Records from 2009 to 2025. Most recent: inspection, 6 March 2025.
Documentation record
Registered dimensions (L × B × D)298.0 ft × 53.0 ft × 14.0 ft
Registered tonnagegross 1,857 / net 1,857
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderAVONDALE SHIPYARDS INC · AVONDALE, LA, UNITED STATES · built 1967
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portSAINT LOUIS, MO
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 28 May 2026 · expires 30 June 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1857 - Simplified, Gross Ton
1857 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 38
6 March 2025
Damage Survey · Drydock Exam · Cargo Tank Internal · Administrative Inspection · COI Inspection · Examination of Repairs · In-Service Inspection · Internal Structural Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8089419
7 January 2025
Permit to Proceed · Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8059313
5 January 2025
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8080809
19 December 2024
Annual Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 8049199
23 January 2024
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Detachment Ft. Smith · USCG Heartland District (CGD-H) · Activity 7853471
27 November 2023
Annual Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7829952
5 October 2023
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7806575
6 May 2023
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Detachment Ft. Smith · USCG Heartland District (CGD-H) · Activity 7683551
1 May 2023
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7679052
22 April 2023
Damage Survey
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7673659
15 December 2022
In-Service Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7601125
2 November 2022
COI Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7587976
14 September 2022
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7559995
26 January 2022
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7386187
6 October 2021
Administrative Inspection · Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7327701
19 January 2021
Annual Survey · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7126822
21 January 2020
MTSA Verification · Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 6893021
16 July 2019
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 6752026
27 March 2019
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 6650277
12 May 2018
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6465699
24 January 2018
MTSA Verification · Cargo Tank Internal · Administrative Inspection · COI Inspection · Examination of Repairs · Internal Structural Exam · Special
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 6342887
16 October 2017
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6288635
1 March 2017
Examination of Repairs · Periodic Inspection · Damage Survey · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 6097130
29 July 2016
Drydock Exam · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 5956712
3 May 2016
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5881402
19 January 2016
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 5799726
26 August 2015
MTSA Verification · Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 5226775
17 August 2015
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5219137
18 May 2015
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5129776
30 January 2015
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 5061585
1 December 2014
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5032147
14 February 2014
MTSA Verification · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4799954
10 June 2013
Internal Structural Exam · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4616703
7 June 2013
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4613870
24 April 2012
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4295969
22 August 2011
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4123687
11 May 2010
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 3736400
29 April 2009
Cargo Tank Internal · MTSA Verification · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 3470150
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 7 January 2025
Resolved
Compliance with the standards established by ABS will be considered as satisfactory evidence of the structural efficiency of the vessel. A 3"x6" hole was discovered in Wing Void 2P affecting watertight integrity and stability of the vessel. Water was also found communicating from Wing Void 2P thru to #2 Hopper to Wing Void #2S via wastage holes in the watertight bulkheads between the void and hopper. Wing Void 2P and all wastage holes in the wing void watertight bulkheads have been temporarily repaired and temporary repairs are holding. Vessel authorized to proceed to Kingston Mines, IL to offload IAW approved transit plan.
Upon completion of offload, new transit plan may be required and permit to proceed may be issued to allow vessel to proceed to next port for permanent repairs to the satisfaction of the attending CG Marine Inspector.
Action required: 705 - Other - as specified
Resolved 12 December 2025
Resolution: Cropped and renewed. Air tested to 1.5 psi. All sat.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 23 January 2024
Resolved
ort #7 wing tank was found to have waste holes over an area of 18"x6" in the knuckle after surveyor from alpha marine inspected the temporary repair completed by the company. temporary repair after the surveyor reinstalled the patches utilizing soft patch and the leaks appeared to be slowed by 100%.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 February 2024
Resolution: Repairs completed and tested, all sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 January 2024
Resolved
essel is to be transited to Greenville Shipyard, MS to complete full repairs on the #7 port Wing tank that has a temporary repair. No cargo operations shall be conducted on the vessel prior to a Coast Guard inspection at Greenville Shipyard.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 February 2024
Resolution: Repairs completed and tested, all sat.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 15 December 2022
Resolved
Cargo tanks shall be supported on foundations of steel or other suitable material and securely anchored in place to prevent the tanks from shifting when subjected to external forces. Each tank shall be so supported as to prevent the concentration of excessive loads on the supporting portions of the shell or head as prescribed under § 38.05-2(d). Marine inspector observed cargo tank craddle support gusset, and transverse frame support wasted through at base in Starboard hopper void #1. Provide photo verification of the repairs specified.
46CFR38.05-10(a)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 January 2023
Resolved 25 December 2022
Resolution: Recieved photo verification of both sides of each repair completed to cargo tank craddle support gusset, and transverse frame support at base in Starboard hopper void #1, all sat.