Records from 2009 to 2019. Most recent: inspection, 17 January 2019.
Inspection history · 6
17 January 2019
ISPS II Exam · Ballast Water Examination · COC-GAS Renew
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6611777
29 February 2016
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5824194
29 November 2015
Deficiency Check · COC-GAS Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5768737
28 January 2010
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3671574
23 December 2009
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3656315
9 December 2009
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3647500
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 23 January 2019
Resolved
11101- Lifeboats- 10cBefore the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Port lifeboat did not start after inital attempt.
74 SOLAS (14) III/20.2
Action required: 10 - Deficiency Rectified
Resolved 23 January 2019
Resolution: Lifeboat started on second attempt.
99 - Other › N/A - No Subsystem › Other (SOLAS operational)
Issued 23 January 2019
Resolved
01199- Other (certificates)- 16ac
Pressure relief valves should be set and sealed by a competent authority acceptable to the Administration and a record of this action, including the valves of set pressure, should be retained aboard the ship. No record of saftey valve set and seal approved by class found onboard.
74 SOLAS (14) VII/13.1 IGC Code 8.2.5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2019
Resolved 5 February 2019
Resolution: Master sent in Set & Seal Safety Relief Documentation approved by BV Classification Society.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 30 November 2015
Resolved
0940 - In general the use of free-standing oil fuel tanks shall be avoided. Where permitted, they shall be placed in an oil-tight spill tray of ample size having a suitable drain pipe leading to a suitable sized spill oil tank. There were eight 200L containers of oil sludge stored in the engine room. (74 SOLAS (2004) II-2/4.2.2.3.4)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 December 2015
Resolved 11 December 2015
Resolution: Oil fuel tanks removed.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pressure/Vacuum Relief Valve
Issued 30 November 2015
Resolved
1199 - Pressure relief valvesshould be set and sealed by a competent authority. Numerous pressure relief valve seals for the interbarrier and insulation spaces were broken. (74 SOLAS (2004) VII/13.1 and IGC Code 8.2.5)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 February 2016
Resolution: Received class report verifying the set pressure of the interbarrier safety valves and seals.
Navigation › Collision/Grounding Avoidance › Radar
Issued 30 November 2015
Resolved
1530 - All ships of 3000 gross tonnage and upwards shall, in addition to meeting the requirements of paragraph 2.5, have a 3 GHz radar. The X-band radar was inoperable. (SOLAS 74 (2004 Consolidated Ed.) V/19.2.7)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 December 2015
Resolution: Tech repaired the radar.