Records from 2016 to 2021. Most recent: operational control imposed, 7 June 2021.
Inspection history · 5
7 June 2021
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7218817
2 June 2021
COE-Administrative · PSC B · Administrative Inspection · COC-TVE Renew
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7213023
13 May 2017
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6146180
12 May 2017
COC-TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6139602
1 February 2016
COC-TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5807778
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 28 May 2017
Resolved
When operating a vessel on a body of water where the discharge of sewage is prohibited... the operator must secure each valve in the closed position. Three-way valve is inoperable for sewage system inhibiting proper operation. Issued 60(a)(c).
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 May 2017
Resolution: Received satisfactory Classification Society report attesting that new piping was fabricated and fitted to send all sewage to holding tank; requisition for new three-way valve was requested and will be installed upon delivery. PSCO confirmed installation.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 22 May 2017
Resolved
Except as specified by paragraph 3 of this regulation, any ship of 10,000 gross tonnage and above shall be fitted with oil filtering equipment complying with paragraph 7 of this regulation. The vessel is currently without an oil content meter to ensure oily discharges do not exceed 15 ppm as required by MARPOL Annex I. Issued 17ac
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 May 2017
Resolution: Received class report attesting to proper installation of new oil content meter; MI verified proper operation of OWS.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 19 May 2017
Resolved
The company and the ship shall comply with the requirements of the International Safety Management Code. The company should ensure that the policy is implemented and maintained at all levels of the organization, both ship-based and shore-based. Vessel not following the safety management system company procedures manual (continued in narrative). Issued 30abc
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 May 2017
Resolution: Obtained satisfactory class report highlighting changes to existing SMS.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 19 May 2017
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present convention to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment. PSCO found evidence that the sewage tank is contaminated with engine room oily waste. Issued 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 May 2017
Resolution: Received satisfactory class report attesting to cleaned sewage tank. MI confirmed report.
Documentation › Logs/Records › Oil Record Book
Issued 19 May 2017
Resolved
The Oil Record Book (ORB) Part I shall be completed on each occasion, on a tank-to-tank basis if appropriate, whenever any of the following space operations takes place in the ship. PSCO found evidence the crew was not properly handling oily waste by means of providing false information within the ORB. Issued 30abc
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 May 2017
Resolution: Received satisfactory operating company report attesting that all engine room crew members received refresher training on proper records management for all machinery space transfers IAW MARPOL 73/78, IMO Guidelines, and company SMS.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 14 May 2017
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present convention to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable threat or harm to the marine environment. PSCO found OWS overboard discharge piping fractured at the three way valve inhibiting the vessel from operating OWS effective
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 29 May 2017
Resolution: Received satisfactory class report; conducted operational test of the OWS to ensure proper system operation.
Pollution Prevention/Response › Prevention Equipment › Sewage System Tank
Issued 13 May 2017
Resolved
MARPOL Annex IV/11.3. When the sewage is mixed with wastes or waste water covered by other annexes of MARPOL, the requirements of those annexes shall be complied with in addition to the requirements of this annex. It was discovered that the vessel's piping had the scavenge air draining from main diesel engine into the sewage holding tank. Issued 60ac
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 19 May 2017
Resolution: Received satisfactory Classification Society report attesting that the scavenger air drain is no longer attached to sewage tank.