Records from 2004 to 2025. Most recent: inspection, 11 September 2025.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderWEST GULF MARINE INC · GALVESTON, TX, UNITED STATES · built 2004
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 11 May 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 37
11 September 2025
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8227329
15 August 2025
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8210586
14 August 2025
Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8210181
20 January 2025
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8065597
14 October 2024
Internal Structural Exam · COI Inspection · Cargo Tank Internal · Drydock Exam · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8018678
25 March 2024
Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7884796
26 October 2023
Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7814629
7 July 2021
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7248693
4 January 2021
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7119281
10 October 2019
MTSA Verification · Examination of Repairs · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6826165
18 July 2018
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6543000
5 January 2018
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6333248
18 December 2017
Administrative Inspection · Permit to Proceed
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6325909
2 October 2017
Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6277371
1 February 2017
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6079663
16 December 2016
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 6062670
18 July 2016
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5954660
11 July 2016
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5938482
22 April 2016
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6081440
10 March 2016
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5868441
4 June 2015
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5882156
24 July 2014
MTSA Verification · Cargo Tank Internal · Administrative Inspection · Examination of Repairs · COI Inspection · Hull Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4932146
4 September 2013
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4706799
26 August 2013
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4697226
3 June 2013
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4693577
14 May 2012
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4393122
30 August 2011
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4130745
12 August 2011
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4113582
22 June 2010
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3820530
15 July 2009
Internal Structural Exam · COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3535149
9 October 2008
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3341538
2 April 2007
Periodic Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2915511
29 December 2006
Administrative Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2854560
1 April 2006
MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2633904
26 April 2005
Annual Inspection · MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2362133
9 June 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2093183
16 March 2004
Initial Certification · Construction Oversight
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2047388
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 22 August 2025
Resolved
Vessel was involved in a collision causing a puncture approximately 6" x 4' in length in their starboard side raised trunk.
Vessel has been lightered at VLS Marine and is authorized a one-time transit to Sienna Shipyard. Kirby 28030 shall not depart the facility until repairs are completed to the satisfaction of this office and by the attending CG Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 September 2025
Resolution: Inspector witnessed satisfactory air test of repiars, vessel cleared to conitnue operations.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 11 July 2016
Resolved
Vessel has 2 in Pin hole leaks found on suction stripping line. Make transit one time transit to Dow for discharge and head straight to yard for repairs.
Action required: 705 - Other - as specified
Due 18 July 2016
Resolved 18 July 2016
Resolution: MI witnesses a satisfactory re-weld of the stripping pipe. Also witnessed a satisfactory air test of the same.
Construction/Loadline › Hull › Side Shell
Issued 10 March 2016
Resolved
D8 TBSIP SELF-REPORTED DEFICIENCY. Make permanent repair to fracture on the port stern corner of the barge.The fracture measures approx. 6 inches long x 1/8 inch wide.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 23 April 2016
Resolved 22 April 2016
Resolution: Witnessed NDT consisting of air/soap/water, test SAT.
Construction/Loadline › Hull › Hull Plating
Issued 26 August 2013
Resolved
D8 TBSIP SELF-REPORTED DEFICIENCY. Make permanent repair to 12"X1/4" FRACTURE ON PORT BOW CORNER.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 7 October 2013
Resolved 11 September 2013
Resolution: Received photos/report of satisfactory NDT or repairs.
Construction/Loadline › Hull › Hull Plating
Issued 12 August 2011
Resolved
D8 TBSIP SELF-REPORTED DEFICIENCY. Make permanent repair to 12" x 3/16" fracture on the stbd side stern corner where the walking deck and corner wrap meet.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 25 September 2011
Resolved 30 August 2011
Resolution: Area properly ground/welded. Pressure test conducted, all sat.