Records from 2016 to 2022. Most recent: inspection, 27 September 2022.
Inspection history · 51
27 September 2022
Appeal
Administrative · Commandant (CG-CVC) · Activity 7581751
24 August 2022
Appeal · PSC B · MARPOL Annex I Examination · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7540720
22 June 2022
In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7483798
15 April 2022
PSC B
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7429701
23 March 2022
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7417139
19 March 2022
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7414744
3 March 2022
In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7404940
26 January 2022
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7386170
3 January 2022
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7374924
2 January 2022
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7374595
25 August 2021
PSC A · Ballast Water Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7292715
18 April 2021
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7177461
30 March 2021
PSC B
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7164925
15 March 2021
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7156556
23 December 2020
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7115545
25 November 2020
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7102047
24 October 2020
PSC B · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7082251
21 October 2020
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7081985
17 October 2020
Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7078961
10 October 2020
PSC B
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7072629
14 September 2020
In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7058080
10 August 2020
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7029226
12 July 2020
PSC B
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6998517
13 March 2020
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6926154
6 March 2020
PSC B
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6920358
29 February 2020
Deficiency Check · PSC B
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6916139
23 February 2020
PSC A · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6912953
23 February 2020
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6916437
9 February 2020
PSC B · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6904954
30 January 2020
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6899551
25 January 2020
PSC B
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6894069
19 January 2020
Ballast Water Examination · Deficiency Check · PSC B
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6890830
8 November 2019
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6853907
28 July 2019
Deficiency Check · In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6763202
10 April 2019
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6660047
9 March 2019
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6639986
2 March 2019
ISPS III Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6631568
4 November 2018
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6574176
31 October 2018
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6571994
27 August 2018
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6524557
20 August 2018
PII Safety Exam · ISPS III Exam · Ballast Water Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6516278
5 April 2018
Deficiency Check · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6385617
28 March 2018
Ballast Water Examination · NPV Safety Exam · ISPS III Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6379269
28 March 2018
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6380774
10 January 2018
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6335346
8 January 2018
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6333934
29 December 2017
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6330117
29 December 2017
In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6332920
11 October 2017
PII Safety Exam · Ballast Water Examination · ISPS II Exam · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6286009
11 October 2017
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6288522
16 December 2016
ISPS II Exam · Ballast Water Examination · PII Safety Exam · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6059034
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 5 September 2022
Resolved
Except as provided in paragraph 3 of this regulation, any ship of 400 gross tonnage and above but less than 10000 gross tonnage shall be fitted with oil filtering equipment complying with paragraph 6 of this regulation. Chief Engineer stated the Oil Water Separator overboard discharge pipe is clogged. Return the overboard discharge valve to fully operational status.
MARPOL Annex I/14.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 21 November 2022
Resolution: Vessel provided objective evidence of the repairs. OWS discharge pipe replace at drydock in Panama.
01 - Certificates & Documentation › 011 - Ships Certificates › Safety Management Certificate (SMC/ ISM)
Issued 24 August 2022
Resolved
The company should establish a safety and environmental protection policy which describes how the objectives given in paragraph 1.2 will be achieved. The objective nature of deficiencies 02, 03, and 04 demonstrate the vessel is not being maintained to international standards, bringing into question the validity of the Safety Management Certificate issued pursuant to the ISM Code. An external audit is required to be submitted prior to departure from port.
74SOLAS(2020) IX/3.1
ISM A/10.1
30abc
Condition: Invalid
Action required: 30 - Ship detained
Resolved 10 September 2022
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 24 August 2022
No resolution recorded
The Oil Record Book Part 1 shall be completed on each occasion, on a tank-to-tank basis if appropriate, whenever any of the following machinery space operations take place in the ship. PSCO observed missing oil record book entries to include bunkering entry on 24JUL2022, oil water separator entries and weekly tank soundings.
MARPOL Annex 1/17.2
30abc
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 24 August 2022
Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met: Means shall be provided to control leaks of flammable liquids. PSCOs discovered lagging on numerous fuel oil service pipes to be lasted or excessively soaked in oil presenting a fire hazard.
74SOLAS(2020) II-2/4.1.1
30abc
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 5 September 2022
Resolution: Oil soaked lagging was replaced.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 24 August 2022
Resolved
Portable fire extinguishers shall comply with the requirements of the Fire Safety Systems Code. All fire extinguishers shall be of approved types and designs based on the guidelines developed by the organization. Portable fire extinguishers were last serviced in March 2021.
74SOLAS(2020) II-2/ 10.3.1
30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 5 September 2022
Resolution: Fire extinguishers recieved proper servicing.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 24 August 2022
Resolved
The following arrangements shall be tested in accordance with the Fire Test Procedures Code: Fire dampers, including their relevant means of operation. Fire damper in purifier room could not be closed.
74SOLAS(2020) II-2/9.7.1.2.1
17ac
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 September 2022
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 24 August 2022
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed. Hydraulic start on emergency generator failed to start.
74SOLAS(2004) II-1/ 26.1
10c
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 24 August 2022
14 - Pollution Prevention › 141 - MARPOL Annex I › Retention of oil on board
Issued 24 August 2022
Resolved
A ship when in port or an offshore terminal of another party is subject to inspection by officers duly authorized by such party concerning operational requirements under this Annex, where there are clear grounds for believing that the master and crew are not familiar with essential shipboard procedures relating to the prevention of pollution by oil. PCSOs observed vessel's crew taking tank soundings through oil purifier drain port instead of tank sounding tube/port. Provide training on tank sounding procedures for all personnel involved in tank sounding operations.
MARPOL ANNEX I/11.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 September 2022
14 - Pollution Prevention › 141 - MARPOL Annex I › Retention of oil on board
Issued 24 August 2022
No resolution recorded
Oil residue tanks shall be of adequate capacity to receive oil residues which cannot be dealt with otherwise IAW the requirement of this Annex; tanks shall be designated and constructed so as to facilitate their cleaning and discharge of residue to reception facilities. PSCOs observed inaccurate tank levels in ORB, when compared to tank sounding. Clean all tanks listed on IOPP and provide accurate tank sounding.
MARPOL ANNEX I/12.3.5
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
01 - Certificates & Documentation › 011 - Ships Certificates › Safety Management Certificate (SMC/ ISM)
Issued 24 August 2022
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations. Class society conducted an external ISM
Audit on 26/08/2022 with an observation, as the objective evidence (ORBs, ENG Logs, Sounding Records etc.) was in the possession of the USCG. Objective evidence is now in the possession of the Ship/company and available for examination by class. An additional external audit is required to be completed by class to address listed observation and submitted prior to departure from port in order to meet the requirements of deficiency 01 issued on 8/24/2022.
74 SOLAS(2020) IX/3.1
ISM A/10.1
Action required: 30 - Ship detained
Resolved 10 September 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 June 2022
Resolved
Condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
Vessel's Low Temperature Plate Cooler is leaking due to unsuccessful repair from routine maintenance. Vessel is required to provide class survey upon repair.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 July 2022
Resolution: See attached class report.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 30 March 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Water tight door in oil purifier room was found inoperable, handle broken off. 74 SOLAS (04) I/11
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 April 2021
Resolved 18 April 2021
Resolution: Vessel crew repaired the door by installing a new handle. Class examined the repairs made by the crew and certified its condition satisfactory.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 24 October 2020
Resolved
A second source of energy shall be provided for an additional three starts within 30 min unless manual starting can be demonstrated to be effective. PSCO found accumulator supply line fitting leaking for ships emergency generator.
74 SOLAS (2009) II-1/44.2 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 31 October 2020
Resolution: Class surveyor found the Hydraulic accumulator line was repaired and the test of the EDG was successfully completed. See Class Report in Documents
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 October 2020
Resolved
Lighting fittings shall be so arranged as to prevent temperature rises which could damage the cables and wiring, and to prevent surrounding material from becoming excessively hot. E/R lighting diffuser in way of the shaft generator found melted.
6.1 Each separate circuit shall be protected against short circuit and against overload, except as permitted in regulations 29 and 30 or where the Administration may exceptionally otherwise permit. Emergency fire pump found with multiple loose wiring dead end circuits, not properly terminated.
1.3 All electrical apparatus shall be so constructed and so installed as not to cause injury when handled or touched in the normal manner. Rescue boat launching station found with missing threaded cap for control box connection and live power source.
74 SOLAS (2009cons.) II-1/45. 16ac
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2020
Resolved 31 October 2020
Resolution: As per Class surveyors report, light diffuser was changed and found satisfactory. Loose wires were found to be without power, wires were properly wrapped and secured. Threaded cap was replaced on rescue boat and found satisfactory.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 24 October 2020
Resolved
The arrangement of ventilation inlets and outlets and other deckhouse and superstructure boundary space opening shall be such as to complement the provisions of paragraph 5.3 and regulation 11.6. PSCO's found CO2 room fixed ventilation opening and harbor crew toilet fixed ventilation opening wasted.
SOLAS (2009cons.) II-2/4 5.2.6 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 November 2020
Resolved 31 October 2020
Resolution: Class surveyor found and replaced ventilation screens and diffusers. See Class Report in Documents.
14 - Pollution Prevention › 141 - MARPOL Annex I › Standard discharge connection
Issued 24 October 2020
Resolved
To enable pipes of reception facilities to be connected with the ship's discharge pipeline for residues from machinery bilges and from oil residue (sludge) tank, both lines shall be fitted with a standard discharge connection. PSCO's found port side sludge connection wasted, in way of bunker station.
MARPOL 73/78 Annex I/13
SOLAS 74 (2009cons.) I/11 16ac
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2020
Resolved 31 October 2020
Resolution: As per Class surveyors report, sludge tank connectors valve packing were replaced and satisfactory. See Class Report in Documents.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 24 October 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or person on board. PSCO's found port side sewage connection wasted, in way of the bunker station.
74 SOLAS (2009cons.) I/11 (a)
33 CFR 159.7 16ac
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2020
Resolved 31 October 2020
Resolution: Sewage discharge packing bolts were replaced and found satisfactory. See Class Report in Documents.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 24 October 2020
Resolved
(c) The ballast water report required by paragraph (b) of this section must include the following information: vessel's total ballast water capacity. PSCO noted reports being submitted to NBIC contained incorrect ballast water tank capacities. Ship to provide amended ballast water report to reflect correct capacities. In addition, local OCMI to review next NBIC submission prior to next arrival.
33 CFR 151.2065(c)(3) 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 7 November 2020
Resolved 30 October 2020
Resolution: Ballast water report submitted to USCG after review found to be corrected and in compliance.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 October 2020
Resolved
SOLAS 74(2014) II-1/26.
1 The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards.
II-1/26.
3 Means shall be provided whereby normal operation of propulsion machinery can be sustained or restored even though one of the essential auxiliaries becomes inoperative. Special consideration shall be given to the malfunctioning of:
.6 The sources of water pressure
Port State Control Officers observed repairs being made while attending vessel, to ballast water/cooling pipe in E/R. A crack was discovered at a connection flange after close up inspection of removed piping and components. System also serves as secondary cooling through cross connections in system. Repairs to be made with report from Class of any findings prior to vessel movement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 October 2020
Resolution: Received BV Report No: TPA0/2020/J5561 for deficiency clearance.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 10 October 2020
Resolved
Each emergency generating set arranged to be automotically started shall be equipped with starting devices approved by the administation with a stored energy capability of at least ghree consecutive starts. PSCO observed the primary battery start did not start the emergency generator.
SOLAS II-1/44.2
Action required: 17 - Rectify deficiencies prior to departure
Due 10 October 2020
Resolved 12 October 2020
Resolution: Class report issued for battery install and satisfactory test of generator start.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 September 2020
Resolved
THE MACHINERY AND ASSOCIATED FITTINGS SHALL BE OF A DESIGHN ADEQUATE FOR THE INTENDED SERVICE. VESSELS MAIN PROPULSION CONTROLLABLE PITCH PROPELLER SYSTEM DOES NOT FUNCTION AS PER DESIGN. INDICATOR READS ZERO PITCH WHILE VESSEL HAS MOVEMENT ASTERN.
74SOLAS(04) II-1/26.1 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 14 September 2020
Resolved 26 September 2020
Resolution: Vessel submitted Surveyor report stating that vessel had rectified deficiency by replacing the Servo Controller. Surveyor report in documents.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 14 September 2020
Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PRESENT REGULATIONS TO ENSURE THE SHIP IN ALL RESPECTS REMAINS FIT. SHIP'S PORT SIDE ACCOMODATION LADDER WAS SEVERELY DAMAGED WHILE IN PORT.
74SOLAS(04)I/11a
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2020
Resolved 15 March 2021
Resolution: Received class report attesting to the repairs and good working order of the Port side Accommodation Ladder. See documents.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 12 July 2020
Resolved
Structural fire protection shall be kept in good order so as to ensure their required performance if a fire occurred. PSCO observed significant degradation of the vapor barrier in the paint locker.
74SOLAS(14) II-2/14.2.1 50ac
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2020
Resolved 10 August 2020
Resolution: The bulkhead insulation was replaced and new protective covering was installed.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 12 July 2020
Resolved
Each life raft shall be stowed with a float free arrangement complying with the requirements of paragraph 4.1.6 of the code so that it floats free. PSCO observed the painter line not connected to the weak link.
74SOLAS(14) II/13.4.2 10c
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 12 July 2020
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 12 July 2020
Resolved
The means for securing and maintaining weathertightness of hatchway covers shall be to satisfaction of the administration. 01 cargo hold-down device bent and incapable of locking.
ICLL (66) I/16 50ac
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2020
Resolved 10 August 2020
Resolution: Cargo hatch hold was cropped and renewd. Documents attached to activity.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 12 July 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with present regulations to ensure the ship will remain fit to proceed to sea without danger to persons on board. The material condition of lagging IVO the sludge tank was degraded and missing.
74SOLAS(14) I/11 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 12 July 2020
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 12 July 2020
Resolved
All electrical apparatus shall be so constructed and so installed as not to cause injury when handled or touched in the normal manner. PSCO observed the protective cover was missing.
74SOLAS(04)II-1/45.1.3 10c
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 12 July 2020
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 6 March 2020
Resolved
Machinery shall be protected as to reduce to a minimum any danger to persons on board, due regard being given to moving parts. Port State Control Officers observed missing protective machinery cover on the number one and two low temperature cool water pumps in the starboard side of the engine room.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 6 March 2020
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 29 February 2020
Resolved
Before the ship leaves port and at all times during the voyage, all life saving appliances shall be in working order and ready for immediate use. Port State Control Officers observed aft free fall life boat engine unable to start. Engineer determined the fault was due to a bad contact on the accumulator battery, and was repaired prior to exam completion. 74SOLAS(14)III/20.2
Action required: 17 - Rectify deficiencies prior to departure
Due 29 February 2020
Resolved 29 February 2020
Resolution: Corrected prior to exam completion
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 23 February 2020
Resolved
In cargo ships of 1000 GT and upwards, shall provide fire hoses for each 30m of length of ship. Each hose shall be provided together with any necessary fitting or tools. PSCO observed missing fire hose station at bay 25 portside. PSCO also observed multiple fire hose stations missing spanner wrenches.
74SOLAS(04)II-2/10.2.3 17c
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 23 February 2020
Resolved 23 February 2020
Resolution: Hose station was installed in-kind and missing spanner wrenches replaced.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 23 February 2020
Resolved
Doors fitted in boundary bulkheads of machinery spaces of category A, shall be reasonably gas tight and self closing. PSCO observed fire doors M03, T04, and T04-1 not self closing.
74SOLAS(04) II-2/9.4.2.1 40ac
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 February 2020
Resolution: Listed deficient doors were witnessed as operational.
10 - Safety of Navigation › N/A - No Subsystem › Navigation records
Issued 23 February 2020
Resolved
No person may cause a vessel to enter into or get underway on the navigable waters of the U.S unless no more than 12 hrs before entering or getting underway, the following equipment has been tested: 1) standby or emergency generator 2) storage batteries for emergency lighting and power systems in vessel control and propulsion machinery spaces 3) main propulsion machinery, ahead and astern. Testing of emergency generator, emergency storage batteries and and main propulsion machinery were not required to be tested in their SMS checklist 7.1.1, 7.1.3, and 7.4.4.
33 USC 1221/33CFR164.25 40c
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 February 2020
Resolution: PSCO verified pre-arrival test was conducted on latest arrival, and checklist in the deck log book was verbatim from the applicable CFR.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 23 February 2020
Resolved
The means for securing and maintaining weather tightness shall be to the satisfaction of the administration. Arrangements shall ensure that the tightness can be maintained in any sea condition. Anchor chain lockers found with minimal hardware holding access cover in position.
ICLL 88P/16(6) 16ac
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 March 2020
Resolved 25 February 2020
Resolution: Anchor chain locker hatch covers were securely bolted in place with proper amount of hardware.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 23 February 2020
Resolved
Efficient guard rails and bulwarks shall be fitted to all exposed parts of the freeboard and superstructure decks. As well as satisfactory means shall be provided for protection of the crew in transiting to and from crew quarters and all parts of ship for necessary work. Substantial wastage was noted on cargo ladders on both port and starboard from bay 1 to bay 29. Fiberglass deck grating also found damaged on port side bay 11, 17, 19, 22.
ICLL 88P/25 16ac
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 March 2020
Resolved 13 March 2020
Resolution: Coast Guard recieved class report to the repaires of fiberglass deck grating and wastage of cargo ladders.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 23 February 2020
Resolved
All electrical apparatus shall be be so constructed and so in insulated as to not cause injury when handled or touched. Dead end wires found on foc'sle (starboard side,) emergency generator room faceplate, main deck engine junction box, and junction box in vicinity of oily water separator, multiple openings on electricians testing station control cabins in engine control room propped open for temporary cable connection.
74SOLAS(04) II-1/45.1.3 16ac
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 March 2020
Resolved 29 February 2020
Resolution: Permanent repairs verified.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 23 February 2020
Resolved
Cargo ships shall carry at least one rescue boat complying with the regulations of section 5.1 of the code. LSA code 4.4.1.1 states all lifeboats shall be properly constructed and shall be of such form and proportions that they have ample stability assuring no loss of buoyancy material and no other damage. PSCO noted the rescue boat on board had damage on the tip of the bow.
74SOLAS(04)III/31.2 16ac
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 March 2020
Resolved 29 February 2020
Resolution: PSCO observed proper repair on rescue boat completed by a certified fiberglass technician.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 February 2020
Resolved
This regulation is to prevent the ignition of combustible material or flammable liquids. Means shall be provided to control leaks of flammable liquids. The ignitability of flammable material shall be restricted. 1) PSC observed a coating on many electrical cables and wire runs. This coating is unknown to crew and class. Request lab testing of coating substance to determine flammability. 2) The crane hydraulic oil reservoir in steering gear room has oil in the cofferdam, there is no plug in the cofferdam.
74SOLAS(04)II-2/4.1.1 16ac
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 March 2020
Resolved 29 February 2020
Resolution: PSCO observed previously sighted oil cleaned up. Master provided documentation of the coating of the electrical cable in the engine room. Coating was non-flammable lubricant used during the construction of the ship.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 February 2020
Resolved
Associated piping for Machinery shall be of a design and construction adequate for the service for which they are intended and shall be installed and protected to reduce to a minimum any danger to persons onboard, PSCO observed a temporary repair (soft patch) on the water line to the stern tube.
74SOLAS(04)II-1/26.1 16ac
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 March 2020
Resolved 29 February 2020
Resolution: PSCO observed effective permanent repair in place.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 23 February 2020
Resolved
Ships shall be designed, constructed and maintained in compliance with structural requirements of the class society. Approximate 6" crack found aft of port side anchor wash remote operated valve on foc'sle.
74SOLAS(04)II-1/3-1 50ac
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 March 2020
Resolved 13 March 2020
Resolution: Coast Guard recieved class report of repaired 6" crack in foc'sle.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 23 February 2020
Resolved
The company shall ensure that all personnel involved in the company safety management system, SMS, have an adequate understanding of relevant rules, regulations, codes, and guidelines. PSCO observed several locations in machinery spaces that had electrical equipment tagged out. Lock out, tag out SMS checklist #7.5 was not being followed. In general crew members shared a general lack of understanding of SMS requirements and procedures. Recommended ISM Document of Compliance audit.
74SOLAS(14)IX/3 ISM Code 6.4 50ac
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 March 2020
Resolved 29 February 2020
Resolution: PSCO observed completion of permanent wiring and adherence to the tag-out portion of SMS.
05 - Radio Communications › N/A - No Subsystem › Reserve source of energy
Issued 23 February 2020
Resolved
Electrical instillations shall be such that electrical services essential for safety will be ensured under various emergency conditions. PSCO discovered loose connections on backup GMDSS batteries.
74SOLAS(04)II-1/40.1.2 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 23 February 2020
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 23 February 2020
Resolved
Escape routes shall be maintained in a safe condition, clear of obstacles. PSCO observed a vacuum and a standard sized barrel blocking an escape ladder in the steering gear room.
74SOLAS(04)II-2/13.1.2 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 23 February 2020
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 23 February 2020
Resolved
Main and emergency switchboards shall be so arranged as to give easy access as may be needed to apparatus and equipment, without danger to personnel. PSCO observed assorted equipment stored behind main switchboard in ECR.
74SOLAS(04)II-1/45.2 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 23 February 2020
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 9 February 2020
Resolved
The means for securing and maintaining weathertightness of hatchway covers shall be to the satisfaction of the administration. 18 out of 60 cargo hold-down devices were broken and incapable of locking. Vessel requested parts in June, 2019 and followed up in October, 2019 with no response from the company.
ICLL(66) I/16 - 17ac
Action required: 17 - Rectify deficiencies prior to departure
Due 9 February 2020
Resolved 29 February 2020
Resolution: PSCO observed proper repairs made, and reviewed a class report attesting to such.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 9 February 2020
Resolved
Efficient guard rails shall be fitted to all exposed parts of the freeboard. Vessel had deteriorated and missing sections of rails near the starboard side liferafts and near the bow, cargo hatch 1A.
ICLL(66) I/16 - 16ac
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 February 2020
Resolved 23 February 2020
Resolution: Class and CG verified missing railings were replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 9 February 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with present regulations to ensure the ship will remain fit to proceed to sea without danger to persons onboard. The material condition of lagging in the incinerator, fuel purifying, and engine room was degraded and missing.
74 SOLAS (14) I/11 - 16ac
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 February 2020
Resolved 23 February 2020
Resolution: Class and CG verified replaced laggin.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 25 January 2020
Resolved
The company and the ship shall comply with the requirements of the ISM Code. The company should establish procedures to ensure the ship is maintained in conformity with relevant rules and regulations. PSCO observed a lack of maintenance for the ship and its equipment, especially regarding the engine room, structural fire protection, and lifesaving equipment. SMS "7.7 Risk Assessment S-07 refers to Safe Work Practices 20.3.2, 20.3.5, and 20.3.6 which requires various maintenance of oil leakages in machinery spaces. Objective evidence revealed through SMS "7.4.1 Daily Tests & Checks" which requires oil leakage inspection (item 1) among other entries and completion must be entered into ships daily logs. Active leaks in engine room do not reflect the checklist is being completed or logged. Recommend ISM Audit.
74SOLAS(14)IX/3.1, ISM A/10.1, 30abc
Action required: 30 - Ship detained
Resolved 26 January 2020
Resolution: PSCO's have received and review Class and Flag documentation, followed by visit to vessel and examination of corrected deficiencies.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 25 January 2020
Resolved
Means shall be provided to control the leaks of flammable liquids. PSCO observed excessive accumulation of flammable liquids throughout engine room. Pooling was noted all along main engine, IVO two ships generators, and in the bilges. Oil soaked lagging was also observed in several locations. General condition of the engine room posed an immediate fire and safety hazard to the ship and crew.
74SOLAS(14)II-2/4.1.1, 30abc
Action required: 30 - Ship detained
Resolved 26 January 2020
Resolution: PSCO's have received and review Class and Flag documentation, followed by visit to vessel and examination of corrected deficiencies.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 January 2020
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO observed cracked life buoys with crumbling exposed buoyant material, missing plugs, degraded retro-reflective tape, dry-rotted line, and degraded color. PSCO confirmed required weekly and monthly checks are being performed, however buoys were not annotated as being deficient.
74SOLAS(14)III/20.2, 17abc
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 January 2020
Resolution: PSCO's have received and review Class and Flag documentation, followed by visit to vessel and examination of corrected deficiencies.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 25 January 2020
Resolved
Structural fire protection (SFP) shall be kept in good order so as to ensure their required performance if a fire occurred. PSCO observed significant degradation of SFP in the CO2 room to include missing insulation, penetration packing falling apart, and worn/missing sections of vapor barrier.
74SOLAS(14)II-2/14.2.1.1.1, 16ac
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 February 2020
Resolved 26 January 2020
Resolution: PSCO's have received and review Class and Flag documentation, followed by visit to vessel and examination of corrected deficiencies.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 19 January 2020
Resolved
Each emergency generating set arranged to be automatically started shall be equipped with starting devices approved by the administration. A second source of energy shall be provided for an additional three starts within 30 mins unless manual starting can be demonstrated to be effective. Vessel's hydraulic manual starting was not operational.
SOLAS 74(2009) Ch II-1 Reg 44.2 - 17a
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 19 January 2020
Resolved 19 January 2020
Resolution: The pump was replaced by spare pump from ship's inventory and Class verified the manual start was operational and the emergency generator was fully functional.
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Equipment (including exemption)
Issued 19 January 2020
Resolved
Such certificates shall be accepted unless there are clear grounds for believing that the condition of the ship or of it's equipment does not correspond with the particulars of any certificate or that the ship and its equipment are not in compliance. Vessel's Cargo Ship Safety Equipment Certificate Form E states the vessel is equipped with one 20 person life raft, two 26 person life rafts, and two 6 person life rafts required by III/31.1.4 Vessel is equipped with two 20 person life rafts and one 6 person life raft on the bow which does not conform with the Form E.
SOLAS 74(2014) Ch I Reg 19(b) - 50a
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 February 2020
Resolved 19 January 2020
Resolution: Class updated the Safety Equipment Certificate Form E to correspond with reality.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 28 July 2019
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Rescue boat and associated lifting appliances were damaged.
74SOLAS(14) III/20.2 17ac
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Due 28 July 2019
Resolved 1 August 2019
Resolution: Coast Guard, in a attendance with Class BV, and repair facility representatives, witnessed satisfactory static and dynamic load tests.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 28 July 2019
Resolved
Guard rails or bulwarks shall be fitted around all exposed decks. Lowest course of guard rail forward of port side davit-launched life raft was found wasted.
ICLL (Proto 88) 25/2 50ac
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 August 2019
Resolved 1 August 2019
Resolution: Cleared to the satisfaction of class and Coast Guard.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 2 March 2019
Resolved
Embarkation stations shall be readily accessible from accommodation stations and work areas.
Deck passage forward of the starboard life raft is blocked by spare piping.
74SOLAS(14) III/11.3
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Due 3 March 2019
Resolved 9 March 2019
Resolution: Spare pipes had been removed from Embarkation area and kept in E/R Work Shop.
The embarkation stations are maintained in satisfactory condition.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 2 March 2019
Resolved
Life saving appliances shall be marked with the date by which they must be replaced.
All three VHF two-way radios were not replaced by expiration date of January 2019.
74SOALS(14) III/34 Ref. LSA I/1.2.3
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2019
Resolved 9 March 2019
Resolution: Three new sets of VHF two way radio (Entel HT649) were delivered onboard - battery
packs expired March 2023.
10 - Safety of Navigation › N/A - No Subsystem › Voyage data recorder (VDR)/Simplified Voyage data recorder(S-VDR)
Issued 2 March 2019
Resolved
The administration shall be satisfied that the performance of the equipment required by chapter V is maintained.
Voyage data recorder battery expired February 2019.
74SOLAS(14) V/16.1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2019
Resolved 9 March 2019
Resolution: Expired VDR battery was replaced by new - new battery valid until December 2021.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 2 March 2019
Resolved
Whenever a defect is discovered which substantially affects the efficiency of the equipment covered by Annex I, the master or owner of the ship shall report at the earliest opportunity to the administration or recognized organization, who shall cause investigations to be initiated.
The Oily water separator's through-put, according to the oil record book, is approximately 0.2m^3/hr, which is significantly less efficient than the 2.5m^3/hr listed on the IOPP supplement. As a result, the oily bilge water holding tank is almost full, and oily water is being retained in the bilge well below the shaft seal.
MARPOL I/6.4.3
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 March 2019
Resolved 9 April 2019
Resolution: Received class report attesting to proper repair.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 2 March 2019
Resolved
All ships of 300 GT and upwards shall have a 9GHz radar.
The ship's 9Ghz radar is inoperable.
74SOLAS(14) V/19.2.3.2
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 April 2019
Resolved 9 April 2019
Resolution: Received class report attesting to proper repair.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 2 March 2019
Resolved
Every ship shall be provided with a receiver capable of receiving NAVTEX broadcasts.
NAVTEX receiver is inoperable.
74SOLAS(14) IV/7.1.4
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 April 2019
Resolved 9 March 2019
Resolution: New Navtex Receiver (JRC, Model NCR-333) was installed and functional.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 21 August 2018
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. Vessels emergency firepump is inoperable. Rectify deficiency by 27AUG18, prior to departing Jacksonville. 74SOLAS(04) II-2/14.2.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 August 2018
Resolved 27 August 2018
Resolution: Attended vessel to witness operational test of emergency fire pump. Test completed satisfactorily. Class to attend at next port of Port Everglades to verify also.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 20 August 2018
Resolved
Firefighting systems and appliances shall be kept in good working order and readily available for immediate use. Class survey to verify equivalent safe means of firefighting until emergency pump is repaired. Vessel has previously notified Flag and company. USCG Sector Jacksonville must approve plan prior to departing the port. 74SOLAS (04 CON) II-2/14.2.1.2:
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 August 2018
Resolved 21 August 2018
Resolution: Received Class report to satisfy requiremnet.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 20 August 2018
Resolved
Satisfactory means (in the form of guard rails, lifelines, gangways, etc.) shall be provided for the protection of the crew in the necessary work of the ship. Observed numerous grating areas of the deck wasted causing an unsafe condition. Class survey required to verify which gratings are safe or need repair. ICLL 66 Annex I Reg 25
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 August 2018
Resolved 21 August 2018
Resolution: Received Class report satisfying requirement.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 20 August 2018
Resolved
Emergency generator sets shall be equipped with two starting devices unless manual starting can be demonstrated effectively. Only one set of batteries is installed and manual start was inoperable.
74SOLAS (04 CON) II-1/44.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 August 2018
Resolved 21 August 2018
Resolution: Received Class report and witnessed operational test of equipment.
Engineering › Fuel Oil Storage/Transfer System › Pump
Issued 28 March 2018
Resolved
1410- Propulsion/ Main Engine- Connections within the fuel supply line and spill lines shall be constructed having regard to their ability to prevent prescribed oil fuel leaks while in service and after maintenance. Fuel pump No. 6 was saturated in fuel oil due to changeover from HFO to WLSP. Other fuel pumps were observed without leaks.- 74SOLAS(04)II-2/4.2.2.5.4
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 April 2018
Resolved 5 April 2018
Resolution: Received Class report of survey rectifying deficiency.
Engineering › Steam Boiler (auxiliary/waste heat) › Piping
Issued 28 March 2018
Resolved
1499-Other (Prop. & auxialiary machinery)- Arrangements for the utilization of other flammable oils employed under pressure in heating systems shall be such to ensure the safety of the ship and persons on board. Fuel supply line for oil-fired unit portion of the ship's boiler was leaking at the elbow.- 74SOLAS(04)II-2/4.2.4
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 April 2018
Resolved 5 April 2018
Resolution: Received Class report of survey rectifying deficiency.
Construction/Loadline › Penetrations › Gasket
Issued 28 March 2018
Resolved
0910- Closing devices watertight doors- All access openings in bulkeaheads at ends of enclosed superstructure shall be fitted with weather-tight doors. Weathertight door to SOPEP locker showed daylight when closed around gasket area.- ICLL(88PROTO)REG12
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 April 2018
Resolved 5 April 2018
Resolution: Received Class report of survey rectifying deficiency.
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 10 January 2018
Resolved
1530: The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulation to ensure with the present regulations to ensure that the ship and all respects will remain fit to proceed to sea without danger to the ship or persons on board. The vessel was issued an inbound letter of deviation due to a in operable S-band radar. While the vessel was in port the X-band radar also became in operable. 74 SOLAS(14)CHI REG 11(a) 17 a.c
Condition: Improper/Lack of Maintenance
Due 10 January 2018
Resolved 11 January 2018
Resolution: Received Class and Tech report attesting to the repairs and proper operation to the vessels x-band radar. Vessel issued a condition of class for the inop s-band radar. Due to the vessels tonnage a secondary radar is not requires per 33CFR164.
Navigation › Collision/Grounding Avoidance › Radar
Issued 29 December 2017
Resolved
The vessel's S-band radar was reported inoperable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2017
Resolved 29 December 2017
Resolution: Vessel was unable to have the S-band radar repaired while in port but a Letter of Deviation was issued and the radar is set to be repaired in next port of call.