Records from 2016 to 2026. Most recent: inspection, 16 July 2026.
Inspection history · 40
16 July 2026
Deficiency Check · PSC A · Administrative Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 8439056
26 June 2026
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8416612
25 February 2026
PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8316395
19 February 2026
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8312676
23 December 2025
PSC A
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8286087
16 December 2025
PSC B · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8280157
8 December 2025
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8279344
7 July 2025
PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8177936
4 February 2025
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8077244
4 February 2025
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8088725
28 December 2024
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8054344
29 November 2024
Ballast Water Examination
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8040714
9 February 2024
PSC B
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7863185
26 June 2023
Administrative Inspection · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7720037
28 April 2023
PSC B
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7677271
17 April 2023
Administrative Inspection
Administrative · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 7670040
11 October 2022
PSC B · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7574864
31 July 2022
PSC A
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7514786
5 April 2021
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7169146
3 April 2021
COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7168103
10 February 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7138567
4 January 2021
PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7117754
13 July 2020
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7024946
7 June 2020
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6970172
22 March 2020
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6930087
10 December 2019
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6866531
13 January 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6609634
23 December 2018
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6602218
23 December 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6607414
18 December 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6599877
23 October 2018
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6566348
19 October 2018
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6564215
4 February 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6349224
1 February 2018
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6347764
10 December 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6321725
10 December 2017
PII Safety Exam · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6321750
5 October 2017
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 6282136
15 August 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6241783
20 June 2017
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6175492
8 December 2016
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6054358
07 - Fire Safety › N/A - No Subsystem › International shore-connection
Issued 25 February 2026
Resolved
74 Solas 2001 II-2/19.4
The connection shall be kept aboard the ship together with a gasket of any material suitable for 1.0 N/mm^2 services, together with four 16mm bolts, 50mm in length and eight washers
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 25 February 2026
Resolved 25 February 2026
Resolution: PSCE observed all 4 of the bolts in excess of length by an additional 20-40 mm above the required measurement
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 16 December 2025
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. The technical and/or operational nature of deficiencies 02, 03, and 04 provide objective evidence of a serious failure, or lack of effectiveness, of the implementation of the ISM Code. A safety management audit carried out by the Administration or the RO, with a corresponding report of findings satisfactory to the OCMI must be submitted prior to clearance of this deficiency and release from detention.
74 SOLAS (20)IX/3.1
ISM Code 10.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 19 December 2025
Resolution: PSCO received root cause analysis and corrective action plan from the vessel and ISM Shipboard Audit report from RO. Attended vessel to confirm proper repair of OWS and implementation of new SMS procedures.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 16 December 2025
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present Convention to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment. PSCO observed an unauthorized valve located on the oily water separator line after the 3 way valve. This valve is not approved by the RO.
MARPOL I/6.4.1
Condition: Improper Installation
Action required: 30 - Ship detained
Resolved 19 December 2025
Resolution: PSCO observed vessel removed unauthorized pipe fitting on the OWS.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 16 December 2025
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present Convention to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment. PSCO discovered during the test of the oily water separator that the 3 way valve was seized in the position to discharge all water into the bilge.
MARPOL I/6.4.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 19 December 2025
Resolution: PSCO observed satisfactory operation of the 3 way valve.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 16 December 2025
Resolved
In addition to the requirements contained elsewhere in the present regulations, ships shall be designed, constructed, and maintained in compliance with the structural, mechanical, and electrical requirements of a classification society which is recognized by the Administration in accordance with the provisions of regulation XI-1/1, or with applicable national standards for the Administration which provide an equivalent level of safety. PSCO observed the stop button on the switchboard for the emergency generator was not functioning as designed. The crew had to use emergency ventilation flaps to shut it down after 20 minutes of unsuccessful attempts.
74SOLAS (01)II-1/3-1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 19 December 2025
Resolution: PSCO observed satisfactory operation of the emergency generator successfully shutting off.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 16 December 2025
Resolved
The machinery, boilers, and other pressure vessels, associated piping systems, and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces, and other hazards. PSCO observed the bull gear on the main engine did not have a machinery guard in place.
74SOLAS (01) II-1/26.1
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 December 2025
Resolution: PSCO observed machinery guards present.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 16 December 2025
Resolved
The owner, master, or person in charge of each vessel underway shall ensure that the vessel's anchors are ready for letting go, and the equipment required by this part is maintained in operable condition. Vessel reported flukes broke off of their starboard anchor following anchoring operations.
33CFR164.11(o) & (r)
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 15 January 2026
Resolved 19 December 2025
Resolution: Received class report attesting to repairs by 15Jan2026.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 16 December 2025
Resolved
The owner, master, or person in charge of each vessel underway shall ensure that the vessel's anchors are ready for letting go, and the equipment required by this part is maintained in operable condition. Vessel reported flukes broke off of their starboard anchor following anchoring operations. Deficiency shall be recitfied by 15Jan2026
33CFR164.11(o) & (r)
Action required: 705 - Other - as specified
Due 15 January 2026
Resolved 19 February 2026
Resolution: Vessel Captain provided a satisfactory survey report from class, Korean Register, attesting to the repairs made to the starboard anchor.
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 31 July 2022
Resolved
Any main steering gear control system operable from the navigation brdige shall in the event of a failure of electrical power supply to the control system, an audible and visula alarm.
74 SOLAS (97) II-I/29.8.4
PSCO observed audible alarms for steering gear not operable on navigation bridge.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 31 July 2022
Resolved 4 August 2022
Resolution: PSC NOLA received a class report from KR satisfying the requirement.
10 - Safety of Navigation › N/A - No Subsystem › Voyage data recorder (VDR)/Simplified Voyage data recorder(S-VDR)
Issued 10 December 2019
Resolved
To assist in casualty investigations, cargo ships, when engaged on international voyages, shall be fitted with a VDR which may be a simplified voyage data recorder (S0VDR). PSCO observed S-VDR in a recording status with PSU battery alarm 118. S-VDR serviced on 07Dec2019 and technician stated batteries should be replaced as soon as possible. 74 SOLAS (2014) V/20.2 17ac
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 December 2019
Resolution: Received class report from BV stating the deficiency was rectified.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 19 October 2018
Resolved
0663 74SOLAS(2014)III/32.3.3.3: IMMERSION SUITS SHALL BE PROVIDED AT WORK STATIONS FOR THE NUMBER OF PERSONS NORMALLY ON WATCH OR WORKING AT THESE LOCATIONS AT ANY TIME. IMMERSION SUITS ARE NOT LOCATED IN THE ENGINE CONTROL ROOM. 74 SOLAS (2014) CH III REG 32.3.3.3 17 a/c
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 October 2018
Resolution: CLASS SURVEYOR DETERMINED IMMERSION SUITS LOCATED IN THE OFFICERS MESSROOM WERE RELOCATED TO THE ENGINE CONTROL ROOM AT THE REQUEST OF THE SURVEYOR. SURVEYOR AMENDED VESSELS FIRE CONTROL AND SAFETY PLANS FOLLOWING THE CHANGE.
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 June 2017
Resolved
The starboard windlass motor was replaced and the deck penetration is not properly sealed. To satisfaction of Class and Coast Guard.
Action required: 705 - Other - as specified
Due 20 July 2017
Resolved 1 August 2017
Resolution: PSC NOLA received a class report from BV satisfying the requirement.
Electrical › Lighting (service) › Lighting Fixture
Issued 20 June 2017
Resolved
Ships forces have replaced deck lighting with LED rope lighting, have class attest to proper installation/ acceptability. To Class and Coast Guard.
Action required: 705 - Other - as specified
Due 20 July 2017
Resolved 1 August 2017
Resolution: PSC NOLA received a class report from BV satisfying the requirement.
Fire Fighting › Fire Main › Condition
Issued 20 June 2017
Resolved
The fire main on port side has temporary patch in place. To satisfaction of Class and Coast Guard.
Action required: 705 - Other - as specified
Due 20 July 2017
Resolved 1 August 2017
Resolution: PSC NOLA received a class report from BV satisfying the requirement.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 8 December 2016
Resolved
1740 - 17ac The oil filtering equipment shall ensure hat any oil mixture discharged into the sea after passing through the system has an oil content. not exceeding 15ppm. PSCO observed that OWS content monitor could not produce effluent below 15ppm & is not functioning as designed. MARPOL Annex I/14.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 December 2016
Resolution: Vessel provided a class report allowing them to sail with an inoperable OWS. See documents.