
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 November 2021
Resolved
The material, design, workmanship, and arrangement must be equivalent to ABS standards for engineering systems. The dump valve on the port main engine starter leaks excessive air when engine is started. Repair dump valve.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2021
Resolved 23 December 2021
Resolution: Dump valve repaired
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 15 November 2021
Resolved
Fire pumps shall be fitted with a pressure gauge on the discharge side of the pumps. The installed pressure gauge was not working. Repair/replace gauge.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2021
Resolved 23 December 2021
Resolution: Gauge replaced
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 15 November 2021
Resolved
Emergency lighting must be provided to allow crew to find their way to survival craft and embarkation stations. Emergency lights on forward starboard vehicle deck and inside the CO2 room were not operating. Repair emergency lights.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2021
Resolved 23 December 2021
Resolution: Emergency lighting repaired
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 November 2021
Resolved
Electric installations on vessels must ensure maintenance of services necessary for safety under all conditions. Water was discovered filling the battery box aft of the wheelhouse. Remove water and ensure safe installation of electrical equipment.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2021
Resolved 23 December 2021
Resolution: Water removed from battery box
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 May 2021
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules. While transiting ICW vessel experienced vibrations. Upon third party diver inspection, damage to both propellers was identified. Conduct appropriate permanent repairs and operational testing to the satisfaction of the attending Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 26 October 2021
Resolution: The shaft was replaced with a new shaft. Witnessed satisfactory installation of the new shaft.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Ship's occupational safety and health policies and programmes
Issued 24 March 2021
Resolved
46 CFR 16.401 The employer shall provide an Employee Assistance Program (EAP) for all crew members [name withheld] must include an education program. The EAP education program is not displayed and distributed in accordance with 46 CFR 16.401(a). Implement an EAP education program in accordance with 46 CFR 16.401(a).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2021
Resolved 13 April 2021
Resolution: EAP information was posted in crew area as well as on the bridge.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 24 March 2021
Resolved
46 CFR 78.37-5 The master or person in charge of a vessel that is not required by 46 U.S.C 11301 to have an official logbook, shall maintain, on board, an unofficial logbook or record in any form desired for the purposes of making entries therein as required by law or regulation in this subchapter. Watertight door operation, loudspeaker system, steering gear, whistle, and means of communication, emergency lighting and power systems are not being logged in accordance with 78.37-5. The Department of Transportation for the State of Louisiana must develop a corrective action plan for maintaining required log entries.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2021
Resolved 13 April 2021
Resolution: Port Engineer provided masters a comprehensive list of things to be recorded and a record to document the items.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 March 2021
Resolved
46 CFR 112.15-5(a) The emergency lighting power loads listed in paragraphs (b)-(l) shall be arranged so that they can be energized from the final source. All emergency lighting in the steering compartment, shaft alley, and all lights in the engine room except for one, did not illuminate when the power from the generator was secured. Repair all engine room emergency lighting to the satisfaction of the Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2021
Resolved 13 April 2021
Resolution: All E lights were tested satisfactorily
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 March 2021
Resolved
46 CFR 111.15-25(a) An overload protective device shall be placed in each battery conductor, except that engine cranking batteries need not be protected against overload. Both 12 volt battery banks located port and starboard aft corners of the engine room have several conductors attached with no overload protection. Provide fuses for all wires that are not for engine cranking to the satisfaction of the Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2021
Resolved 15 November 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 March 2021
Resolved
46 CFR 111.15-25(a)An overload protective device shall be placed in each battery conductor, except that engine cranking batteries need not be protected against overload. Both generator starting battery banks have auxiliary wires attached other than cranking leads that do not have overload protection. Provide fuses for all wires that are not for engine cranking to the satisfaction of the Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2021
Resolved 15 November 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 March 2021
Resolved
46 CFR 111.30-159b)(7)Adequate means for ground detection shall be provided on the ship service generator and distribution switchboard for ship’s main power system. The center bulb for 240 volt ground detection is burned out. Replace bulb in kind.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2021
Resolved 13 April 2021
Resolution: Ground detection system repaired
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 March 2021
Resolved
46 CFR 78.47-30(a)Each hand portable fire extinguisher shall be marked with a number and the location where stowed shall be marked with a corresponding number at least 1 /2 inch high. Four extinguishers outside of the superstructure and all of the engine room fire extinguishers were not numbered to their corresponding location. Mark portable extinguishers to their corresponding location to the satisfaction of the attending CG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2021
Resolved 13 April 2021
Resolution: All extinguishers were properly marked with the corresponding station number.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 March 2021
Resolved
46 CFR 112.15-5(a)46 CFR 112.15-1(h)Emergency lighting power loads shall be arranged so that they can be energized by the final source. The starboard aft and aft door “Exit” signs on the main deck superstructure leading to the open deck did not illuminate during the emergency power test. Repair or replace “Exit” signs to illuminate on emergency power to the satisfaction of the attending CG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2021
Resolved 13 April 2021
Resolution: All illuminated exit signs were tested satisfactorily.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 March 2021
Resolved
46 CFR 112.15-5(a) 46 CFR 112.15-1(h)Emergency lighting power loads shall be arranged so that they can be energized by the final source. The port forward and starboard aft exterior emergency lighting did not energize during the emergency power test. Repair or replace the emergency lighting to the satisfaction of the attending CG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2021
Resolved 13 April 2021
Resolution: Emergency lighting systems tested satisfactorily
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 March 2021
Resolved
46 CFR 112.05-10(d)Emergency lights shall be marked with a letter “E” of at least a ½ inch in height. The port forward exterior emergency light was not marked with an “E” and lighting in the E/R is marked with an "E" that is not emergency lighting or is not near a light fixture. Ensure all emergency lights are marked with a letter “E” and remove unnecessary "E" designations to the satisfaction of the attending CG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2021
Resolved 13 April 2021
Resolution: All E lights were properly marked.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 February 2021
Resolved
In addition to the emergency power sources required under part 112 of this chapter, each self-propelled vessel and each mobile offshore drilling unit must have at least two electric generating sources. Port generator is inoperable. Repair generator to the satisfaction of the Marine Inspector prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 February 2021
Resolution: Electrician replaced voltage regulator on port generator.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 4 January 2021
Resolved
Each lifejacket must be marked with Type I retro-reflective material approved under approval series 164.018. The arrangement of the retro-reflective material must meet IMO Resolution A.658(16). 29 of the 156 lifejackets on board retro-reflective tape was found worn and lifejackets need to be replaced. Vessel will reduce the amount of passengers allowed on board to 125 until lifejackets are replaced to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 January 2021
Resolved 9 February 2021
Resolution: Lifejackets were replaced.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 4 January 2021
Resolved
All general alarm bells shall be identified by red lettering at least 1/2 inch high: “GENERAL ALARM—WHEN BELL RINGS GO TO YOUR STATION.”. The general alarm located forward of the bridge near the main deck is not marked with the required red lettering.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 January 2021
Resolved 14 January 2021
Resolution: General alarm bell was properly marked.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 4 January 2021
Resolved
Each hand portable fire extinguisher shall be marked with a number and the location where stowed shall be marked with a corresponding number at least 1/2 inch high. portable fire extinguishers in the E/R were found mislabeled. Vessel will correctly label the fire extinguishers IAW their fire control plan to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 January 2021
Resolved 14 January 2021
Resolution: All portable fire extinguishers and the respective locations were properly marked.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 4 January 2021
Resolved
The inspector shall examine all accessible parts of the vessel's hull, machinery, and equipment to be assured that it is in a satisfactory condition. Vessels visual and audible alarm for the steering gear space emergency escape hatch was found inoperable. Vessel will fix to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 January 2021
Resolved 9 February 2021
Resolution: Alarm operated properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 30 December 2020
Resolved
An inspection either general or partial depending upon the circumstances shall be made whenever any important repairs or alterations are undertaken. The second ship service generator starter has failed rendering the generator inoperable. Upon completion of repairs (installation of new starter) an inspection and testing of the generator shall be done to the satisfaction of a Coast Guard Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 January 2021
Resolution: Witnessed satisfactory test of new generator starter.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 25 December 2020
Resolved
An inspection either general or partial depending upon the circumstances shall be made whenever any important repairs or alterations are undertaken. The second ship service generator starter has failed rendering the generator inoperable. Upon completion of repairs (installation of new starter) an inspection and testing of the generator shall be done to the satisfaction of a Coast Guard Marine Inspector.
Action required: 10 - Deficiency Rectified
Resolved 25 December 2020
Resolution: Port Engineer installed new pully on both SSGs and tested satisfactorily
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 11 September 2020
Resolved
Each pump shall be capable of delivering water simultaneously from the two highest outlets at a Pitot tube pressure of approximately 50 p. s. i. Both fire pumps are only producing 20 PSI. Repair pumps to produce 50 PSI.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 September 2020
Resolution: Witnessed proper operation of both fire pumps.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 5 August 2020
Resolved
Distribution panels of the switchboard type shall be completely enclosed or otherwise protected against accidental contact and unauthorized operation. The 120V distribution panel in the aft of pilothouse has broken enclosure locking mechanism and the front of the panel is missing all but 2 securing screws. Repair distribution panel cover and locking door mechanism.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 11 September 2020
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 5 August 2020
Resolved
Each item of lifesaving equipment carried on board the vessel in addition to those required by this part must be accepted by the cognizant OCMI for use on the vessel. All three blades of the rescue boat propeller are damaged with chunks of leading edge missing. Replace rescue boat propeller.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 11 September 2020
08 - Alarms › N/A - No Subsystem › General alarm
Issued 5 August 2020
Resolved
Each general emergency alarm signal must be marked ‘‘GENERAL ALARM—WHEN EMERGENCY ALARM SIGNAL RINGS GO TO YOUR STATION’’ in red letters at least 1/2 inch high. The general alarm bells on the main deck exterior were not marked. Mark as appropriate.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 11 September 2020
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 August 2020
Resolved
Each lifejacket must be marked in block capital letters with the name of the vessel. Two lifejackets were found to be marked with a different vessel name. Properly mark the lifejackets with the appropriate vessel name.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 11 September 2020
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 August 2020
Resolved
Each lifebuoy stowage position must be marked with either the words ‘‘LIFEBUOY’’ or ‘‘LIFE BUOY’’, or with the appropriate symbol from IMO Resolution A.760(18). The stowage location for lifebuoys stowed on the main deck were not legible. Mark lifebuoy stowage locations appropriately.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 11 September 2020
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 August 2020
Resolved
46 CFR 199.70(a) requires that each vessel carry lifebuoys approved under approval series 160.150. Amount of retro-reflective material on each lifebuoy was not of sufficient quantity or sufficient condition. Replace retro-reflective material to ensure a sufficient width (approx. 5cm) is applied around or on both sides of the body at four evenly spaced points.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 11 September 2020
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 5 August 2020
Resolved
Liferaft Hydrostatic Release: Each liferaft or group of liferafts must be arranged for float-free launching. The arrangement must ensure that the liferaft or liferafts, when released and inflated, are not dragged under by the sinking vessel. A hydrostatic release unit (HRU) used in a float-free arrangement must be approved under approval series 160.162. The manufacturer's instruction on the installed disposable HRU for the vessel's survival craft requires an expiration date of two years after installation date. The expiration date required to be marked on the HRU was not marked and the vessel rep had no objective evidence of when it was installed. Install a new HRU and mark the expiration date in accordance with the manufacturer's instructions.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 11 September 2020
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 5 August 2020
Resolved
An emergency means of communication required by this subpart must— (1) Be comprised of either fixed or portable equipment; and (2) Provide common talking means of two-way voice communication and calling among the navigating bridge, emergency control stations, muster stations, embarkation stations, and other strategic positions listed in § 113.30–5. The crew does not carry a portable means of two way communication and the call button on the comms boxes located on main deck (exterior) do not operate to call the bridge. Prover proper operation of all call boxes onboard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 11 September 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 July 2020
Resolved
The vessel is restricted to Bollinger shipyard and is not allowed to get underway until a complete root cause analysis is conducted o nthe entire steering system. This analysis is to include all mechanical, Hyd. And electrical components of the entire system. With all parameters tested, measured, observed, in the aforementioned sections of the steering system. A detailed report of the condition of the system and its serviceability for the future.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 July 2020
Resolution: Gap analysis recieved in form of steering technician report. Deficiency cleared. [name withheld].
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 July 2020
Resolved
When alteration or repair of machinery becomes necessary, the work shall be done under the cognizance of the Officer in Charge Marine Inspection. The port shaft cooper bearing failed rendering the port main engine inoperable. Repair to the satisfaction of attending USCG Marine Inspector prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 July 2020
Resolved 24 July 2020
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 7 May 2020
Resolved
Onboard training, musters, and drills must be in accordance with Subchapter W (Lifesaving Appliances and Arrangements) of this chapter. Drills were not witnessed during COI due to availability of personnel during COVID-19. Drills to be conducted at permanent operating location prior to carriage of Passengers to satisfaction of CG Marine Inspector. 46CFR78.17-50 701 c
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 May 2020
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 7 May 2020
Resolved
All lifesaving appliances and arrangements on passenger vessels must be in accordance with Subchapter W. Observed 16 adult and 4 child lifejackets missing. Place on board in proper location prior to carriage of Passengers to satisfaction of CG Marine Inspector. 46CFR70.28-1 701 c
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 May 2020
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 7 May 2020
Resolved
Observed several emergency lights inoperable. Repair as designed prior to carriage of Passengers to satisfaction of CG Marine Inspectors. 46CFR78.71-45 701 c
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 May 2020
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 21 June 2019
Resolved
Several original documents not available for posting/review during COI due to COVID-19 travel ban. Documentation to be verified at permanent op location prior to carriage of passengers to satisfaction of CG. 701 c
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 May 2020
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 22 March 2018
Resolved
Provide onboard valid Radio Safety Certificate IAW 47 CFR 80.1001(a)&(b).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Resolution: Valid copy provided onboard.
Lifesaving › Inflatable Buoyant Apparatus › Weak Link
Issued 22 March 2018
Resolved
Install valid Hydrostatic release for port IBA IAW 46 CFR 199.130(c)(7).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Resolution: Installed new hydro-release.
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 22 March 2018
Resolved
Provide extension handle for hand brake on anchor winch. IAW 46 CFR 77.07-10.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Resolution: Extension piece added to handle.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 22 March 2018
Resolved
Perform Annual maintenance for all on-board fire extinguishers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Resolution: Annaul service performed.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 22 March 2018
Resolved
Provide on-board approved first aid kit IAW 46 CFR 160.041 (b).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Resolution: New approved first-aid kits onboard.
Electrical › Electric Supply System (service) › Cable
Issued 22 March 2018
Resolved
Repair or renew power wire for Rescue Boat winch motor IAW 46 CFR 111.60-5.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Resolution: New wire conductor installed.
Pollution Prevention/Response › Prevention Equipment › Means of Removal from within Coaming
Issued 22 March 2018
Resolved
Remove all excess oil & water from under all machinery in engine room IAW 46 CFR 78.17-25.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Resolution: Oily water removed from engineroom bilges.
Documentation › Markings/Placards › Garbage Placard
Issued 22 March 2018
Resolved
Update posted MARPOL placard with the latest edition.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Resolution: Latest edition posted.
Construction/Loadline › Hull › Longitudinal Frame
Issued 22 March 2018
Resolved
Make permanent repairs to the fractured side shell longitudinal stbd side steering compartment. Location was pointed out to the master on-board at time of inspection IAW 46 CFR 72.01-15.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Resolution: Satisfactory repairs made to the damaged frames.
Construction/Loadline › Hull › Weld
Issued 22 March 2018
Resolved
Clean and preserve weld seem fwd of stbd rudder assembly Location was pointed out to the master on-board at time of inspection, IAW 46 CFR 72.01-15
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Resolution: Welds cleaned re-capped and preserved against further wastage.
Electrical › Electric Supply System (service) › Cable
Issued 22 March 2018
Resolved
Power wire for stbd rudder angle indicator has pulled out from the stuffing tube. Clean up wire and re-install into stuffing tube housing. IAW 46 CFR 111.60-5.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Resolution: Wired cleaned up and installed properly.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 22 March 2018
Resolved
Straighten 4th up from the bottom ladder step on stbd E/R ladder. Location was pointed out to the master on-board at time of inspection. IAW 46 CFR 72.05-20(n).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Resolution: Step removed and straightened.
Construction/Loadline › Hull › Weld
Issued 22 March 2018
Resolved
Clean and preserve spots in the fwd ballast tank. Location was pointed out to the master on-board at time of inspection. IAW 46 CFR 72.01-15.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Resolution: All identified welds cleaned and preserved.
Lifesaving › Inflatable Buoyant Apparatus › Capacity
Issued 22 March 2018
Resolved
Provide onboard primary lifesaving for 147 total persons. Vessel has onboard one 100 person IBA, vessel is restricted to 96 passengers and 4 crew until additional IBA is installed. IAW 46 CFR 199.201(b)(1).
Action required: 705 - Other - as specified
Resolved 18 September 2018
Resolution: Vessel survival craft capacity reduced to reflect alternative standard outlined in 46 CFR 199.630(a) and (g).
Operations/Management › Vessel Activity › Underway
Issued 11 January 2018
Resolved
Vessel is restricted from carrying passengers for hire until the problem with the Port MDE engine throttle control is corrected and tested in the presence of the local attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2018
Construction/Loadline › Hull › Hull Plating
Issued 11 January 2018
Resolved
Make permanent repairs to the approx 2"-3" hole in the Port bow half round rub bar and test in the presence of the attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 February 2018
Resolution: Cropped and renwed approx 1' x 2' section of bow knuckle. Air tested satisfactory.
Electrical › Electric Supply System (service) › Battery Installation
Issued 11 January 2018
Resolved
Tighten negative battery terminals on both batteries for the Port MDE and repair wire insulation on attached wires IAW 46 CFR 111.
Action required: 705 - Other - as specified
Resolved 22 May 2018
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 11 January 2018
Resolved
Clean surrounding area of all Dirt, Grease, Oil and Water in the aft steering compartment.
Action required: 705 - Other - as specified
Resolved 22 May 2018
Engineering › Steering Gear System › Ram Seal
Issued 29 June 2017
Resolved
Repair or Replace port steering ram due to excessive leaking hydraulic fluid, and then prove the proper operation to the attending marine inspector, IAW 46 CFR 58.25-20.
Action required: 705 - Other - as specified
Due 14 July 2017
Resolved 14 July 2017
Resolution: Steering ram replaced with re-built one, all tested satisfactory.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 3 January 2017
Resolved
Vessel may only carry 65 adults and 12 children until 147 adult, 20 child life jackets are onboard to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 31 January 2017
Resolution: Verified 147 adult and 20 child lifejackets are onboard and in servicable condition.
Lifesaving › Launching Appliances › Falls
Issued 21 September 2016
Resolved
Renew rescue boat davit cable wire and provide a quick-disconnect for detaching the lifting bridal. Exsiting cable is crushed and fraying and the quick-disconnect is missing.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 September 2016
Resolved 30 September 2016
Resolution: Fall was renewed with new Amsteel Blue synthetic rope.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 21 September 2016
Resolved
Provide cover for 120 VAC outlet in crew space, IAW 46 CFR 111.81-1(c).
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 September 2016
Resolved 30 September 2016
Resolution: New outlet cover installed.
Engineering › Lubricating Oil Service System › Piping
Issued 23 March 2016
Resolved
Provide safety guard for L/O tank sight glass.
Condition: Improper/Lack of Maintenance
Due 15 April 2016
Resolved 22 April 2016
Resolution: Guard installed
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 23 March 2016
Resolved
Prove proper operation of the STBD R/G lube oil pressure alarm.
Condition: Improper/Lack of Maintenance
Due 15 April 2016
Resolved 22 April 2016
Resolution: Witness alarm at 28 PSI
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 20 October 2015
Resolved
Hydrostatic release was installed upside down
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 October 2015
Resolution: State ferry personnel corrected immediately
Electrical › Electric Generation Source (service) › Generator
Issued 4 January 2012
Resolved
01/04/12: Vsl experienced lost of electrical power of stbd generator at 1350 on 04JAN in the vicinity of MM 136, Reserve Ferry Crossing. Company reported changing out battery charger with negative results.
Action required: 705 - Other - as specified
Due 4 January 2012
Resolved 12 January 2012
Resolution: John Deere troubleshooting uncovered a list of problems all traced to the electronic fuel pump and injectors. Replaced all and tested sat. Operators to continue to minitor closely for any signs of failure. As standard practice after repairs.
Engineering › Diesel Engine (auxiliary) › Pump, High Pressure (fuel injection)
Issued 3 January 2012
Resolved
Vsl experienced lost of electrical power of stbd generator at 1300 on 30DEC in the vicinity of MM 136, Reserve Ferry Crossing. Repair and provide a tech. report.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2012
Resolved 3 January 2012
Resolution: Vsl replaced fuel lift pump and test ran engine under a load. Provided a tech. report. All tests conducted satisfactory.
Electrical › Electric Generation Source (service) › Generator
Issued 20 December 2011
Resolved
Vsl experienced loss of power to the stbd generator.
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 January 2012
Resolved 22 December 2011
Resolution: Vsl replaced charger and conducted underway tests. All tests conducted satisfactory.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 23 August 2011
Resolved
Repair "E" light on aft pilot house deck
Due 23 September 2011
Resolved 29 September 2011
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 23 August 2011
Resolved
Free up closures devices on vent stack closures.
Due 23 September 2011
Resolved 29 September 2011
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 23 August 2011
Resolved
Replace fire extinguisher at stbd bow deck.
Due 23 September 2011
Resolved 29 September 2011
Electrical › Lighting (emergency) › Lighting Fixture
Issued 23 August 2011
Resolved
Replace aging lens cover on rescue boat platform at the aft vehicle deck
Due 23 September 2011
Resolved 29 September 2011
Electrical › Electrical Distribution System (service) › Cable
Issued 23 August 2011
Resolved
Repair electrical cable on rescue boat winch
Due 23 September 2011
Resolved 29 September 2011
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 23 August 2011
Resolved
Secure refer in crew accommodation area
Due 23 September 2011
Resolved 29 September 2011
Electrical › Lighting (service) › Lighting Fixture
Issued 23 August 2011
Resolved
Repair overhead lighting in engine room portside.
Due 23 September 2011
Resolved 29 September 2011
Stability › Watertight Integrity › General
Issued 23 August 2011
Resolved
Clean knife edges and replace door gaskets on both watertight doors. Perform chalk test.
Due 23 September 2011
Resolved 29 September 2011
Engineering › Compressed Air System (control) › Piping
Issued 23 August 2011
Resolved
Replace relief valve on main air compressor piping in the engine room
Due 23 September 2011
Resolved 29 September 2011
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 15 February 2011
Resolved
Provide adequate storage for pilot house life jackets
Due 15 March 2011
Resolved 31 March 2011
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 15 February 2011
Resolved
Replace fire extinguisher in rescue boat.
Due 15 March 2011
Resolved 15 February 2011
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 15 February 2011
Resolved
Repair NAVLT panel, mast head primary is extinguished.
Due 15 March 2011
Resolved 15 February 2011
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 15 February 2011
Resolved
Remove gear stowed under engine room console
Due 15 March 2011
Resolved 31 March 2011
Electrical › Electric Supply System (service) › Cable
Issued 15 February 2011
Resolved
Remove terminated wiring (back to source) on the stbd MDE battery charger.
Due 15 March 2011
Resolved 31 March 2011
Communications › Internal Communications System › Sound-powered Telephone
Issued 30 November 2010
Resolved
Repair sound powered phone in pilot house
Due 30 December 2010
Resolved 11 January 2011
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 30 November 2010
Resolved
Remove life jacket literature from old locker in stbd passenger area
Due 30 December 2010
Resolved 11 January 2011
Electrical › Lighting (emergency) › Lighting Fixture
Issued 30 November 2010
Resolved
Repair "E" light on stbd aft superstructure
Due 30 December 2010
Resolved 11 January 2011
Electrical › Electric Supply System (service) › Battery Installation
Issued 30 November 2010
Resolved
Secure covers for main engine battery boxes
Due 30 December 2010
Resolved 11 January 2011
Construction/Loadline › Hull › Hull Plating
Issued 26 April 2009
Resolved
Make permanent repairs to holed stbd f/o tank. Once leak is found, present repair proposal to the local [name withheld] f/o tank to remain empty with x-conn secured. F/o supply for main engines/ gensets provided by the port f/o tank.
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 May 2009
Resolved 4 May 2009
Resolution: Repairs and Air testing all sat.
Lifesaving › Rescue Boat › Carriage Requirement
Issued 5 February 2009
Resolved
Provide additional portable radio's for rescue boat operations.
Action required: 705 - Other - as specified
Due 12 March 2009
Resolved 11 March 2009
Deck/Cargo › Mooring/Anchoring › Winch
Issued 5 February 2009
Resolved
Provide portable drill for anchor windlass.
Action required: 705 - Other - as specified
Due 12 March 2009
Resolved 16 February 2009
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 26 November 2008
Resolved
Prove proper operation of the main engine lube oil pressure shutdowns.
Due 26 December 2008
Resolved 12 February 2009
Engineering › Steering Gear System › Rudder Stock
Issued 3 October 2008
Resolved
Make repairs and prove proper operation of the steering gear system to the satisfaction of the attending CG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 October 2008
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 3 June 2008
Resolved
Repair exhaust leaks on the stbd main engine.
Due 3 July 2008
Resolved 29 July 2008
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 3 June 2008
Resolved
Repair/replace port and stbd vehicle gates.
Due 3 July 2008
Resolved 29 July 2008
Engineering › Steering Gear System › Rudder Stock
Issued 15 May 2008
Resolved
Make repairs to port and stbd rudders. Prove proper operation of the same.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 May 2008
Resolution: New bushings and double nutted bolts installed.
Stability › Unintentional Flooding › General
Issued 30 January 2008
Resolved
Replace gaskets on all void access watertight hatches.
Action required: 705 - Other - as specified
Resolved 29 February 2008
Engineering › Fuel Oil Service System › Valve
Issued 30 January 2008
Resolved
Prove operation of the remote fuel oil cut out valves.
Action required: 705 - Other - as specified
Resolved 29 February 2008
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 30 January 2008
Resolved
Prove operation of the main engine and genset over speed shutdowns.
Action required: 705 - Other - as specified
Resolved 29 February 2008
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 12 December 2007
Resolved
Replace first aid kit.
Due 12 January 2008
Resolved 29 February 2008
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 12 December 2007
Resolved
Replace line on life rings.
Due 12 January 2008
Resolved 29 February 2008
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 12 December 2007
Resolved
Replace life ring lights.
Due 12 January 2008
Resolved 29 February 2008
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 12 December 2007
Resolved
Readjust/replace fire extinguisher brackets as needed.
Due 12 January 2008
Resolved 29 February 2008
Engineering › Steering Gear System › Linkage
Issued 12 December 2007
Resolved
Replace jockey bar supports in aft steering.
Due 12 February 2008
Resolved 29 February 2008
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 9 October 2007
Resolved
Consolidate and renew CO2 operating instructions.
Due 9 November 2007
Resolved 23 October 2007
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 9 October 2007
Resolved
Clean E/R bilges of excess oil and debris.
Due 9 November 2007
Resolved 23 October 2007
Stability › Watertight Integrity › General
Issued 9 October 2007
Resolved
Repair dogs on all watertight doors. Provide wrench for both door sides.
Due 9 November 2007
Resolved 23 October 2007
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 9 October 2007
Resolved
Provide mechanism to aid in the weighing of the bottles.
Due 9 November 2007
Resolved 23 October 2007
Engineering › Reduction Gearing/Clutches › Gear
Issued 1 June 2007
Resolved
Determine cause of recent reduction gear casualties to stbd shaft. Report findings and repair proposal to the local [name withheld] prepared to prove shaft straightness and engine-reduction gear-shaft alignment.
Due 1 July 2007
Resolved 11 July 2007
Engineering › Diesel Engine (propulsion-reduction gear) › Valve
Issued 2 May 2007
Resolved
valve
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 May 2007
Resolved 2 May 2007
Engineering › Diesel Engine (propulsion-reduction gear) › Piston
Issued 2 May 2007
Resolved
turbo
Action required: 705 - Other - as specified
Due 2 May 2007
Resolved 2 May 2007
Communications › Alarms/Indicators › Propeller Revolutions Rate Indicator
Issued 8 May 2006
Resolved
Repair both port shaft tachometers on pilot house console.
Action required: 705 - Other - as specified
Resolved 20 June 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 8 May 2006
Resolved
Repair worn wiring on all deck floodlights on the vehicle deck.
Action required: 705 - Other - as specified
Resolved 20 June 2006
Accommodation/Occupational Safety › Heating › Electric Air Heating Equipment
Issued 9 February 2006
Resolved
Replace cover on htr/ ac unit in crew accom space.
Due 9 March 2006
Resolved 7 April 2006
Stability › Unintentional Flooding › General
Issued 9 February 2006
Resolved
Replace gaskets on void access covers.
Due 9 March 2006
Resolved 7 April 2006
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 9 February 2006
Resolved
Label child and adult locations on all life jacket lockers.
Due 9 March 2006
Resolved 7 April 2006
Electrical › Electric Generation Source (service) › Circuit Breaker
Issued 9 February 2006
Resolved
Prove proper operation of both generator under voltage trips.
Due 9 March 2006
Resolved 7 April 2006
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 9 November 2005
Resolved
Stencil vessel name and replace reflective tape on all life rings.
Action required: 705 - Other - as specified
Resolved 11 November 2005
Lifesaving › Buoyant Apparatus › Serviceable
Issued 9 November 2005
Resolved
Service both IBA's.
Action required: 705 - Other - as specified
Resolved 11 November 2005
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 17 May 2005
Resolved
Replace or make repairs to upper air receiver in engine room.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 June 2005
Electrical › Lighting (emergency) › Lighting Fixture
Issued 17 May 2005
Resolved
Repair emergency lighting in C02 locker.
Action required: 705 - Other - as specified
Resolved 7 June 2005
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 17 May 2005
Resolved
Replace batteries in all life ring lights with the screw post type.
Action required: 705 - Other - as specified
Resolved 7 June 2005
Engineering › Fuel Oil Service System › Piping
Issued 17 May 2005
Resolved
Repair f/o leak on port main engine.
Action required: 705 - Other - as specified
Resolved 7 June 2005
Engineering › Lubricating Oil Service System › Hose
Issued 17 May 2005
Resolved
Replace lube oil hoses on both main engine lube oil coolers.
Action required: 705 - Other - as specified
Resolved 7 June 2005
Electrical › Electrical Distribution System (service) › Shore Connection Box
Issued 17 May 2005
Resolved
Replace broken shore tie receptacle.
Action required: 705 - Other - as specified
Resolved 7 June 2005
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 11 February 2005
Resolved
Label all stack openings "Close in the event of Engine room Fire".
Action required: 705 - Other - as specified
Resolved 15 March 2005
Accommodation/Occupational Safety › Washroom/Toilet › Washbasin
Issued 11 February 2005
Resolved
Replace sink drain piping in passenger head.
Action required: 705 - Other - as specified
Resolved 15 March 2005
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 11 February 2005
Resolved
Update all engine room CO2 operating instructions.
Action required: 705 - Other - as specified
Resolved 15 March 2005
Electrical › Electrical Distribution System (service) › Cable
Issued 11 February 2005
Resolved
Remove back to source, the dead end cables in the engine room console.
Action required: 705 - Other - as specified
Resolved 15 March 2005
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 11 February 2005
Resolved
Re-label escape routes from shaft alley and rudder compartment.
Action required: 705 - Other - as specified
Resolved 15 March 2005
Engineering › Steering Gear System › Rudder Stock
Issued 11 February 2005
Resolved
Tighten packing on port rudder post. Remove excess water from aft steering.
Action required: 705 - Other - as specified
Resolved 15 March 2005
Engineering › Steering Gear System › Rudder
Issued 7 December 2004
Resolved
Starboard rudder shaft has severed approximately 8" above the top edge. Rudder has been recovered with the aid of the safety cable and a crane. Vessel is to proceed to dry dock for repairs.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 24 December 2004
Resolved 13 December 2004
Resolution: Rudder shaft repalced and rudder re-attached.
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 August 2004
Resolved
Provide Coast Guard approved Load Analysis and Electrical drawing for installation of new generators and electrical equipment.
Action required: 705 - Other - as specified
Due 5 December 2004
Resolved 15 March 2005
Electrical › Electric Generation Source (service) › Generator
Issued 4 August 2004
Resolved
Provide documentation new generators meet the temperature rating requirements of 46 CFR 111.01-15 or derate them accordingly.
Action required: 705 - Other - as specified
Due 5 December 2004
Resolved 5 November 2004
Resolution: Vsl rep provided data plate from generator supplier indicating 50deg C rating.
Construction/Loadline › Structures
Issued 18 November 2003
Resolved
Repair rain water leaks in pilot house overhead. LEGACY COMPONENT DESC: Superstructure
Due 18 December 2003
Resolved 18 December 2003
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 18 November 2003
Resolved
Replace expired portable fire extinguisher in pilot house.
Due 18 December 2003
Resolved 18 November 2003
Resolution: Corrected.
Electrical › Electrical Distribution System (service)
Issued 18 November 2003
Resolved
Provide proper wire connection on upper A/C unit in pilot house. LEGACY COMPONENT DESC: Wiring
Due 18 December 2003
Resolved 18 December 2003
Electrical › Electrical Distribution System (service)
Issued 18 November 2003
Resolved
Replace wire feed for galley oven. LEGACY COMPONENT DESC: Wiring
Due 18 December 2003
Resolved 18 December 2003
Electrical › Electrical Distribution System (service)
Issued 18 November 2003
Resolved
Rewire feed for thermostat on galley space heater. LEGACY COMPONENT DESC: Wiring
Due 18 December 2003
Resolved 18 December 2003
Electrical › Electrical Distribution System (service)
Issued 18 November 2003
Resolved
Repair wiring to water cooler and space heater in crew accom space. LEGACY COMPONENT DESC: Wiring
Due 18 December 2003
Resolved 18 December 2003
Electrical › Electrical Distribution System (service)
Issued 18 November 2003
Resolved
Remove override circuit on air compressor controller. LEGACY COMPONENT DESC: Wiring
Due 18 December 2003
Resolved 18 December 2003
Engineering › Fuel Oil Service System
Issued 18 November 2003
Resolved
Repair minor F/O leak on return line at the stbd main engine. LEGACY COMPONENT DESC: Piping
Due 18 December 2003
Resolved 18 December 2003
Electrical › Electric Generation Source (service)
Issued 18 November 2003
Resolved
Clean both generator sets. LEGACY COMPONENT DESC: Metallic Enclosure/Frame
Action required: 705 - Other - as specified
Resolved 18 December 2003
Resolution: Cleaned.
Electrical › Electrical Distribution System (service)
Issued 18 November 2003
Resolved
Repair ground detection (120 volt ckt) on main swbd. LEGACY COMPONENT DESC: Ground Detection
Due 18 December 2003
Resolved 18 December 2003
Engineering › Shafting/Propeller Arrangements › Stern Tube
Issued 18 November 2003
Resolved
Repair excessive shaft packing leak on port shaft.
Due 18 December 2003
Resolved 18 November 2003
Resolution: Corrected.
Electrical › Lighting (service)
Issued 18 November 2003
Resolved
Repair overhead lighting in aft steering.
Due 18 December 2003
Resolved 18 December 2003
Electrical › Lighting (emergency)
Issued 18 November 2003
Resolved
Repair dim emergency lighting in aft steering.
Due 18 December 2003
Resolved 18 December 2003
Communications › Alarms/Indicators
Issued 18 November 2003
Resolved
Repair alarm panel in pilot house. Port and Stbd genset alarms activate when the E/R WTD is opened.
Due 18 December 2003
Resolved 18 December 2003
Lifesaving › Lifebuoys
Issued 18 August 2003
Resolved
Replace life rings on stbd vehicle deck.
Due 18 September 2003
Resolved 4 September 2003
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 18 August 2003
Resolved
Repair shaft tachometer on pilot house console.
Due 18 September 2003
Resolved 4 September 2003
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 18 August 2003
Resolved
Replace fire extinguisher in rescue boat. LEGACY COMPONENT DESC: Condition
Due 18 September 2003
Resolved 4 September 2003
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 15 July 2003
Resolved
Prove proper operation of the stbd main engine.
Action required: 705 - Other - as specified
Resolved 5 August 2003
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 15 May 2003
Resolved
Prove proper operation of stbd main engine upon completion of repairs.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 May 2003
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 13 May 2003
Resolved
Label ventillation closure panels on stack and vehicle deck "Close in case of engineroom fire".
Due 28 May 2003
Resolved 30 May 2003
Lifesaving › Buoyant Apparatus
Issued 13 May 2003
Resolved
Replace expired items in first aid kit. LEGACY COMPONENT DESC: First Aid Kit
Due 28 May 2003
Resolved 13 May 2003
Accommodation/Occupational Safety › Washroom/Toilet
Issued 13 May 2003
Resolved
Repair sink in female restroom. LEGACY COMPONENT DESC: Washbasin
Due 28 May 2003
Resolved 30 May 2003
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 13 May 2003
Resolved
Relabel A1 and A2 control valves at CO2 operating station. LEGACY COMPONENT DESC: Operating Controls
Due 28 May 2003
Resolved 30 May 2003
Electrical › Electrical Distribution System (service)
Issued 13 May 2003
Resolved
Properly secure engine wire harnesses on both main engines. LEGACY COMPONENT DESC: Cable
Due 28 May 2003
Resolved 30 May 2003
Electrical › Lighting (service)
Issued 13 May 2003
Resolved
Repair light fixture above stbd reduction gear. LEGACY COMPONENT DESC: Lighting Fixture
Due 28 May 2003
Resolved 30 May 2003
Engineering › Fuel Oil Service System
Issued 5 February 2003
Resolved
Repair leak on stbd main engine fuel oil piping. LEGACY COMPONENT DESC: Piping
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 February 2003
Resolution: Corrected.
Fire Fighting › Fire Main
Issued 5 February 2003
Resolved
Repair leak on firemain piping. LEGACY COMPONENT DESC: Condition
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 February 2003
Resolution: Corrected.
Accommodation/Occupational Safety › Ventilation
Issued 5 February 2003
Resolved
Repair exhaust ventillation for restrooms.
Due 5 March 2003
Resolved 18 February 2003
Resolution: Corrected.
Electrical › Electrical Distribution System (service)
Issued 5 February 2003
Resolved
Repair/replace electrical outlet for microwave oven. LEGACY COMPONENT DESC: Outlet Box
Due 5 March 2003
Resolved 18 February 2003
Resolution: Corrected.
Lifesaving › Lifebuoys
Issued 5 February 2003
Resolved
Replace line on life rings. LEGACY COMPONENT DESC: Buoyant Lifeline
Due 5 March 2003
Resolved 18 February 2003
Resolution: Corrected.
Lifesaving › Lifebuoys
Issued 5 February 2003
Resolved
Replace reflective tape on life rings.
Due 5 March 2003
Resolved 18 February 2003
Resolution: Corrected.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 5 February 2003
Resolved
Repair exhaust leak on port main engine. LEGACY COMPONENT DESC: Piping (exhaust)
Due 5 March 2003
Resolved 18 February 2003
Resolution: Corrected.
Lifesaving › Rescue Boat
Issued 5 February 2003
Resolved
Shorten and replace cable on rescue boat winch.
Due 5 March 2003
Resolved 18 February 2003
Resolution: Corrected.
Engineering › Bilge Water Management System
Issued 5 February 2003
Resolved
Clean/ remove trash in engineroom bilges.
Due 5 March 2003
Resolved 18 February 2003
Resolution: Corrected.
Engineering › Steering Gear System › Linkage
Issued 2 January 2003
Resolved
Make repairs to steering gear system as discussed this date. Repairs and testing to be completed to the satisfaction of the attending CG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 January 2003
Resolution: Corrected.
Navigation › Collision/Grounding Avoidance › Searchlight
Issued 6 November 2002
Resolved
Repair stbd searchlight. Currently inop.
Due 6 December 2002
Resolved 2 December 2002
Resolution: Corrected.
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 6 November 2002
Resolved
Provide proper/adequate pin system for anchor housing retention arm. Currently has a bolt/nut pin that is frozen.
Due 6 December 2002
Resolved 2 December 2002
Resolution: Corrected.
Communications › Alarms/Indicators › Bilge Alarm
Issued 6 November 2002
Resolved
Properly label bilge alarms for shaft alley and rudder room on pilot house panel.
Due 6 December 2002
Resolved 2 December 2002
Resolution: Corrected.
Engineering › Compressed Air System (control) › Piping
Issued 6 November 2002
Resolved
Replace flex hose on upper air receiver in engineroom.
Due 6 December 2002
Resolved 2 December 2002
Resolution: Corrected.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 6 November 2002
Resolved
Remove or properly install breaker panel located near port side of switchboard.
Due 6 December 2002
Resolved 2 December 2002
Resolution: Corrected.
Engineering › Steering Gear System › Actuator
Issued 6 November 2002
Resolved
Make repairs to #2 steering gear system. When operating on #2 steering gear system the rudder makes contact with the stbd mechanical stops.
Due 6 December 2002
Resolved 2 December 2002
Resolution: Corrected.
Engineering › Bilge Water Management System
Issued 25 September 2002
Resolved
Demonstrate proper operation of the newly installed stbd bilge pump. Installation and testing is to be to the satisfaction of the attending C.G. Marine Inspector. LEGACY COMPONENT DESC: Pump
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 October 2002
Resolution: Corrected.
Stability › Watertight Integrity
Issued 24 July 2002
Resolved
Replace gasket on watertight door leading from engineroom to shaft alley.
Due 15 August 2002
Resolved 1 August 2002
Resolution: Corrected.
Electrical › Electrical Distribution System (service) › Cable
Issued 24 July 2002
Resolved
Repair cable clamp on thermostat for heater in galley area.
Due 15 August 2002
Resolved 1 August 2002
Resolution: Corrected.
Fire Fighting › Nozzles › Condition
Issued 24 July 2002
Resolved
Replace spud chain on fire nozzle at fwd fire station.
Due 15 August 2002
Resolved 1 August 2002
Resolution: Corrected.
Lifesaving › Lifebuoys
Issued 24 July 2002
Resolved
Replace battery in float light on stbd aft ring buoy.
Due 15 August 2002
Resolved 1 August 2002
Resolution: Corrected.
Engineering › Lubricating Oil Service System › Piping
Issued 24 July 2002
Resolved
Repair oil leak on lube oil pressure switch at port genset.
Due 15 August 2002
Resolved 1 August 2002
Resolution: Corrected.
Electrical › Electrical Distribution System (service)
Issued 24 July 2002
Resolved
Provide protective covers for ground indicator lights on switchboard. LEGACY COMPONENT DESC: Switchboard
Due 15 August 2002
Resolved 25 September 2002
Resolution: Corrected.
Electrical › Electrical Distribution System (service) › Cable
Issued 24 July 2002
Resolved
Properly secure cable in shaft alley centerline overhead.
Due 15 August 2002
Resolved 1 August 2002
Resolution: Corrected.
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 24 July 2002
Resolved
Make repairs to stbd mde governor system. Prove operation of overspeed trip device.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 August 2002
Resolution: Corrected.
Engineering › Fuel Oil Service System › Valve
Issued 24 July 2002
Resolved
Prove proper operation of port remote fuel oil cut out valve.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 August 2002
Resolution: Corrected.
Operations/Management › Drills/Instruction
Issued 1 May 2002
Resolved
Log training and drills as seperate events in existing log books. I.E. (train, drill, train)
Due 1 June 2002
Resolved 1 August 2002
Resolution: Corrected.
Documentation › Logs/Records
Issued 1 May 2002
Resolved
Ensure masters log contains entries required by 46 CFR 78.17.
Due 1 June 2002
Resolved 1 August 2002
Resolution: Corrected.
Electrical › Electric Supply System (service) › Battery Charger
Issued 1 May 2002
Resolved
Provide splash guard for battery charger in pilot house port side aft.
Due 15 May 2002
Resolved 9 May 2002
Resolution: Corrected.
Engineering › Fuel Oil Storage/Transfer System
Issued 1 May 2002
Resolved
Clean flame screens on fuel oil tank vents and repair as needed. LEGACY COMPONENT DESC: Vent Pipe
Due 15 May 2002
Resolved 14 May 2002
Resolution: Corrected.
Electrical › Electrical Distribution System (emergency) › Conductor
Issued 1 May 2002
Resolved
Repair connections on battery bank located under pilot house a/c unit.
Due 15 May 2002
Resolved 9 May 2002
Resolution: Corrected.
Electrical › Electric Supply System (service) › Cable
Issued 1 May 2002
Resolved
Electrically disconnect old sewage pump controller if no longer in service.
Due 15 May 2002
Resolved 9 May 2002
Resolution: Corrected.
Engineering › Compressed Air System (control)
Issued 1 May 2002
Resolved
Prove proper operation of relief valve located on discharge piping of auxiliary air compressor.
Due 15 May 2002
Resolved 9 May 2002
Resolution: Corrected.
Engineering › Bilge Water Management System
Issued 1 May 2002
Resolved
Prove proper operation of bilge pumping system as required by 46 CFR 56.50. LEGACY COMPONENT DESC: Pump
Due 1 June 2002
Resolved 25 October 2002
Resolution: Corrected.
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 26 February 2002
Resolved
Provide a current copy COFR. Vessel operated two days without one.
Due 26 February 2002
Resolved 26 February 2002
Accommodation/Occupational Safety › Washroom/Toilet
Issued 5 February 2002
Resolved
Renew wasted deck dains in wash room and passenger areas as noted. LEGACY COMPONENT DESC: Location
Due 5 May 2002
Resolved 9 May 2002
Resolution: Corrected.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 5 February 2002
Resolved
Repair automatic shut down of engine room fan on activation of CO2 system. LEGACY COMPONENT DESC: Operating Controls
Due 5 March 2002
Resolved 9 May 2002
Resolution: Corrected.
Documentation › Manuals/Policy Documentation
Issued 5 February 2002
Resolved
Provide transfer procedures and line drawings. LEGACY COMPONENT DESC: Transfer Procedures
Due 5 March 2002
Resolved 9 May 2002
Resolution: Corrected.
Accommodation/Occupational Safety › Occupational Safety
Issued 5 February 2002
Resolved
Have sewage compartment open and provide a current marine chemist certificate for entry.
Due 5 May 2002
Resolved 9 May 2002
Resolution: Corrected.
Engineering › Compressed Air System (start air)
Issued 5 February 2002
Resolved
Renew 2 air hoses on air compressor as noted. LEGACY COMPONENT DESC: Compressor
Due 5 March 2002
Resolved 9 May 2002
Resolution: Corrected.
Engineering › Bilge Water Management System
Issued 5 February 2002
Resolved
Provide bilge pump data details for GPM. LEGACY COMPONENT DESC: Pump
Due 5 March 2002
Resolved 9 May 2002
Resolution: Corrected.
Electrical
Issued 28 November 2001
Resolved
PROVIDE PROPERLY SIZED CONDUCTORS ON THE AUX ENGINE BATTERY STARTING SYSTEM.
Condition: Unknown
Due 7 December 2001
Resolved 9 May 2002
Resolution: Corrected.
Lifesaving
Issued 28 November 2001
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 7 December 2001
Resolved 9 May 2002
Resolution: Corrected.
Construction/Loadline
Issued 28 November 2001
Resolved
CLEAN ENGINEROOM BILGES.
Condition: Unknown
Due 7 January 2002
Resolved 9 May 2002
Resolution: Corrected.
Construction/Loadline
Issued 28 November 2001
Resolved
DEMONSTRATE PROPER OPERATION OF THE BILGE PUMPING SYSTEM.
Condition: Unknown
Due 21 February 2002
Resolved 9 May 2002
Resolution: Corrected.
Navigation
Issued 28 November 2001
Resolved
REPAIR RADARS. WITH BOTH RADARS OPERATING, INTERFERENCE WAS NOTED AT BOTH RADAR SCREENS.
Condition: Unknown
Due 7 January 2002
Resolved 9 May 2002
Resolution: Corrected.
Electrical
Issued 10 October 2001
Resolved
PROVIDE WIRE NUTS ON THE TERMINATIONS OF WIRE ENDS IN THE GENSET JUNCTION BOX.
Condition: Unknown
Due 1 November 2001
Resolved 1 November 2001
Electrical
Issued 10 October 2001
Resolved
CLEAN UP WIRING TERMINATIONS AND REMOVE EXCESS UNUSED WIRES AND PROPERLY INSTALL JUNCTION BOX UNDER ENGINE CONSOLE.
Condition: Unknown
Due 1 November 2001
Resolved 1 November 2001
Documentation
Issued 10 October 2001
Resolved
PROVIDE VALID CERTIFICATE OF FINANCIAL RESPONSIBILITY.
Condition: Unknown
Due 16 October 2001
Resolved 16 October 2001
Electrical
Issued 21 September 2001
Resolved
REPAIR WATT METER ON MAIN SWITCH BOARD._x001C_
Condition: Unknown
Due 21 September 2001
Resolved 21 September 2001
Electrical
Issued 14 September 2001
Resolved
Correct markings on non-emergency lights in aft steering and install propersized light bulbs in all emergency lighting fixtures._x001C_
Condition: Unknown
Due 14 September 2001
Resolved 14 September 2001
Accommodation/Occupational Safety
Issued 14 September 2001
Resolved
Secure all loose gear in engine room and crew area to provide proper accessin case of a emergency.
Condition: Unknown
Due 14 September 2001
Resolved 14 September 2001
Deck/Cargo
Issued 14 September 2001
Resolved
Conduct anchor drill in present of a C.G. Marine Inspector._x001C_
Condition: Unknown
Due 14 September 2001
Resolved 14 September 2001
Electrical
Issued 14 September 2001
Resolved
Repair wiring to rescue boat battery._x001C_
Condition: Unknown
Due 14 September 2001
Resolved 14 September 2001
Fire Fighting
Issued 14 September 2001
Resolved
Repair restroom vent so it don't vent in the engine stack.
Condition: Unknown
Due 14 September 2001
Resolved 14 September 2001
Electrical
Issued 14 September 2001
Resolved
Properly secure rescue boat battery box._x001C_
Condition: Unknown
Due 14 September 2001
Resolved 14 September 2001
Lifesaving
Issued 14 September 2001
Resolved
Install bilge alarm in aft steering compartment._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 September 2001
Resolved 14 September 2001
Accommodation/Occupational Safety
Issued 14 September 2001
Resolved
Repair PA system, call back and talk back don't work._x001C_
Condition: Unknown
Due 14 September 2001
Resolved 14 September 2001
Engineering
Issued 14 September 2001
Resolved
Renew air control hoses under engine room console._x001C_
Condition: Unknown
Due 14 September 2001
Resolved 14 September 2001
Lifesaving
Issued 14 September 2001
Resolved
Properly mark General alarm bell in engine room._x001C_
Condition: Unknown
Due 14 September 2001
Resolved 14 September 2001
Engineering
Issued 6 June 2001
Resolved
Repair engine room gauges on bridge console._x001C_
Condition: Unknown
Due 20 July 2001
Resolved 20 July 2001
Electrical
Issued 6 June 2001
Resolved
Clean both ship service generators.
Condition: Unknown
Due 6 June 2001
Resolved 6 June 2001
Navigation
Issued 6 June 2001
Resolved
Repair port radar and properly install new power cable to antenna._x001C_
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Electrical
Issued 6 June 2001
Resolved
Repair port generator watt meter._x001C_
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Engineering
Issued 6 June 2001
Resolved
Repair Stb engine tach._x001C_
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Engineering
Issued 6 June 2001
Resolved
Repair tach on port generator._x001C_
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Engineering
Issued 6 June 2001
Resolved
Renew and properly install all hoses that shows signs of wear and that is not properly installed on all engines._x001C_
Condition: Unknown
Due 20 August 2001
Resolved 20 August 2001
Electrical
Issued 6 June 2001
Resolved
Clean main switch board._x001C_
Condition: Unknown
Due 6 June 2001
Resolved 6 June 2001
Electrical
Issued 6 June 2001
Resolved
Repair fuel leak on aux engine fuel return line._x001C_
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Electrical
Issued 6 June 2001
Resolved
Repair all wiring on all engines that is not properly installed._x001C_
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Navigation
Issued 6 June 2001
Resolved
Provide proper charts and light list._x001C_
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Lifesaving
Issued 6 June 2001
Resolved
Provide proper first aid kit._x001C_
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Fire Fighting
Issued 21 February 2001
Resolved
Post proper operating instructions for the engine room CO2 fixed system._x001C_
Condition: Unknown
Due 21 February 2001
Resolved 21 February 2001
Electrical
Issued 21 February 2001
Resolved
Install proper emergency lighting at stowage area for B/A's._x001C_
Condition: Unknown
Due 21 February 2001
Resolved 21 February 2001
Engineering
Issued 21 February 2001
Resolved
Renew flex hose on port MDE cooling system._x001C_
Condition: Unknown
Due 27 March 2001
Resolved 27 March 2001
Engineering
Issued 21 February 2001
Resolved
Properly adjust starboard shaft packing seal._x001C_
Condition: Unknown
Due 27 March 2001
Resolved 27 March 2001
Accommodation/Occupational Safety
Issued 21 February 2001
Resolved
Properly secure dirty lube oil line over Stb MDE._x001C_
Condition: Unknown
Due 27 March 2001
Resolved 27 March 2001
Electrical
Issued 21 February 2001
Resolved
Install proper cover on light fixture above air reciever in engine room._x001C_
Condition: Unknown
Due 27 March 2001
Resolved 27 March 2001
Navigation
Issued 21 February 2001
Resolved
Clean stren Nav light._x001C_
Condition: Unknown
Due 27 March 2001
Resolved 27 March 2001
Construction/Loadline
Issued 21 February 2001
Resolved
Install proper bilge screens for pick up lines in aft steering and shaft alley._x001C_
Condition: Unknown
Due 21 February 2001
Resolved 21 February 2001
Electrical
Issued 28 August 2000
Resolved
INSTALL CAP TO BARGE POWER RECEPTACLE ON DECK.
Condition: Unknown
Due 28 August 2000
Resolved 28 August 2000
Engineering
Issued 28 August 2000
Resolved
PROVIDE PIPE SUPPORT FOR FUEL LINE THAT PASSES UNDER STARBOARD MAIN DIESEL ENGINE.
Condition: Unknown
Due 28 August 2000
Resolved 28 August 2000
Engineering
Issued 28 August 2000
Resolved
REDUCE LENGTH OF FLEXIBLE HOSES TO 30 INCHES AND SECURE PROPERLY ON PORT MAIN DIESEL ENGINE AS DISCUSSED.
Condition: Unknown
Due 28 August 2000
Resolved 28 August 2000
Fire Fighting
Issued 28 August 2000
Resolved
LABEL CO2 FIXED EXTINGUISHING SYSTEM CONTROL BOTTLES AND "DELAY RELAY BY- PASS BOTTLE".
Condition: Unknown
Due 28 August 2000
Resolved 28 August 2000
Construction/Loadline
Issued 28 August 2000
Resolved
MAKE PERMANENT REPAIRS TO STARBOARD SIDE OF PILOT HOUSE AT DECK WHERE STEELIS WASTED.
Condition: Unknown
Due 28 August 2000
Resolved 28 August 2000
Lifesaving
Issued 28 August 2000
Resolved
PROVIDE PLAN FOR SAFETY & LIFESAVING EQUIPMENT TESTING AND MAINTENANCE.
Condition: Unknown
Due 28 August 2000
Resolved 28 August 2000
Lifesaving
Issued 28 August 2000
Resolved
REPLACE EXISTING RESCUE BOAT WINCH WITH WINCH DESIGNED TO LIFT RESCUE BOAT.
Condition: Unknown
Due 28 August 2000
Resolved 28 August 2000
Engineering
Issued 2 March 2000
Resolved
PROVE PROPER OPERATION OF NEW GOVERNOR CONTROL SYSTEM. IF SYSTEM CANNOT BESATISFACTORILY PROVEN, REMOVE COMPONENTS FROM THE VESSEL.
Condition: Unknown
Due 2 March 2000
Resolved 2 March 2000
Engineering
Issued 26 January 2000
Resolved
LABEL ENGINE ROOM CONSOLE GAUGES AND PROVE ALL, REPLACE MISSING BULBS.
Condition: Unknown
Due 26 January 2000
Resolved 26 January 2000
Electrical
Issued 26 January 2000
Resolved
COMPLETE LABELING OF ELECTRICAL SHUTDOWNS THROUGH OUT.
Condition: Unknown
Due 26 January 2000
Resolved 26 January 2000
Construction/Loadline
Issued 26 January 2000
Resolved
REPLACE MAIN DECK VENT AND VALVE LABELS.
Condition: Unknown
Due 26 January 2000
Resolved 26 January 2000
Electrical
Issued 26 January 2000
Resolved
PROVE GROUND DETECTION ON SWITCHBOARD.
Condition: Unknown
Due 26 January 2000
Resolved 26 January 2000
Lifesaving
Issued 26 January 2000
Resolved
PROVIDE ON BOARD APPROVED FIRST AID KIT.
Condition: Unknown
Due 26 January 2000
Resolved 26 January 2000
Lifesaving
Issued 26 January 2000
Resolved
REPLACE MISSING ROLLED BARS AT FREEING PORTS ON MAIN DECK.
Condition: Unknown
Due 26 January 2000
Resolved 26 January 2000
Lifesaving
Issued 26 January 2000
Resolved
INSTALL GENERAL ALARM ACTUATOR IN ENGINE ROOM.
Condition: Unknown
Due 4 February 2000
Resolved 4 February 2000
Documentation
Issued 26 January 2000
Resolved
Failure to maintain conditions of COI.
Condition: Unknown
Due 26 January 2000
Resolved 26 January 2000
Engineering
Issued 26 January 2000
Resolved
PRIOR TO OPERATING VESSEL WITH PASSENGERS, VEHICLES OR CARGO, PROVE PROPER OPERATION OF PROPULSION PLANT OVER A 3 DAY INSPECTION TRIAL PERIOD TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR AND PROVIDE ENGINE ROOM LOGSRECORDS FOR ALARMS AND OUTAGES FOR 7 DAYS PRECEDING TRIAL PERIOD.
Condition: Unknown
Due 26 January 2000
Resolved 26 January 2000
Lifesaving
Issued 12 November 1999
Resolved
vessel experinced powerloss on three seperate dates with no notification tothe COTP.
Condition: Unknown
Due 26 July 2000
Resolved 26 July 2000
Documentation
Issued 12 November 1999
Resolved
Crew failed to meet conditions of the COI by not making repairs to an ongoing problem with the MDE, therefore not maintaining a proper power plant.
Condition: Unknown
Due 26 July 2000
Resolved 26 July 2000
Construction/Loadline
Issued 24 May 1999
Resolved
Complete and submit, to Coast Guard Marine Safety Detachment Baton Rouge, LA, a structural review of the bottom plate area forward of the rudder post. Review to be completed by a qualified marine architect and Coast Guard marine inspector prior to making repairs.
Condition: Unknown
Due 24 May 1999
Resolved 24 May 1999
Construction/Loadline
Issued 24 May 1999
Resolved
Prior to carrying vehicles or passengers, submit a repair proposal in conjucntion with marine archtect's structural review, and upon Coast Guard acceptance of proposal, make permanent repairs to bottom plate just forwardof rudder posts to the satisfaction of the attending Coast Guard inspector.
Condition: Unknown
Due 24 May 1999
Resolved 24 May 1999
Navigation
Issued 1 April 1999
Resolved
Submit plans and obtain approval for steering system changes.
Condition: Unknown
Due 1 April 1999
Resolved 1 April 1999
Navigation
Issued 1 April 1999
Resolved
Repair hydrulic leak at #2 pump valve.
Condition: Unknown
Due 11 April 1999
Resolved 19 April 1999
Construction/Loadline
Issued 1 April 1999
Resolved
GOUGE AND WELD FRACTURE TO VERTICAL SUPPORT IN STEERING FLAT JUST AFT OF WATERTIGHT DOOR.
Condition: Unknown
Due 1 April 1999
Resolved 1 April 1999
Navigation
Issued 1 April 1999
Resolved
Provide piping diagram at steering pumps, label valves.
Condition: Unknown
Due 11 April 1999
Resolved 19 April 1999
Navigation
Issued 1 April 1999
Resolved
PROVIDE AND PROVE PROPER OPERATION OF EACH STEERING PUMP RUN INDICATORS ON BRIDGE.
Condition: Unknown
Due 1 April 1999
Resolved 1 April 1999
Navigation
Issued 1 April 1999
Resolved
Provide lost of power alarm at steering alarm panel.
Condition: Unknown
Due 11 April 1999
Resolved 19 April 1999
Navigation
Issued 1 April 1999
Resolved
Provide emergnecy steering procedures on the station bill.
Condition: Unknown
Due 11 April 1999
Resolved 19 April 1999
Documentation
Issued 23 March 1999
Resolved
INSTALL PIPING, WIRING, AND OPERATION INSTRUCTIONS FOR THE STEERING SYSTEM.OPERATING INSTRUCTIONS TO BE POSTED IN WHEEL HOUSE, E/R, AND AFTERSTEERING.PIPING DIAGRAMS TO BE POSTED IN E/R AND AFT STEERING. VESSEL NOT TO CARRY PASSENGERS UNTIL REQUIREMENT IS FULFILLED.
Condition: Unknown
Due 23 March 1999
Resolved 23 March 1999
Documentation
Issued 23 March 1999
Resolved
PROVIDE APPROVED PLANS FOR STEERING SYSTEM MODIFICATION. PLANS TO INCLUDE AT A MINIMUM, BLOCK VALVE TO PREVENT LOSS OF OIL FROM FAILURE OF EACH SYSTEM, PIPING AND WIRING DIAGRAMS. VESSEL NOT TO CARRY PASSENGERS UNTIL COAST GUARD APPROVED PLANS HAVE BEEN REVIEWED.
Condition: Unknown
Due 23 March 1999
Resolved 23 March 1999
Fire Fighting
Issued 23 March 1999
Resolved
PROVIDE PIPING DIAGRAM AND OPERATING INSTRUCTIONS FOR FIRE PUMP & FIRE MAINSYSTEM. VESSEL NOT TO CARRY PASSENGERS UNTIL THIS REQUIREMENT IS SATISFIED.
Condition: Unknown
Due 23 March 1999
Resolved 23 March 1999
Lifesaving
Issued 9 March 1999
Resolved
INSTALL A DIFFERENT AUDIBLE ALARM IN E/R TO DIFFERENTIATE BETWEEN GENERAL ALARM AND ENGINE FAULT ALARM.
Condition: Unknown
Due 9 March 1999
Resolved 9 March 1999
Lifesaving
Issued 9 March 1999
Resolved
HOLD FIRE AND BOAT DRILL ON VESSEL WITH NORMAL CREW IN PRESENCE OF MARINE INSPECTOR.
Condition: Unknown
Due 12 March 1999
Resolved 10 March 1999
Lifesaving
Issued 9 March 1999
Resolved
REPAIR/REPLACE SOUND POWERED PHONE OUTSIDE AFT STEERING SPACE.
Condition: Unknown
Due 9 March 1999
Resolved 9 March 1999
Navigation
Issued 9 March 1999
Resolved
INSTALL PROPER RUNNING LIGHTS ON RESCUE BOAT.
Condition: Unknown
Due 9 March 1999
Resolved 9 March 1999
Documentation
Issued 9 March 1999
Resolved
INSTALL PIPING, WIRING AND OPERATION INSTRUCTIONS FOR STEERING SYSTEM. OPERATING INSTRUCTIONS TO BE POSTED IN WHEEL HOUSE, E/R, AND AFT STEERING. PIPING & WIRING INSTRUCTIONS TO BE POSTED IN E/R AND AFT STEERING.
Condition: Unknown
Due 9 March 1999
Resolved 9 March 1999
Documentation
Issued 9 March 1999
Resolved
PROVIDE APPPROVED PLANS FOR STEERING SYSTEM MODIFICATIONS.
Condition: Unknown
Due 9 March 1999
Resolved 9 March 1999
Electrical
Issued 9 March 1999
Resolved
PROPERLY PACK WIRES ON P/S BRIDGE WING TALK BACK SYSTEM.
Condition: Unknown
Due 9 March 1999
Resolved 9 March 1999
Documentation
Issued 9 December 1998
Resolved
CONDUCT REINSPECTION IN CONCURRANCE WITH HULL EXAM.
Condition: Unknown
Due 9 December 1998
Resolved 9 December 1998
Electrical
Issued 9 September 1998
Resolved
COVER HOLE OR REPLACE CIRCUITBREAKER IN HOLE ON SWITCHBOARD IN ENGINE ROOM.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Unknown
Issued 9 September 1998
Resolved
REPAIR OR REPLACE AS ORIGINAL VSL'S PUBLIC ADDRESS SYSTEM.
Condition: Unknown
Due 27 October 1998
Resolved 27 October 1998
Electrical
Issued 9 September 1998
Resolved
REPLACE STERN LIGHT LENS WITH PROPERLY COLORED LENS.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Engineering
Issued 9 September 1998
Resolved
PROVE PROPER OPERATION OF STBD ENGINE OVER SPEED ALARM/SHUTDOWN.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Navigation
Issued 9 June 1998
Resolved
CLEAN STERN LIGHT LENS
Condition: Unknown
Due 9 June 1998
Resolved 9 June 1998
Lifesaving
Issued 9 June 1998
Resolved
REMOVE GASOLINE CAN AND GASOLINE PWOERED PUMP FROM CO2 ROOM AND STORE IN PROPER FLAMMABLE STORAGE LOCKER.
Condition: Unknown
Due 9 June 1998
Resolved 9 June 1998
Engineering
Issued 9 June 1998
Resolved
PROVE PROPER OPERATION OF PORT MAIN ENGINE LOW LUBE OIL SHUTDOWN, MAIN ENGINE FAILURE ALARM.
Condition: Unknown
Due 9 June 1998
Resolved 25 June 1998
Fire Fighting
Issued 9 June 1998
Resolved
PROVIDE GASKET FOR THE FIRE HOSE NOZZLE AT #1 FIRE STATION.
Condition: Unknown
Due 9 June 1998
Resolved 9 June 1998
Navigation
Issued 9 June 1998
Resolved
PROVE PROPER OPERATION OF NAV. LIGHT AUDIBLE ALARM.
Condition: Unknown
Due 9 June 1998
Resolved 9 June 1998
Navigation
Issued 9 June 1998
Resolved
PROVE PROPER OPERATION OF SHIPS WHISTLE (AIR POWERED).
Condition: Unknown
Due 9 June 1998
Resolved 9 June 1998
Navigation
Issued 9 June 1998
Resolved
PROVIDE PROPER LENS COVER FOR STEERING MOTOR OVERLOAD ALARM.
Condition: Unknown
Due 9 June 1998
Resolved 9 June 1998
Electrical
Issued 9 June 1998
Resolved
PROVE PROPER OPERATION OF "E" LIGHTS IN CREW AND PASSENGER LOUNGE AREA.
Condition: Unknown
Due 9 June 1998
Resolved 9 June 1998
Navigation
Issued 12 March 1998
Resolved
PROVIDE PROPER OPERATION OF SOUND POWERED TELEPHONE IN THE E/R AT ACCESS TOSTEERING GEAR SPACE AND PROVIDE DIRECTORY OF NUMBERS AT EACH LOCATION.
Condition: Unknown
Due 19 March 1998
Resolved 19 March 1998
Engineering
Issued 16 September 1997
Resolved
REPLACE PORT GENERATOR FUEL OIL HOSE TO FILTER WITH APPROVED TYPE.
Condition: Unknown
Due 16 September 1997
Resolved 23 October 1997
Fire Fighting
Issued 16 September 1997
Resolved
PROVE PROPER OPERATION OF ENGINE ROOM EXHUAST VENTILATION SHUTDOWN FOR CO2 SYSTEM.
Condition: Unknown
Due 16 September 1997
Resolved 23 October 1997
Electrical
Issued 16 September 1997
Resolved
REPLACE EXHAUST VENTILATION BREAKER IN SWITCHBOARD-ENGINE ROOM.
Condition: Unknown
Due 16 September 1997
Resolved 23 October 1997
Lifesaving
Issued 16 September 1997
Resolved
PROVIDE FOUR (4) NEW LIFE FLOAT OARS AND STENCILE EACH.
Condition: Unknown
Due 16 September 1997
Resolved 21 October 1997
Lifesaving
Issued 16 September 1997
Resolved
PROPERLY LABEL BOTTOM LIFE FLOAT WITH CAPACITY AND VESSEL'S NAME.
Condition: Unknown
Due 16 September 1997
Resolved 21 October 1997
Navigation
Issued 16 September 1997
Resolved
PROVE PROPER OPERATION OF THE 2ND MARINE RADAR, OR REMOVE UNIT FROM VESSEL.
Condition: Unknown
Due 16 September 1997
Resolved 21 October 1997
Engineering
Issued 16 September 1997
Resolved
PROVE PROPER OPERATION OF ENGINE TACHOMETERS IN PILOT HOUSE.
Condition: Unknown
Due 16 September 1997
Resolved 23 October 1997
Lifesaving
Issued 16 September 1997
Resolved
PROVIDE FOUR (4) RING LIFE BUOYS AND PROPERLY INSTALL RETROREFLECTIVE TAPE ON EACH. STENCILE EACH WITH VESSEL'S NAME.
Condition: Unknown
Due 16 September 1997
Resolved 21 October 1997
Electrical
Issued 16 September 1997
Resolved
PROVE PROPER OPERATION OF SWITCHBOARD GROUND DETECTION SYSTEM (32V SYSTEM).
Condition: Unknown
Due 16 September 1997
Resolved 23 October 1997
Engineering
Issued 16 September 1997
Resolved
PROVE PROPER OPERATION OF THE PORT ENGINE SHAFT TACHOMETER.
Condition: Unknown
Due 9 October 1997
Resolved 23 October 1997
Lifesaving
Issued 16 April 1997
Resolved
PROVIDE AN OUTBOARD MOTOR PROPELLED RESCUE BOAT AND DAVIT FOR LAUNCHING.
Condition: Unknown
Due 16 April 1997
Resolved 16 April 1997
Accommodation/Occupational Safety
Issued 11 March 1997
Resolved
SECURE REEFER IN GALLEY.
Condition: Unknown
Due 18 March 1997
Resolved 14 March 1997
Lifesaving
Issued 11 March 1997
Resolved
PROVIDE AND PROVE PROPER OPERATION OF MECHANICALLY PROPELLED RESCUE BOAT.
Condition: Unknown
Due 11 March 1997
Resolved 11 March 1997
Fire Fighting
Issued 11 March 1997
Resolved
RENDER FIXED CO2 SPACE UNLOCKABLE.
Condition: Unknown
Due 18 March 1997
Resolved 14 March 1997
Electrical
Issued 11 March 1997
Resolved
RELOCATE MURPHY SWITCH FROM BELOW STARBOARD GENERATOR WATER COOLING EXPANSION TANK.
Condition: Unknown
Due 18 March 1997
Resolved 14 March 1997
Engineering
Issued 25 June 1996
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 25 June 1996
Resolved 25 June 1996
Navigation
Issued 10 June 1996
Resolved
INSTALL A OPERABLE TELEPHONE TO ESTABLISH COMMUNICATIONS BETWEEN THE PILOT HOUSE AND THE STEERING GEAR COMPARTMENT.
Condition: Unknown
Due 10 June 1996
Resolved 10 June 1996
Navigation
Issued 13 March 1996
Resolved
Repair excessive leakage from hydraulic stering pump by-pass valve.
Condition: Unknown
Due 13 April 1996
Resolved 20 March 1996
Navigation
Issued 13 March 1996
Resolved
Prove proper operation of steering gear power available indicator light on wheelhouse control station.
Condition: Unknown
Due 13 April 1996
Resolved 20 March 1996
Navigation
Issued 13 March 1996
Resolved
Investigate the differences in the three (3) positiojns of the steering gear selector switch at bridge helm then post detailed instructions for each mode (include switch position and mechanical steering engage/disengagelever position). Permanently label all positions of switch and lever.
Condition: Unknown
Due 13 April 1996
Resolved 27 March 1996
Accommodation/Occupational Safety
Issued 13 March 1996
Resolved
Provide and post a placard containing the necessary operating instructions,safety precautions, and warnings pertinent to the marine sanitation device per 33 CFR 159.57 and 159.59. These instructons to be posted by MSD control station (pump motor controller) in engine room.
Condition: Unknown
Due 27 March 1996
Resolved 27 March 1996
Navigation
Issued 13 March 1996
Resolved
Properly paint navigation side light screens matt black.
Condition: Unknown
Due 13 April 1996
Resolved 20 March 1996
Accommodation/Occupational Safety
Issued 13 March 1996
Resolved
Make available for entry the void containing the marine sanitation device holding/processing tank. Replace unauthorized yellow electrical cable withelectrical cable that meets 46 CFR 111.60-1 (marine electrical cable). Void must be gas-freed by certified marine chemist (potential H2S).
Condition: Unknown
Due 27 March 1996
Resolved 27 March 1996
Accommodation/Occupational Safety
Issued 13 March 1996
Resolved
Repair MSD system air compressor (blower) switch. MSD discharge pump not tobe placed in "AUTO" position until air compressor is operational. (No discharge overboard of raw sewage)
Condition: Unknown
Due 15 March 1996
Resolved 20 March 1996
Engineering
Issued 13 March 1996
Resolved
Repair low lube oil pressure shutdown switch on port propulsion engine.
Condition: Unknown
Due 13 April 1996
Resolved 20 March 1996
Navigation
Issued 13 March 1996
Resolved
Provide more adequate means for securing linkages on steering feedback and rudder angle indicator components; ie. Jam nuts, Nylock nuts, cotter keys, etc.
Condition: Unknown
Due 15 March 1996
Resolved 20 March 1996
Electrical
Issued 13 March 1996
Resolved
Repair/replace faulty transformer on hydraulic steering pump motor controller. Remove temporary wiring to controller. Prove proper operation to CG inspector.
Condition: Unknown
Due 15 March 1996
Resolved 20 March 1996
Electrical
Issued 14 September 1995
Resolved
PROPERLY DEAD END WIRING UNDER CONTROL CONSOLE IN E/R, IN MAIN ENGINE GAUGEJ-BOXES P/S, AND BEHIND MAIN ELECTRICAL SWITCHBOARD. WIRING MUST BE REMOVED OR PROPERLY DEAD-ENDED IN J-BOXES.
Condition: Unknown
Due 27 September 1995
Resolved 27 September 1995
Engineering
Issued 14 September 1995
Resolved
REPAIR/PROVE PROPER OPERATION OF MAIN AIR COMPRESSOR AND RELIEF VALVE ON BOTTOM AIR RECEIVER.
Condition: Unknown
Due 27 September 1995
Resolved 27 September 1995
Electrical
Issued 14 September 1995
Resolved
REROUTE AND SECURE LOOSE WIRING ON STARBOARD MAIN ENGINE.
Condition: Unknown
Due 27 September 1995
Resolved 27 September 1995
Documentation
Issued 14 September 1995
Resolved
ENSURE CHEMICAL TESTING PROGRAM COMPLIES WITH 46 CFR PART 16. COMPLETE FORM (B) ATTACHED AND RETURN TO ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 14 September 1995
Resolved 14 September 1995
Construction/Loadline
Issued 14 October 1994
Resolved
MAKE PROPER AND PERMANENT REPAIRS TO, #1 PORT VOID/BOW RAKE BOTTOM. VESSELMAY NOT OPERATE AS CERTIFICATED, UNTIL REPAIRS ARE COMPLETED AND SATISFACTORILY WITNESSED BY A USCG MARINE INSPECTOR.
Condition: Unknown
Due 9 November 1994
Resolved 14 October 1994
Construction/Loadline
Issued 14 October 1994
Resolved
PROCEED TO PLAQUEMINE POINT SHIPYARD TO EFECT REPAIRS, BY WAY OF PORT #1 VOID, OF THE BOW RAKE. VESSEL MAY NOT OPERATE AS CERTIFICATED.
Condition: Unknown
Due 9 November 1994
Resolved 14 October 1994
Engineering
Issued 22 September 1994
Resolved
REMOVE EXHAUST BLANKETS BOTH SS GEN AND CHECK FOR LEAKS. EXHAUST LEAK APPARENT DURING START UP.
Condition: Unknown
Due 22 September 1994
Resolved 22 September 1994
Engineering
Issued 22 September 1994
Resolved
REPLACE/REMOVE INOP. GAUGES ON ENG. CONTROL BOARD.
Condition: Unknown
Due 21 October 1994
Resolved 30 September 1994
Engineering
Issued 22 September 1994
Resolved
REPLACE F/O LINE ON ENGINE FOR FIRE PUMP, IMPROPER F/O LINE TO ENGINE.
Condition: Unknown
Due 29 September 1994
Resolved 30 September 1994
Construction/Loadline
Issued 22 September 1994
Resolved
MAKE PROPER AND PERMENANT REPAIRS TO FRACTURED SIDE LONG PORT SIDE IN COMPT. AFT OF E/R.
Condition: Unknown
Due 21 October 1994
Resolved 30 September 1994
Engineering
Issued 29 June 1994
Resolved
RENEW ALL UNAUTHORIZED CABLE WITH PROPER ARMORED CABLE ABOVE BOTH MAIN ENGINES.
Condition: Unknown
Due 29 June 1994
Resolved 29 June 1994
Engineering
Issued 29 June 1994
Resolved
REPLACE ALL UNAUTHORIZED SPLICES IN ELECTRICAL WIRING ABOVE BOTH MAIN ENGINES.
Condition: Unknown
Due 29 June 1994
Resolved 29 June 1994
Electrical
Issued 22 December 1993
Resolved
PROVE PROPER OPERATION OF INSTALLED EMERGENCY LIGHTING SYSTEM. PROPER OPERATION WILL BE WITNESSED BY A USCG INSPECTOR.
Condition: Unknown
Due 11 January 1994
Resolved 12 January 1994
Electrical
Issued 3 November 1992
Resolved
STBD S/S GEN TACH. HAS OIL IN GAUGE 1 1/4" OF OIL IN GAUGE.(REPAIR LEAK)
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Accommodation/Occupational Safety
Issued 3 November 1992
Resolved
REPLACE BROKEN WINDOWS IN E/R ENTRANCE PORTSIDE UPPER LEVEL.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Electrical
Issued 3 November 1992
Resolved
LOCATE AND REPAIR L/O LEAKS UNDER E/R CONTROL PANEL, CLEAN OIL FROM UNDER PANEL AND OFF ALL ELECTRICAL FITTINGS.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Electrical
Issued 3 November 1992
Resolved
REPAIR DOOR HINGE ON E/R CONTROL PANEL. RIGHT HAND DOOR BOTTOM HINGE.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Fire Fighting
Issued 3 November 1992
Resolved
FIRE EXIT PORTSIDE E/R INSTALL IN PROPER BRACKET.(JUST SITTING ON DECK NOT INSTALLED).
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Electrical
Issued 3 November 1992
Resolved
MAKE PROPER AND PERMENANT REPAIRS TO PORT S/S GEN AND PROVE OPERATION TO CGMARINE INSPECTION.
Condition: Unknown
Due 3 November 1992
Resolved 18 November 1992
Electrical
Issued 3 November 1992
Resolved
REPLACE F/O LINE FROM F/O FILTERS TO F/O PUMP STBD SS GENERATOR IMPROPER.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Electrical
Issued 3 November 1992
Resolved
REPLACE L/O LINE FITTINGS ON FLEXIBLE FLAMMABLE LINES STBD S/S GENERATOR.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Electrical
Issued 3 November 1992
Resolved
REPAIR EXHAUST LEAK ON STBD S/S GEN LEAKING UNDER BLANKET AT ELBOW.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Accommodation/Occupational Safety
Issued 3 November 1992
Resolved
REPLACE MISSING WINDOW ON FWD DOOR, STBD PASSENGER AREA.
Condition: Unknown
Due 10 November 1992
Resolved 16 November 1992
Electrical
Issued 3 November 1992
Resolved
PROPERLY INSTALL CABLE CONNECTION FROM EMERGENCY POWER BATTERY BOX (AFT OF BRIDGE) TO WHEEL HOUSE.
Condition: Unknown
Due 10 November 1992
Resolved 3 November 1992
Deck/Cargo
Issued 3 November 1992
Resolved
REPLACE LINE ON BLOCK AND TACKLE USED TO LIFT COVER OF THE BATTERY BOX(AFT OF BRIDGE).
Condition: Unknown
Due 10 November 1992
Resolved 16 November 1992
Lifesaving
Issued 3 November 1992
Resolved
REPLACE LINE ON BOTH LIFEFLOATS.
Condition: Unknown
Due 10 November 1992
Resolved 16 November 1992
Accommodation/Occupational Safety
Issued 3 November 1992
Resolved
REPLACE ALL BROKEN WINDOWS ON STBD SIDE PASSENGER AREA.
Condition: Unknown
Due 10 November 1992
Resolved 16 November 1992
Lifesaving
Issued 3 November 1992
Resolved
REPLACE NETTING ON BOTH LIFEFLOATS.
Condition: Unknown
Due 4 November 1992
Resolved 16 November 1992
Electrical
Issued 3 November 1992
Resolved
ROTATING EMERGENCY LIGHT ABOVE E/R CONTROL PANEL ROTATES BUT LIGHT OUT. RENEW BULB.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Electrical
Issued 3 November 1992
Resolved
RELPACE ALL MISSING/BURNT OUT BULBS ON SWITCHBOARD.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Electrical
Issued 3 November 1992
Resolved
LOCATE AND MAKE PROPER CONNECTIONS TO "DEAD END WIRES." LOCATED AND UNDER PORT BILGE PUMP CONTROLER OR REMOVE WIRES.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Electrical
Issued 3 November 1992
Resolved
REMOVE PAINT FROM COVERS OF DECKING LIGHTING.
Condition: Unknown
Due 10 November 1992
Resolved 16 November 1992
Engineering
Issued 3 November 1992
Resolved
STENCIL ARROW INDICATING "OFF" DIRECTION ON EMERGENCY FUEL SHUT OFF VALVES.
Condition: Unknown
Due 10 November 1992
Resolved 16 November 1992
Lifesaving
Issued 3 November 1992
Resolved
REPLACE LINE ON LIFERING LOCATED ON THE FORWARD STBD CORNER OF THE HOUSE.
Condition: Unknown
Due 10 November 1992
Resolved 16 November 1992
Lifesaving
Issued 3 November 1992
Resolved
STENCIL VESSEL'S NAME ON LIFERING LOCATED ON THE FORWARD PORT CORNER OF THEHOUSE.
Condition: Unknown
Due 10 November 1992
Resolved 16 November 1992
Electrical
Issued 3 November 1992
Resolved
PLUG ALL HOLES IN FWD BULKHEAD OF WHEELHOUSE (VIEWED WHILE LOOKING IN CABINET UNDER WHEEL HOUSE CONSOL).
Condition: Unknown
Due 10 November 1992
Resolved 16 November 1992
Fire Fighting
Issued 3 November 1992
Resolved
REMOVE ALL TRASH FORM CO2 BOTTLE ROOM.
Condition: Unknown
Due 10 November 1992
Resolved 3 November 1992
Engineering
Issued 3 November 1992
Resolved
CLEAN GREASE AND DIRT BUILD UP OFF E/R EXHAUST FAN LOCATED E/R UPPER LEVEL PORTSIDE ENTRANCE.
Condition: Unknown
Due 30 November 1992
Resolved 16 November 1992
Electrical
Issued 3 November 1992
Resolved
REMOVE ALL ITEMS "STORED" UNDER E/R CENTRAL PANEL. NOT TO BE USED TO STORE GEAR.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Engineering
Issued 3 November 1992
Resolved
SUBMITT REPAIR PLANS TO USCG [name withheld] FOR STBD SHAFT THAT IS "BENT"AND HAS BEARING MISSING.
Condition: Unknown
Due 3 November 1992
Resolved 3 November 1992
Electrical
Issued 3 November 1992
Resolved
REPLACE ALL MISSING LENS COVERS ON E/R LIGHTS.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Engineering
Issued 3 November 1992
Resolved
MAKE PROPER REPAIRS/REPLACEMENTS TO FOUNDATION BOLTS STBD M/E REDUCTION GEARS.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Engineering
Issued 3 November 1992
Resolved
MAKE PROPER REPAIRS TO F/O SUCTION LINE STBD M/E LEAKING AT UNION, LINE NOTSECURED, MOVING AROUND 1" PIPE. VALVE MISSING HANDLE.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Construction/Loadline
Issued 3 November 1992
Resolved
REMOVE OIL FROM BILGES IN E/R.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Accommodation/Occupational Safety
Issued 3 November 1992
Resolved
MAKE MSD AVAILABLE FOR NEXT INSPECTION(HAVE VOID GAS-FREED).
Condition: Unknown
Due 30 November 1992
Resolved 18 November 1992
Accommodation/Occupational Safety
Issued 3 November 1992
Resolved
FIX WINDOWS ON HOUSE, MAIN DECK. SEVERAL WINDOWS CURRENTLY USING STICKS TO KEEP THEM IN CLOSED POSTION.
Condition: Unknown
Due 10 November 1992
Resolved 18 November 1992
Electrical
Issued 3 November 1992
Resolved
PROVE OPERATION OF LIGHT LOCATED BY RESCUE BOAT.
Condition: Unknown
Due 10 November 1992
Resolved 16 November 1992
Electrical
Issued 3 August 1992
Resolved
LOCATED ON MAIN ENG SWITCHBOARD, BREAKER MISSING, SLOT OPEN. REPLACE BREAKER, OR COVER OPEN SLOT.
Condition: Unknown
Due 2 September 1992
Resolved 7 September 1992
Lifesaving
Issued 3 August 1992
Resolved
RENEW/REPLACE LIFERING ON STBD/AFT OF MAIN DECK. R/R LIGHT ON LIFERING.
Condition: Unknown
Due 2 September 1992
Resolved 7 September 1992
Navigation
Issued 3 August 1992
Resolved
CLEAN LENS ON STERNLIGHT.
Condition: Unknown
Due 2 September 1992
Resolved 7 September 1992
Electrical
Issued 3 August 1992
Resolved
IN E/R REPLACE GUARD ON ENGINE DRIVEN COMPRESSOR.
Condition: Unknown
Due 2 September 1992
Resolved 7 September 1992
Navigation
Issued 3 August 1992
Resolved
SUPPLY DEVIATION TABLE FOR MAGENTIC COMPASS.
Condition: Unknown
Due 2 September 1992
Resolved 7 September 1992
Fire Fighting
Issued 3 August 1992
Resolved
SERVICE FIXED CO2 SYSTEM.
Condition: Unknown
Due 2 September 1992
Resolved 7 September 1992
Electrical
Issued 3 August 1992
Resolved
MAIN ENGINE SWITCHBOARD: BEHIND SWITCHBOARD OIL SOAKED DECK AND WIRES. ALLOIL BEHIND SWITHCBOARD CLEANED UP. AND REMOVE FROM WIRES.
Condition: Unknown
Due 2 September 1992
Resolved 7 September 1992
Lifesaving
Issued 3 August 1992
Resolved
RENEW/REPLACE RETRO REFLECTIVE TAPE ON BOTH LIFEFLOATS
Condition: Unknown
Due 2 September 1992
Resolved 7 September 1992
Electrical
Issued 3 August 1992
Resolved
ON BRIDGE. EMERGENCY POWER PANEL DOOR SWINGS OPEN FREELY AND LATCH MISSING LEAVING ACCESS TO WIRES AND FUSES. REPAIR/REPLACE DOOR AND COVER ACCESS.
Condition: Unknown
Due 2 September 1992
Resolved 7 September 1992
Electrical
Issued 3 August 1992
Resolved
ON BRIDGE THE "ELECTRICAL PANEL SWITCHBOARD" PANEL DOOR WILL NOT LATCH, ANDWHEN OPEN BUSS ACCESSABLE. COVER OPEN SLOT IN ELECTRICAL PANEL AND REPAIR DOOR.
Condition: Unknown
Due 2 September 1992
Resolved 7 September 1992
Fire Fighting
Issued 6 May 1992
Resolved
REPLACE AND DEMONSTRATE THE OPERATION OF THE DIESEL DRIVEN STANDBY FIREPUMPDISCHARGE PRESSURE GAUGE.
Condition: Unknown
Due 6 May 1992
Resolved 6 May 1992
Fire Fighting
Issued 6 May 1992
Resolved
PROVIDE ONE ADDITIONAL BII FIRE EXTINGUISHER FOR THE MACHINERY SPACE DUE TOTHE INCREASE IN SHAFT HORSEPOWER DURING THE INSTALLATION OF NEW PROPULSION MACHINERY.
Condition: Unknown
Due 5 June 1992
Resolved 11 May 1992
Lifesaving
Issued 6 May 1992
Resolved
DEMONSTRATE PROPER OPERATION OF THE FOLLOWING GENERAL ALARM BELLS LOCATED IN THE CREWS BREAK ROOM, PASSENGER SEATING AREA, STBD MID-HOUSE EXTERIOR- MID SHIP POSITION.
Condition: Unknown
Due 6 May 1992
Resolved 6 May 1992
Electrical
Issued 6 May 1992
Resolved
DISCONNECT AND PROPERLY DEADEND CABLE, PROVIDE PROPER BREAKER CPVER FOR THEBRIDGE 120 VOLT ELECTRONICS PANEL.
Condition: Unknown
Due 6 May 1992
Resolved 6 May 1992
Lifesaving
Issued 6 May 1992
Resolved
RELOCATE PASSENGER LIFEJACKET LOCKER CURRENTLY LOCATED IN CREWS BREAK AREA SO AS TO BE ACCESSABLE TO PASSENGERS.
Condition: Unknown
Due 6 May 1992
Resolved 6 May 1992
Fire Fighting
Issued 5 August 1991
Resolved
RENEW TIME DELAY SWITCH FOR CO2 SYSTEM. TO BE 30 SEC. DELAY.
Condition: Unknown
Due 5 August 1991
Resolved 5 August 1991
Fire Fighting
Issued 5 August 1991
Resolved
REPAIR VENTILATION SHUT-DOWN FOR CO2 SYSTEM.
Condition: Unknown
Due 10 September 1991
Resolved 10 September 1991
Electrical
Issued 5 August 1991
Resolved
LOCATE AND CORRECT GROUND IN 120V CIRCUIT AS INDICATED ON GROUND DETECTION PANEL
Condition: Unknown
Due 10 September 1991
Resolved 10 September 1991
Electrical
Issued 5 August 1991
Resolved
PROVIDE EMERGENCY LIGHTING AT RESCUE BOAT STATION._x001C_
Condition: Unknown
Due 10 September 1991
Resolved 10 September 1991
Engineering
Issued 14 August 1990
Resolved
MAKE AVAILABLE FOR INTERNAL INSPECTION THE CONTROL AIR RECEIVER IN ACCORDANCE WITH 46 CFR 61.10-5
Condition: Unknown
Due 14 August 1990
Resolved 14 August 1990
Electrical
Issued 14 August 1990
Resolved
PROVE PROPER OPERATION OF THE PORT GENERATOR ENGINE LOW LUBE OIL PRESSURE SHUTDOWN.
Condition: Unknown
Due 14 August 1990
Resolved 14 August 1990
Electrical
Issued 23 May 1990
Resolved
PROVIDE THE EMERGENCY LIGHTING/GENERAL ALARM BATERY TRAYS WITH LINING OF CORROSIVE-RESISTANT MATERAL IN ACCORDANCE WITH 46 CFR 111.15-5.
Condition: Unknown
Due 23 May 1990
Resolved 23 May 1990
Navigation
Issued 21 February 1990
Resolved
RENEW OR REPAIR AND PROVE PROPER OPERATION OF THE SHAFT SPEED/DIRECTION INDICATORS ON THE NAVIGATION BRIDGE IN ACCORDANCE WITH 46CFR113.37-5.
Condition: Unknown
Due 21 February 1990
Resolved 21 February 1990
Engineering
Issued 21 February 1990
Resolved
EFFECT REPAIRS AND PROVE OPERATION OF STBD MAIN ENGINE LOW LUBE OIL ALARM IN ACCORDANCE WITH 46CFR58.05-1.
Condition: Unknown
Due 21 February 1990
Resolved 21 February 1990
Electrical
Issued 21 February 1990
Resolved
PROVE OPERATION OF OVERSPEED TRIP ON THE STBD SHIP'S SERVICE GENERATOR IN ACCORDANCE WITH 46 CFR 111.12-1.
Condition: Unknown
Due 21 February 1990
Resolved 21 February 1990
Engineering
Issued 16 November 1989
Resolved
EFFECT REPAIRS & PROVE OPERATION OF #1 (PORT) BILGE PUMP IN WAY OF BROKEN SHAFT COUPLING.
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Navigation
Issued 16 November 1989
Resolved
REPAIR AND PROVE OPERATION OF STEERING GEAR IN MANUAL MODE.
Condition: Unknown
Due 16 November 1989
Resolved 16 November 1989
Lifesaving
Issued 16 August 1989
Resolved
PROVIDE DONNING INSTRUCTIONS AT ALL LIFE PRESERVER STOWAGE LOCKERS IN ACCORDANCE WITH 46CFR75.40-25.
Condition: Unknown
Due 16 August 1989
Resolved 16 August 1989
Navigation
Issued 16 August 1989
Resolved
EFFECT REPAIRS AND PROVE OPERATION OF NAVLIGHT INDICATOR/ALARM PANEL IN ACCORDANCE WITH 46CFR111.75-17(B).
Condition: Unknown
Due 16 August 1989
Resolved 16 August 1989
Navigation
Issued 16 August 1989
Resolved
EFFECT REPAIRS TO BOTH STBD SHAFT TACHOMETERS ON THE BRIDGE IN ACCORDANCE WITH 46CFR113.37-5.
Condition: Unknown
Due 16 August 1989
Resolved 16 August 1989
Electrical
Issued 16 August 1989
Resolved
REPLACE OR PROVIDE GUARDS ON THE MAIN SWITCHBOARD GROUND FAULT DETECTOR BULBS.
Condition: Unknown
Due 16 August 1989
Resolved 16 August 1989
Engineering
Issued 16 August 1989
Resolved
PROVIDE LAGGING ON EXHAUST SIDE OF BOTH MAIN ENGINE TURBOCHARGERS IN ACCORDANCE WITH 46CFR56.50-1(K).
Condition: Unknown
Due 16 August 1989
Resolved 16 August 1989
Navigation
Issued 16 August 1989
Resolved
REPAIR PORT SEARCHLIGHT SWITCH AND PROVE OPERATION OF SEARCHLIGHT.
Condition: Unknown
Due 16 August 1989
Resolved 16 August 1989
Navigation
Issued 12 April 1989
Resolved
PROVE CORRECT OPERATION OF RUDDER ANGLE INDICATOR IN THE PILOT HOUSE IN ACCORDANCE WITH 46 CFR 113.40-10(B).
Condition: Unknown
Due 12 April 1989
Resolved 12 April 1989
Fire Fighting
Issued 16 November 1988
Resolved
REPAIR/RENEW 3 COMBINATION NOZZLES 46CFR76.10-10(J)
Condition: Unknown
Due 16 November 1988
Resolved 16 November 1988
Electrical
Issued 16 November 1988
Resolved
CLEAR ELECTRICAL GROUNDS ON 440 VAC AND 120 VAC AND PROVE PROPER OPERATION OF GROUND DETECTION DEVICES ON SWITCH BOARD. 46CFR111.30-25(E)(1)
Condition: Unknown
Due 16 November 1988
Resolved 16 November 1988
Navigation
Issued 16 November 1988
Resolved
MAKE PERMANENT REPAIRS TO THE RUDDER ANGLE INDICATOR SYSTEM TO PROPERLY INDICATE POSITION OF THE RUDDERS. 46CFR77.05(A); 46CFR113.40-5
Condition: Unknown
Due 16 November 1988
Resolved 16 November 1988
Engineering
Issued 7 April 1988
Resolved
PROVE PROPER OPERATION OF THE OVERSPEED TRIPS AND THE LOW LUBE OIL PRESSURE TRIPS ON BOTH MAIN ENGINES IN ACCORDNACE WITH 46 CFR 61.20-3.
Condition: Unknown
Due 31 July 1988
Resolved 9 May 2002
Resolution: Corrected.
Electrical
Issued 7 April 1988
Resolved
PROVE PROPER OPERATION OF THE OVERSPEED TRIPS AND THE LOW LUBE OIL PRESSURE TRIPS ON BOTH SHIPS SERVICE GENERATOR ENGINES IN ACCORDANCE WITH 46 CFR 111.12-1.
Condition: Unknown
Due 31 July 1988
Resolved 9 May 2002
Resolution: Corrected.
Navigation
Issued 17 November 1987
Resolved
TUNE OR REPAIR VHF RADIO, REPLACE IF NECESSARY PRIOR TO VESSEL GOING INTO SERVICE. COMPLIANCE DATE IS 17DEC87
Condition: Unknown
Due 17 November 1987
Resolved 17 November 1987
Engineering
Issued 17 November 1987
Resolved
OVERHAUL AND TEST PORT MAIN ENGINE PRIOR TO VESSEL BEING PLACED IN SERVICE. COMPLIANCE DATE IS 17DEC87
Condition: Unknown
Due 17 November 1987
Resolved 17 November 1987
Navigation
Issued 17 November 1987
Resolved
PROVIDE COPY OF CERTIFICATE OF FINANCIAL RESPONSIBILITY PRIOR TO VESSEL BEING PLACED IN SERVICE. COMPLIANCE DATE IS 17DEC87
Condition: Unknown
Due 17 November 1987
Resolved 17 November 1987
Navigation
Issued 17 November 1987
Resolved
PROVIDE APPLICABLE PUBLICATIONS, 3 BLACK BALLS AND 2 NOT UNDER COMMAND LIGHTS PRIOR TO VESSEL BEING PLACED IN SERVICE. COMPLIANCE DATE IS 17DEC87
Condition: Unknown
Due 17 November 1987
Resolved 17 November 1987