Inspection history · 60
24 March 2025
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8098641
28 October 2024
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8025951
20 March 2020
MTSA Verification · COI Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6909392
13 March 2019
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6649259
1 February 2018
Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6350143
1 March 2017
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6327545
8 December 2016
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6054580
11 April 2016
Administrative Inspection · Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5851837
1 February 2016
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5821947
27 May 2014
Internal Structural Exam · MTSA Verification · Drydock Exam · Cargo Tank Internal · Deadweight Survey · COI Inspection · Construction Oversight
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4870416
3 March 2014
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4805119
27 August 2013
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4698179
7 August 2013
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4678286
31 January 2012
Drydock Exam · COI Inspection · Cargo Tank Internal · Internal Structural Exam · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4223194
10 February 2010
MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3674806
15 January 2009
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3391409
7 March 2008
Administrative Inspection · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3158103
30 November 2006
MTSA Verification · Cargo Tank Internal · COI Inspection · Internal Structural Exam · Hull Examination · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2810695
15 February 2006
MTSA Verification · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2584770
9 March 2005
Administrative Inspection
Administrative · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2306796
4 November 2004
MTSA Verification · Periodic Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2234930
21 June 2004
In-Service Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2106974
23 January 2004
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2001888
9 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1963051
15 May 2003
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1793936
12 February 2003
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1746717
27 November 2001
Hull Examination · Cargo Tank Internal · COI Inspection · Internal Structural Exam
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1410704
28 September 2000
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1382052
15 September 2000
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 52774
11 September 2000
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 62051
21 December 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 813480
21 October 1999
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1451455
18 June 1999
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 521269
15 October 1998
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1390850
19 November 1997
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1400677
18 November 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1371582
15 October 1996
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1452209
15 September 1995
COI Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1443622
30 June 1995
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 162031
15 September 1994
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1453066
15 September 1993
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1370693
2 December 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1139443
30 November 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 828655
28 October 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1268555
16 September 1991
Hull Examination · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1002430
2 August 1990
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 904664
20 September 1989
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1199190
4 August 1988
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1039669
4 August 1988
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1342829
29 October 1987
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1019794
30 September 1987
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1011529
30 July 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1337925
5 December 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1001584
14 August 1986
COI Inspection · Credit Drydock
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1000969
15 June 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1001369
16 May 1986
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1296721
29 March 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1292278
21 June 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1281991
15 March 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1273778
13 March 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1278391
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 October 2024
Resolved
The respective piping systems installed on ships and barges must have the necessary pumps, valves, regulation valves, safety valves, relief valves, flanges, fittings, pressure gages, liquid level indicators, thermometers, etc., for safe and efficient operation of the vessel. MI discovered that the seal on the cargo pump was leaking ultra low sulfide diesel. Make appropriate repairs to the satisfaction of the attending MI. 46 CFR 56.01-1(b) 705C Prior to Discharging cargo
Action required: 705 - Other - as specified
Resolved 31 October 2024
Resolution: Rcvd Class report attesting to satifactory repairs.
Documentation › Markings/Placards › Oil Discharge Placard
Issued 1 February 2016
Resolved
Pollution prevention placard was missing.
Action required: 705 - Other - as specified
Due 8 February 2016
Resolved 1 February 2016
Resolution: Posted oil pollution prevention placard onboard.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Relief Valve
Issued 17 March 2015
Resolved
Documentation for cargo pipeline, cargo pump relief valve and cargo pump pressure gauges were not available for inspection.
Due 31 March 2015
Resolved 24 March 2015
Resolution: Barge rep provided all required paperwork.
Accommodation/Occupational Safety › Heating › Piping
Issued 17 March 2015
Resolved
Engine exhaust missing lagging for all three engines onboard.
Due 31 March 2015
Resolved 24 March 2015
Resolution: Lagging installed on all three engines.
Construction/Loadline › Penetrations › Pipe Flange
Issued 17 March 2015
Resolved
Both port and starboard #2 gooseneck vents showed significant deterioration at the base where they enter the cargo tank trunk.
Due 31 March 2015
Resolved 24 March 2015
Resolution: All four gooseneck vents were replaced.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 3 March 2014
Resolved
Installed Cargo PV Valves were missing the proper labeling and settings for pressure and vacuum were unable to be determined during inspection. 46CFR32.55-20 & 46CFR162.017
Condition: Improper/Lack of Maintenance
Due 4 April 2014
Resolved 15 March 2014
Resolution: Recieved pictures from [name withheld] with newly installed and freshly painted goose necks on barge.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 2 November 2006
Resolved
Repair or replace electrical system to meet requirements of electrical systems on tank barges (46 CFR 111.105-31(l)).
Condition: Improper Installation
Due 27 November 2006
Resolved 27 December 2006
Resolution: Junction boxes properly mounted on deck framing.
Engineering › Diesel Engine (auxiliary) › Governor
Issued 2 November 2006
Resolved
Replace throttle cables on aft port cargo pump engine.
Due 27 November 2006
Resolved 27 December 2006
Resolution: Throttle cables properly replaced.
Engineering › Diesel Engine (auxiliary) › Distributor (fuel injection)
Issued 2 November 2006
Resolved
Re-seal fuel supply line to aft port cargo pump engine and mount it to deck.
Due 27 November 2006
Resolved 27 December 2006
Resolution: Fuel supply line re-sealed and properly mounted.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 2 November 2006
Resolved
Repair or replace exhaust pipe on aft stbd cargo pump engine and properly insulate it.
Due 27 November 2006
Resolved 27 December 2006
Resolution: Exhaust pipe replaced and properly insulated.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 21 June 2004
Resolved
Remove all water from forward and aft void spaces.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 June 2004
Resolution: Corrected.
Deck/Cargo › Cargo Stowage
Issued 23 January 2004
Resolved
Provide additional locking pins to prevent 55 GAL drums from shifting fore and aft.
Due 23 February 2004
Resolved 19 February 2004
Resolution: Corrected.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 23 January 2004
Resolved
Replace NAVLTS and wiring to same on bow.
Due 23 February 2004
Resolved 19 February 2004
Resolution: Corrected.
Deck/Cargo › Holds/Tanks
Issued 23 January 2004
Resolved
Determine source of f/o vapors/residue in #2 stbd wing void.
Due 23 February 2004
Resolved 20 February 2004
Resolution: Corrected.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 23 January 2004
Resolved
Replace f/o hoses on forward cargo pump engine. Prove hoses meet SAE J1942 requirement for the intended service.
Due 23 February 2004
Resolved 19 February 2004
Resolution: Corrected.
Construction/Loadline › Hull
Issued 23 January 2004
Resolved
Remove copper slag from top of #1 stbd cargo tank.
Due 23 February 2004
Resolved 19 February 2004
Resolution: Corrected.
Stability
Issued 12 February 2003
Resolved
Prove intact stability IAW 46 CFR 174.015
Action required: 705 - Other - as specified
Due 15 April 2003
Resolved 17 April 2003
Engineering
Issued 27 November 2001
Resolved
REPAIR OF REPLACE PORT PRIME MOVER TEMPERATURE GAUGE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 27 December 2001
Resolved 20 December 2001
Construction/Loadline
Issued 27 November 2001
Resolved
PROVIDE PROFESSIONAL ENGINEERS ANALYSIS IN CONJUNCTION WITH 30 YEAR MID- BODY SURVEY.
Condition: Unknown
Due 27 December 2001
Resolved 20 December 2001
Deck/Cargo
Issued 27 November 2001
Resolved
PROVE PROPER OPERATION OF RISING STICK INDICATOR ON STARBOARD AFT DECK CARGO TANK. NO LOADING OF THIS TANK PERMITTED UNTIL ITEM INSPECTED TO THE SATISFACTION OF AN ATTENDING CG MARINE INSPECTOR.
Condition: Unknown
Due 27 December 2001
Resolved 20 December 2001
Deck/Cargo
Issued 27 November 2001
Resolved
INSTALL RISING STEM VALVE ON CARGO PIPING HEADER REDUCTION FLANGE ON STBD SIDE AFT, AND STBD FWD CARGO PIPING. (BOTH VALVES ARE ABOVE FIXED CONTAINMENT)
Condition: Unknown
Due 27 December 2001
Resolved 20 December 2001
Engineering
Issued 27 November 2001
Resolved
HARD PIPE DUEL FUEL RETURN LINES TO WITHIN 30 INCHES OF DIESEL TANK AND CARGO PUMP ENGINE.
Condition: Unknown
Due 27 December 2001
Resolved 20 December 2001
Deck/Cargo
Issued 28 September 2000
Resolved
Install cargo valve position indicators for all cargo tank valves._x001C_
Condition: Unknown
Due 28 September 2000
Resolved 28 September 2000
Deck/Cargo
Issued 21 October 1999
Resolved
Install overfill protection on oil deck tanks.
Condition: Unknown
Due 21 October 1999
Resolved 21 October 1999
Deck/Cargo
Issued 15 October 1996
Resolved
AS SPECIFIED ON 46 CFR 35.53-55(b), DECKS ARE TO BE PROPERLY DUNNAGED TO PREVENT CHAFFING. DUNNAGE MUST BE PERMANENTLY AFFIXED TO THE BARGE'S DECK.
Condition: Unknown
Due 15 October 1996
Resolved 15 October 1996
Deck/Cargo
Issued 15 September 1995
Resolved
PROVE ABILITY TO SHUTDOWN LUBE OIL PUMP ENGINE REMOTELY PRIOR TO USING PUMPTO TRANSFER CARGO.
Condition: Unknown
Due 29 September 1995
Resolved 25 September 1995
Deck/Cargo
Issued 28 October 1992
Resolved
PROVIDE SAFETY GUARD AROUND 3 CYLINDER LISTER CARGO PUMP CRANK SHAFT START.
Condition: Unknown
Due 28 October 1992
Resolved 28 October 1992
Construction/Loadline
Issued 28 October 1992
Resolved
PERMANENTLY REPAIR AS ORIGINAL 2 WASTED AREAS ON STBD DECK KNUCKLE IN WAY OF # 1 STBD VOID APPROX. 1 FT. FWD OF #1 STBD VOID HATCH AND SIX FEET AFT OF SAME HATCH COVER IN WAY OF # 2 STBD VOID.
Condition: Unknown
Due 28 October 1992
Resolved 28 October 1992
Electrical
Issued 28 October 1992
Resolved
MOUNT 24 VOLT JUNCTION BOX ON PORT SIDE OF RAISED CARGO HATCH CENTER OF VESSEL. ENSURE ALL ELECTRICAL CONNECTIONS AND FITTINGS ARE EXPLOSION PROOF.
Condition: Unknown
Due 28 October 1992
Resolved 28 October 1992
Construction/Loadline
Issued 29 October 1987
Resolved
PROVIDE APPROVED PLANS/CALCULATIONS FOR 8000 GAL CYLINDRICAL DECK TANKS.
Condition: Unknown
Due 29 October 1987
Resolved 29 October 1987
Unknown
Issued 14 August 1986
Resolved
PRIOR TO LOADING, PROVIDE COAST GUARD APPROVED PLANS AUTHORIZING THE CARRIAGE OF THE TWO 8000 GALLON MARINE PORTABLE TANKS USED TO CARRY LUBE OIL (GRADE D AND BELOW).
Condition: Unknown
Due 14 August 1986
Resolved 14 August 1986
Unknown
Issued 15 June 1986
Resolved
EXTENSIVE DAMAGE TO BOW RAKE STBD SIDE. APPROXIMATELY 10'X'10 OPENDED ABOVE AND BELOW WATERLINE, GAS FREE; DRY DOCK AND INSPECT FOR ADDITIONAL DAMAGE.
Condition: Unknown
Due 15 June 1986
Resolved 15 June 1986
Deck/Cargo
Issued 16 May 1986
Resolved
PROVIDE APPROVED COAST GUARD PLANS AUTHORIZING THE CARRIAGE, PRIOR TO LOADING OF LUBE OIL (GRADE D AND BELOW) IN TWO 8000 GALLON MARINE PORTABLE TANKS.
Condition: Unknown
Due 16 May 1986
Resolved 16 May 1986