Records from 2009 to 2026. Most recent: inspection, 15 July 2026.
Documentation record
Registered dimensions (L × B × D)297.6 ft × 54.0 ft × 13.0 ft
Registered tonnagegross 1,754 / net 1,754
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSOUTHWEST SHIPYARD LP · HOUSTON, TX, UNITED STATES · built 2009
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 10 April 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1754 - Simplified, Net Ton
1754 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 29
15 July 2026
Periodic Inspection · MTSA Verification · Vessel Attendance
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8438840
23 July 2025
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8192874
30 April 2024
Examination of Repairs · MTSA Verification · COI Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7894094
11 September 2023
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7789284
1 November 2022
Periodic Inspection · MTSA Verification · Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7587422
6 December 2021
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7363377
3 November 2021
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7344676
25 September 2020
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7065209
1 May 2020
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6946914
3 March 2020
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6919814
6 September 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6805391
24 July 2019
Internal Structural Exam · COI Inspection · Examination of Repairs · Drydock Exam · Cargo Tank Internal · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6743104
15 April 2019
Administrative Inspection · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6662403
9 April 2019
Drydock Extension
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6658679
1 August 2018
MTSA Verification · Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6498111
28 July 2017
Administrative Inspection · MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6223646
16 February 2017
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6089925
26 July 2016
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5953469
25 May 2016
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5886814
6 August 2015
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5208035
5 May 2014
Administrative Inspection · MTSA Verification · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4851016
14 September 2013
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4715245
22 May 2012
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4318840
13 June 2011
Examination of Repairs · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4040733
5 November 2010
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3885805
13 August 2010
In-Service Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3823060
23 June 2010
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3774965
12 April 2010
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3714738
4 March 2009
Cargo Tank Internal · Drydock Exam · Internal Structural Exam · MTSA Verification · Initial Certification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3427426
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 30 April 2024
Resolved
All marine engineering details, such as boilers, pressure vessels, main and auxiliary machinery, piping, valves, and fittings, shall be designed, constructed, and installed in accordance with the provisions of this subchapter. Throttle cable assembly on prime mover is in close proximity to uninsulated engine exhaust manifold, causing the exterior of throttle cable assembly to melt. Correct prior to cargo operations.
Action required: 705 - Other - as specified
Resolved 23 May 2024
Resolution: Attending marine inspector recieved photos attesting to satisfactory repairs to clear the 835, see vessel docs.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 November 2022
Resolved
Scantlings, materials and workmanship shall be at least equivalent to the requirements of ABS or other recognized classification society. Make permanent repair to sharp inset in way of the port side bow void and #5P wing void gunwale.
Action required: 705 - Other - as specified
Due 1 November 2022
Resolved 16 November 2022
Resolution: Repairs completed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 3 November 2021
Resolved
Scantlings, materials and workmanship shall be at least equivalent to the requirements of ABS or other recognized classification society. Make permanent repair to sharp inset in way of the #3P wing void gunwale, within 60 days. 46 CFR 32.60-1
Action required: 705 - Other - as specified
Due 3 January 2022
Resolved 9 December 2021
Resolution: Resolved to satisfaction of USCG.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 1 August 2018
Resolved
Prove proper operation of high level/overfill alarms prior to loading cargo.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 August 2018
Resolved 2 August 2018
Resolution: Alarms repaired and tested satisfactory.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 1 August 2018
Resolved
Repair or replace broken hinges on two closed gauging devices.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 August 2018
Resolved 2 August 2018
Resolution: Hinges replaced and verified adequate.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 1 August 2018
Resolved
Repair or replace exhaust lagging on cargo pump engine.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 August 2018
Resolved 2 August 2018
Resolution: Exhaust lagging installed.
Construction/Loadline › Hull › Double Hull
Issued 13 June 2011
Resolved
Crop and renew the (approx) 10' X 7' section of deck gunnel, stbd side in the #3 wing void.
Action required: 705 - Other - as specified
Due 15 July 2011
Resolved 13 July 2011
Documentation › Markings/Placards › Warning Signs
Issued 10 June 2011
Resolved
Re-label all "Danger Keep Out" hatch openings in accordance with 46 CFR 35.05-15 (b) (3) (ii).
Due 15 July 2011
Resolved 13 July 2011