Records from 1992 to 2026. Most recent: inspection, 10 July 2026.
Documentation record
Registered dimensions (L × B × D)55.5 ft × 20.0 ft × 8.2 ft
Registered tonnagegross 92 / net 63
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderHOUMA SHIPBUILDING COMPANY, INC · HOUMA, LA, UNITED STATES · built 1971
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 14 March 2026 · expires 30 April 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it63 - Regulatory (Subpart C or D), Net Ton
92 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 22
10 July 2026
MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8394848
26 November 2024
TPO Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8048916
22 November 2024
TPO Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8058840
10 September 2024
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7999858
17 May 2024
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7921449
29 January 2024
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7857271
18 July 2023
MTSA Verification · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7733384
14 July 2022
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7498688
18 March 2022
Internal Structural Exam · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7409026
25 June 2021
Deficiency Check · Initial Certification · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7235607
27 May 2020
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6968196
27 August 2013
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4698179
7 August 2013
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4678286
28 April 2011
Industry Initiated Exam · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3997392
20 January 2011
Industry Initiated Exam · DAPI Audit · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3929939
10 November 2008
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3360583
29 October 2008
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3356636
16 February 2008
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3150229
28 January 2008
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3138341
27 June 2006
MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2719137
9 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1962270
20 October 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 80035
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 19 September 2024
Resolved
A power-driven vessel underway shall exhibit:(i) A masthead light forward. The masthead light lens was missing. Repair or replace light and test.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 October 2024
Resolved 21 October 2024
Resolution: Received objective evidence from TPO that new light was installed. See deficiency documents.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 January 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons on board under normal and emergency conditions. Operator self -reported vibration on the starboard side due to debris. Complete repairs to the satisfaction of the attending marine inspector.
46 CFR 143.205(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 February 2024
Resolution: Received video evidence of repair.
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 14 July 2022
Resolved
The marine employer must display and distribute the
Employee Assistance Program educational material. The
EAP community service hot-line telephone number for
crew-member assistance wasn't posted onboard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 July 2022
Resolved 25 August 2022
Resolution: Received email with attachments showing that the def has been corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 14 July 2022
Resolved
All crewmembers must be provided with health and safety
information. The H&S plan needs the following topics
added:
Procedures for Reporting Unsafe Conditions;
Procedures for Respiratory Protection;
Fresh Water (non-potable) instructions
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2022
Resolved 15 August 2022
Resolution: Received email with attachments showing that the def has been corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 July 2022
Resolved
Fuel systems for towing vessel main engines & generators
must have a documented maintenance plan to ensure proper
operation of the system. Vessel didn't have them
onboard.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2022
Resolved 25 August 2022
Resolution: Received email with attachments showing that the def has been corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 July 2022
Resolved
The connections of flexible cable plugs & socket outlets
must be designed to prevent unintended separation.
Multiple engine room & bridge equipment outlets unsat.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2022
Resolved 15 August 2022
Resolution: Received email with attachments showing that the def has been corrected.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 14 July 2022
Resolved
The master must ensure that all hatches, doors, and
other openings designed to be watertight or weathertight function properly. The weather tight doors
at the operating station do not create a proper seal.
Repair or replace gasket in kind.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2022
Resolved 15 August 2022
Resolution: Received email with attachments showing that the def has been corrected.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 14 July 2022
Resolved
As far as practicable, the owner or managing operator
must implement other types of safety control measures
before relying on Personal Protective Equipment. These
controls may include administrative, engineering, source
modification, substitution, process change or controls,
isolation, ventilation, or other controls. The oven does
not have a latch installed to keep from opening.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2022
Resolved 15 August 2022
Resolution: Received email with attachments showing that the def has been corrected.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 14 July 2022
Resolved
Where systems installed on vessels for wash water, as
defined in § 1250.3(n), do not comply with the
requirements of a potable water system, prescribed in
§1250.82...All faucets shall be labeled ‘‘Unfit for
drinking’’. The sinks were missing these labels.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2022
Resolved 15 August 2022
Resolution: Received email with attachments showing that the def has been corrected.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 14 July 2022
Resolved
All vessel equipment must be used in accordance with the
manufacturer's recommended practice and in a manner that
minimizes risk of injury or death. The eyewash was
expired.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2022
Resolved 15 August 2022
Resolution: Received email with attachments showing that the def has been corrected.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 14 July 2022
Resolved
Each towing vessel must be maintained and operated so as
to minimize fire hazards. Observed fuel filter metal
containment full of fuel, needs to be emptied and maintained as per manufacturers instructions.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 July 2022
Resolved 25 August 2022
Resolution: Received email with attachments showing that the def has been corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 July 2022
Resolved
Electrical systems and equipment must function properly
and minimize system failures and fire and shock hazards.
Missing latch on electrical distribution panel labeled
“ER2” in the lower engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2022
Resolved 25 August 2022
Resolution: Received email with attachments showing that the def has been corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 14 July 2022
Resolved
Emergency lighting must be provided for all internal
crew working and living areas. Emergency lighting
sources must provide for sufficient illumination under
emergency conditions to facilitate egress from each
space... No emergency lighting in the galley.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2022
Resolved 25 August 2022
Resolution: Received email with attachments showing that the def has been corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 July 2022
Resolved
Each owner or managing operator must develop procedures
to routinely examine, maintain, and replace capstans,
winches, and other machinery used to connect the towing
vessel to the tow. Vessel missing these procedures.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2022
Resolved 15 August 2022
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 14 July 2022
Resolved
Each towing vessel must be maintained and operated so as
to minimize fire hazards. Observed generator windings
and ventilation stack mlower motor windings were dirty
with dusty oily grime. Clean windings to the
satisfaction of the attending marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2022
Resolved 15 August 2022
Resolution: Received email with attachments showing that the def has been corrected.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 15 July 2021
Resolved
Fire detection systems must be inspected or tested at least once every 12 months. Vsl did not have current and up to date inspection for fire detection system.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Resolved 15 July 2021
Resolution: verified servicing
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 July 2021
Resolved
Portable and semi-portable fire extinguishers must be inspected, maintained, and tested in accordance with the frequency specified by NFPA 10. Vsl did not maintain extinguishers as required.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 August 2021
Resolution: verified servicing