Records from 2009 to 2025. Most recent: inspection, 15 August 2025.
Documentation record
Registered dimensions (L × B × D)300.0 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,632 / net 1,632
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · ASHLAND CITY, TN, UNITED STATES · built 2009
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 28 May 2026 · expires 30 June 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1632 - Simplified, Gross Ton
1632 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 21
15 August 2025
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8210586
9 August 2024
MTSA Verification · COI Inspection · Internal Structural Exam · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7964905
15 August 2019
COI Inspection · Cargo Tank Internal · Drydock Exam · MTSA Verification · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6742996
3 August 2018
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6545575
7 April 2017
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6145223
4 August 2016
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5960549
24 February 2016
Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5821949
18 August 2015
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5216067
24 April 2015
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5850740
19 June 2014
MTSA Verification · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4887643
13 January 2014
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4782328
23 June 2013
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 4664475
21 March 2012
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4268454
9 March 2012
Periodic Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4260027
5 March 2012
Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4257969
7 February 2012
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4248737
10 September 2010
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3847048
22 April 2010
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3768090
9 June 2009
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3499722
20 May 2009
Type not recorded
No type recorded · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3482143
19 May 2009
Cargo Tank Internal · MTSA Verification · Hull Examination · Administrative Inspection · Initial Construction-Excluding Oversight · Initial Certification · Internal Structural Exam
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 3478907
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 5 March 2012
Resolved
Vessel had 5 pinhole leaks located throughout the cargo stripping system, with each leak located at a weld in the piping system. Cargo tanks were empty and affected areas were wrapped with absorbant pads. Vessel to transit to Southwest Shipyard in Houston, TX, to affect permanent repairs.
Action required: 705 - Other - as specified
Due 4 April 2012
Resolved 20 March 2012
Resolution: Attended vessel to verify proper repairs to stripping system. Witnessed satisfactory air test of stripping system.
Construction/Loadline › Hull › Double Hull
Issued 19 May 2009
Resolved
Make permanent repair in the #3 port void to damage associated with barge breakaway on 20 May 09, prior to loading cargo.
Action required: 705 - Other - as specified
Resolved 9 June 2009
Resolution: Air/soap tested all repairs to hull and inspected internals; all sat.