← All vessels
BLUE DIAMOND
Freight Ship · Bulk Carrier class · Built 2000s · USCG Heartland District (CGD-H) · Other hulls named BLUE DIAMOND
BLUE DIAMOND is a 2008 freight ship. The Coast Guard has recorded 21 inspections since 2008, most recently in February 2025, along with 16 deficiencies and 3 operational controls.
Records from 2008 to 2025. Most recent: inspection, 14 February 2025.
- Built
- 2008
- Last inspected
- 14 February 2025
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 16 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9330654 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
A8KO6
942637
Flag
LIBERIA
—
Maury page id
psix-942637
Inspections, by type
…with no type recorded6
Years with a record
6 calendar years (2008–2025)
The 21 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Documentation record
Tonnage as PSIX records it18070 - Convention (Subpart B), Net Ton
53521 - Dead Weight, Metric Ton
65067 - Displacement, Metric Ton
32578 - Convention (Subpart B), Gross Ton
53521 - Dead Weight, Metric Ton
65067 - Displacement, Metric Ton
32578 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 21
14 February 2025
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8073102
30 January 2025
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8072950
21 January 2025
PSC A · Administrative Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8066744
20 January 2025
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8068936
8 August 2020
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7026992
6 August 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7025891
4 August 2020
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7024041
30 July 2020
Administrative Inspection
Administrative · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 7020298
20 February 2020
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6912155
19 March 2019
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6641164
29 July 2017
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6224119
29 July 2017
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6224819
29 July 2017
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6231114
18 July 2017
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6204832
2 October 2010
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3851100
15 June 2008
MARPOL Annex V Examination · Random ISPS/MTSA/PSC · Ballast Water Examination · MARPOL Annex I Examination
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3237725
9 June 2008
Administrative Inspection
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3232081
12 April 2008
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3182476
11 April 2008
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3183846
8 April 2008
PII Safety Exam · Ballast Water Examination · MARPOL Annex I Examination · ISPS II Exam · MARPOL Annex V Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3175628
5 April 2008
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3175642
Deficiency record · 16
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil discharge monitoring and control system
Issued 21 January 2025
Resolved
The 15 ppm Bilge Alarm should record date, time and alarm status, and operating status of the 15 ppm Bilge Separator. PSCO observed the oil recorded that the oily water separator was ran on 4JAN2025. When reviewing the history on the oil content meter the meter did not record being operated on 4JAN2025 it did record use on 2 JAN2025 and 15JAN2025. However, as previously reported by the vessel’s flag state the oil content meter was difficult to read.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 21 January 2025
Resolved
74 SOLAS (2004)
II-1/9.4.1.2.1
Doors and door frames in ‘‘B’’ class divisions and means of securing them shall provide a method of closure which shall have resistance to fire equivalent to that of the divisions. PSCO observed that the engine control room door was a class “C” door but the fir control plan listed the boundary as a class b boundary.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 21 January 2025
Resolved
In addition to complying with the specific provisions for fire
integrity of bulkheads and decks of cargo ships, the minimum fire integrity of bulkheads and decks shall be as prescribed in tables 9.5 and 9.6. PSCO observed that the CO2 room’sA-60 boundary was missing near the floor at the entrance to the space
and had been replaced with a metallic painted canvas.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 21 January 2025
Resolved
Fire protection systems and fire-fighting systems and appliances shall be maintained ready for use. PSCO discovered the portable foam system in the emergency generator room had a broken supply hose making the system inoperable.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 21 January 2025
Resolved
No electrical equipment shall be so installed in any space where flammable mixtures are liable to collect, e.g. in paint lockers or similar spaces, unless the ADM is satisfied that such equipment is: appropriately certified for the safe usage in the dusts, vapours or gases likely to be encountered. PSCO observed several cracked explosion proof lighting in paint locker and near bosun's locker.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 21 January 2025
Resolved
Water/weathertight conditions- efficient guard rails or bulwarks shall be fitted to all exposed parts of the freeboard and superstructure decks. PSCO observed holes in the guardrails due to rust and a bent section of the guardrails.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 January 2025
Resolved
Fire protection systems and fire-fighting systems and appliances shall be maintained ready for use. PSCO observed that the CO2 systems High Pressure CO2 system had a booster valve installed with a pilot valve pinned. The manual suppled by the vessel describes that booster valve serves to operate the power cylinder to the selector valve in a CO2 high pressure central bank system as well as a booster for the CO2 cylinder top valves in the case they should fail to operate. The manual provides a note that states “Always be sure that the safety pin if any, is removed from the booster valve with the installation is complete and the system is put into operation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 August 2020
Resolved
The machinery, boilers, and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequete for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot services and other hazards. PSCO conducted damage survey following propulsion irregularity and COTP 0345-20 dated 06AUG20. PSCO observed #1 STBD side and #2 PORT side heat exchangers on central low temp cooling water cooler with concretions and not maintained or cleaned in accordance with APV manufacturer manual. Heat exchangers in cooler shall be rectified to allow main engine to function properly. Provide pictures of process and results. Certificate issuing authority shall attest to operational readiness of main engine to include heating coolers on sea water side following the completion of heat exchange rectification. 74 SOLAS (2014) II-1/26.1 60ac.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 8 August 2020
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements. PSCO observed maintenance for heat exhangers on central low temp cooling water cooler was not being done in accordance with manufacturer's written procedures. Electronic maintenance procedures do not correlate with APV manufacturer manual. Company must provide corrective action plan for heat exchangers in central low temp cooling water cooler maintenance and cleaning. REccomend additional audit from certificate issuing authority. 74 SOLAS (2014) Ix/3.1 ISM Code 10.1 50ac.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 August 2020
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design & construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons onboard, due regard being paid to moving parts, hot services and other hazards. PSCO observed various slowdown alarms and pressure alarms in history when onboard to conduct a damage survey following propulsion irregularity and COTP 0336-20 dated 03AUG20. Provide certified technicians report attesting to issues relating to slow down alarms in previous history. 74 SOLAS (2014) II-I/26.1 60ac.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 4 August 2020
Resolved
The safety management system should include procedures ensuring that non-conformities are reported to the company. Chief Engineer stated there was a faulty exhaust gas temperature sensor(s) on the main engine. Chief Engineer stated spare parts onboard but did not report this to company even though he knew about this issue at last port. 74 SOLAS (2014) IX/3.1 & ISM Code 9.1 50 ac
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 August 2020
Resolved
Whenever there is a hazardous condition either on board a vessel or caused by a vessel or its operation, the owner, agent,master, operator, or person in charge must immediately notify the nearest Coast Guard Sector office. Vessel did not inform Coast Guard Sector New Orleans of hazardous situation identified in deficiency #2. Request corrective action plan with concurrence from administration.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 July 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship in all aspects will remain fit to proceed to sea without danger to the ship or persons on board.
Vessel lost propulsion and was unable to regain propulsion for unknown reasons while shifting berths in the Port of Brownsville.
-74SOLAS(04)I/11(a)
Fire Fighting › Fixed Fire Detection System › Flame Detectors
Issued 18 July 2017
Resolved
Detectors shall be periodically tested using equipment suitable for the types of fires to which the detectors is designed to respond. Vessel has flame detectors in engire room and no means to test.
74 SOLAS (14) 11.2/7.2.2
FSS Code 9.2.5.2
Communications › Alarms/Indicators › Rudder Angle Indicator
Issued 18 July 2017
Resolved
The ships steering gear shall be checked and tested by the ships crew: The rudder angle indicators in relation to the actual position of the rudder. Starboard side rudder angle indicator was not functioning.
74 SOLAS (14) 5/26.1.6
Construction/Loadline › Hull › Hull Plating
Issued 11 April 2008
Resolved
On 11APR08, an allision occurred when a free floating barge touched the forward starboard side of the vessel while the vessel was along side ADM Ama Grain Terminal. The vessel was restricted to the terminal until a damage report and CG-2692 was submitted.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.