Records from 2008 to 2025. Most recent: inspection, 8 September 2025.
Inspection history · 21
8 September 2025
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 8229371
21 July 2025
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8190698
7 March 2018
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6367358
6 March 2018
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6367305
23 February 2018
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6360545
12 January 2017
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6069735
22 November 2016
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6045784
21 November 2016
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6045263
6 January 2016
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5793562
14 November 2015
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5763357
5 October 2015
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5735489
20 August 2015
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5221529
20 August 2015
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5221577
23 October 2014
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5010555
7 July 2012
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 4368545
25 May 2012
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 4311216
17 February 2012
PII Safety Exam · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4246341
8 August 2008
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3292649
6 August 2008
Type not recorded
No type recorded · Station Little Creek · USCG East District (CGD-E) · Activity 3290903
5 August 2008
MARPOL Annex V Examination · ISPS II Exam · PII Safety Exam · MARPOL Annex I Examination · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3289491
1 August 2008
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3286032
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 20 August 2015
Resolved
2555- Vessel does not have specific checklist the incorporates the ship's power generation plant setup requirements for each operation ain accordance with the load analysis approved by the certificate issuing authority. Vessel is to create checklist for use by engineers and bridge team for future evolutions. 74 SOLAS (2009 ED) Chapter IX Reg 5 ISM Code Part A.7
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 2 October 2015
Resolution: Received, reviewed and accepted class report and checklists from (ABS and Vessel) stating the deficiency was rectified. This email included new check lists that incorporate all modes of properly providing power to the vessel and proper configuration.
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 20 August 2015
Resolved
2555- Vessel currently has condition of class for inoperative shaft generator that is required for bow and stern thruster operations. Vessel shall develop interim checklist to ensure safe navigation of vessel when in a maneuvering condition until shaft generator is repaired and certificate issuing authority has cleared the condition of class. 74 SOLAS (2009 ED) Chapter IX Reg 5 ISM Code Part A.7
Action required: 17 - Rectify deficiencies prior to departure
Due 20 August 2015
Resolved 22 August 2015
Resolution: Vessel submitted class report on repairs and SMS entries
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 23 October 2014
Resolved
The system shall be provided with arrangements to ensure the discharge of only oily mixture is automatically stopped. The 3 way valve is unable to isolate the overboard discharge of oily mixtures when in alarm conditions. IAW MARPOL ANNEX I/REG 14.7.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 23 December 2014
Resolution: Corrected on the spot by replacing wasted o-rings on valve to prevent the flow of water when in the closed position.