Records from 2009 to 2025. Most recent: inspection, 3 September 2025.
Documentation record
Registered dimensions (L × B × D)139.2 ft × 110.0 ft × 12.5 ft
Registered tonnagegross 199 / net 135
ITC dimensions (L × B × D)139.2 ft × 110.0 ft × 12.5 ft
ITC tonnagegross 1,799 / net 539
BuilderBOCONCO INC · BAYOU LA BATRE, AL, UNITED STATES · built 2009
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 19 November 2025 · expires 30 November 2026
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it199 - Regulatory (Subpart C or D), Gross Ton
1799 - Convention (Subpart B), Gross Ton
135 - Regulatory (Subpart C or D), Net Ton
539 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 30
3 September 2025
Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8225899
15 April 2024
Internal Structural Exam · Drydock Exam · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7895740
31 October 2023
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7818349
8 June 2023
MARPOL Annex VI Survey · MTSA/ISPS Verification · MARPOL Annex I Examination · COI Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7700944
28 April 2022
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7439722
11 April 2022
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7428497
23 March 2022
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7417089
21 September 2021
Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7316985
27 May 2021
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7208353
5 November 2020
Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7090486
2 April 2019
Annual Inspection · Drydock Exam · MTSA Verification · Administrative Inspection · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6654473
11 February 2019
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6623580
19 June 2018
Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6449704
5 March 2018
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6366314
10 August 2017
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6236705
16 March 2017
Hull Examination · Administrative Inspection · Deficiency Check · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6105848
1 June 2016
MTSA/ISPS Verification · MARPOL Annex V Examination · MARPOL Annex IV Survey · MARPOL Annex I Examination · Annual Inspection · MARPOL Annex VI Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5894441
19 March 2014
Administrative Inspection · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4818537
6 June 2012
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4335744
18 May 2012
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4315027
16 May 2012
MARPOL Annex IV Survey · Administrative Inspection · MTSA/ISPS Verification · MARPOL Annex I Examination · MARPOL Annex VI Survey · Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4311960
22 February 2011
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3951134
27 January 2011
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3934327
19 October 2010
MTSA/ISPS Verification · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3932395
7 October 2010
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3865518
5 October 2010
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3865396
7 December 2009
Administrative Inspection · In-Service Inspection · Construction Oversight
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3698857
8 May 2009
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3470362
18 March 2009
Internal Structural Exam · Security Plan Review - VSP · Drydock Exam · Plan Review (Other than "T") · Administrative Inspection · MTSA/ISPS Verification · Ballast Water Examination · COI Inspection · Initial Certification · DAPI Audit · Construction Oversight · Hull Examination · Cargo Tank Internal
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3435486
5 March 2009
Plan Review (Other than "T")
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 3428373
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 3 September 2025
Resolved
Each propeller on a rescue boat must be fitted with a propeller guard with a maximum opening of 3in. on all sides on which a person is likely to be exposed. The rescue boat did not have a propeller guard.
46 CFR 133.135(a)
46 CFR 160.156-7(11)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 5 September 2025
Resolution: A prop guard for the rescue boat was purchased and installed.
01 - Certificates & Documentation › 013 - Documents › Garbage record book
Issued 3 September 2025
Resolved
The garbage record book along with receipts obtained from reception facilities shall be kept on board and readily available for inspection. Completed pages within the record book were not signed by the Master, and receipts from discharge to a reception facilities or vessels were not being obtained/ kept onboard. Receipts should be in the format specified in MARPOL Annex V appendix II - MEPC.1/Circ.834/Rev.1
MARPOL 73/78(2020 cons) Annex V / Reg. 10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 5 September 2025
Resolution: The Master was educated on the requirement to review/sign completed GRB pages, and the company generated a standard receipt that will be used for discharge to reception facilities.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 April 2022
Resolved
If a grounded distribution system is provided, there must be only one connection to ground; e-gen switchboard ground detection gauge displayed a 2 amp ground.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 May 2022
Resolved 29 April 2022
Resolution: Vessel located ground fault on electric motor and has invoice for new motor.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 28 April 2022
Resolved
Every ship of 400 gross tons and above shall maintain an Oil Record Book per the Oil Record Book instructions; Oil Record Book quantities were not consistently recorded. [name withheld], [name withheld], and Vessel Rep.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 28 April 2022
Resolution: Master, Chief engineer and Vessel Rep informed of requirement for consistent quantities to be logged.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 April 2022
Resolved
Annual inspection's scope is to include fire hazards; discovered fuel small fuel leak at the starboard jacking thruster and small hydraulic leaks from hydraulic lines on both port and starboard rudders, rectified on the spot.
46 CFR 126.510(a)
46 CFR 126.430
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 28 April 2022
Resolution: Connections tightened, leaks cleaned to the satisfaction of the MI.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 21 September 2021
Resolved
Disposable hydrostatic release past expiration date.
Action required: 10 - Deficiency Rectified
Due 21 September 2021
Resolved 21 September 2021
Resolution: Purchased and installed new hydrostatic release
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 September 2021
Resolved
Jacking gear hydraulic low level alarm not producing an audible alarm
Action required: 10 - Deficiency Rectified
Due 21 October 2021
Resolved 21 September 2021
Resolution: Wiring re-installed and operation proved to CGMI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 21 September 2021
Resolved
Port MDE high temp alarm inoperable
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 September 2021
Resolved 1 October 2021
Resolution: installed and tested new alarm
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 5 November 2020
Resolved
Your vessel must undergo an annual inspection within 3 months before or after each anniversary date.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 November 2020
Resolved 5 November 2020
Resolution: Conducted annual inspection
Construction/Loadline › Hull › Hull Plating
Issued 17 March 2017
Resolved
Section of aft leg rack damaged from previous event including pinions.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 26 June 2018
Resolution: Completed repairs to aft leg & rack. All tests complete.
Documentation › Manuals/Policy Documentation › Stability Instructions
Issued 19 October 2010
Resolved
Submit new operations manual, stability letter, and tonnage certificate (if required by class).
Action required: 17 - Rectify deficiencies prior to departure
Due 19 November 2010
Resolved 19 November 2010
Communications › Alarms/Indicators › Bilge Alarm
Issued 19 October 2010
Resolved
Raise volume on bridge high water alarms.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 19 November 2010
Resolved 19 November 2010
Operations/Management › Drills/Instruction › Fire
Issued 19 October 2010
Resolved
Provide training and drills to all crew members on proper donning of fire suits.
Action required: 705 - Other - as specified
Due 19 November 2010
Resolved 19 November 2010
Construction/Loadline › Structures › Superstructure
Issued 19 October 2010
Resolved
Provide results of satisfactory class test of pre-load, leg tracking systems and alarms.
Action required: 17 - Rectify deficiencies prior to departure
Due 19 November 2010
Resolved 19 November 2010
Communications › Alarms/Indicators › Fire Alarm
Issued 19 October 2010
Resolved
Install fire alarm 2 minute switch to general alarm device required by SOLAS (if fire alarm not acknowledged).
Action required: 705 - Other - as specified
Due 19 November 2010
Resolved 19 November 2010
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 19 October 2010
Resolved
Provide/install chain for sewage discharge overboard valve.
Action required: 17 - Rectify deficiencies prior to departure
Due 19 November 2010
Resolved 19 November 2010
Operations/Management › Drills/Instruction › Fire
Issued 19 October 2010
Resolved
At fire station #5, fire control plan needs marking and prove plan is inside case (unable to open).
Action required: 705 - Other - as specified
Due 19 November 2010
Resolved 19 November 2010
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 19 October 2010
Resolved
Provide signal light and method to charge signal light battery on rescue boat.
Action required: 17 - Rectify deficiencies prior to departure
Due 19 November 2010
Resolved 19 November 2010
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 19 October 2010
Resolved
Install containment around deck fuel transfer hose. 1/2 bbl // 21 gal
Action required: 705 - Other - as specified
Due 19 November 2010
Resolved 19 November 2010
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 19 October 2010
Resolved
Prove deck transfer hose is of an approved type.
Action required: 705 - Other - as specified
Due 19 November 2010
Resolved 19 November 2010
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 19 October 2010
Resolved
Amend transfer procedures to include deck fuel transfers.
Action required: 705 - Other - as specified
Due 19 November 2010
Resolved 19 November 2010
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 18 March 2009
Resolved
Within 30 days, provide an approved copy of the SOPEP to Sector Mobile prior to departing on any international voyage.
Action required: 705 - Other - as specified
Due 23 April 2009
Resolved 18 March 2009