Inspection history · 31
15 November 2025
Bulk Liquid Transfer Monitor
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8269244
28 February 2025
Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8086463
21 February 2025
Bulk Liquid Transfer Monitor
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8083576
17 June 2024
Periodic Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7936912
20 March 2024
Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7882704
6 June 2023
Administrative Inspection · Annual Inspection · MTSA/ISPS Verification · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7703962
24 January 2023
Bulk Liquid Transfer Monitor
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7626271
26 October 2022
Bulk Liquid Transfer Monitor
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7584460
19 August 2022
Bulk Liquid Transfer Monitor
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7538051
16 August 2022
Bulk Liquid Transfer Monitor
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7538414
27 May 2022
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7460478
24 March 2021
Drydock Exam · COI Inspection · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7161780
5 May 2020
Annual Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6948729
21 June 2019
MTSA Verification · Administrative Inspection · Periodic Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6721293
13 March 2019
Administrative Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6641808
23 March 2018
Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6377252
23 March 2017
Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6110090
24 February 2016
Deficiency Check · COI Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5821458
30 March 2015
Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5093415
10 February 2015
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5067884
14 April 2014
Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4835798
28 March 2014
Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4834262
24 March 2014
Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4878465
15 January 2014
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4787806
18 December 2012
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4505159
15 November 2012
Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4484604
20 March 2012
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4268284
30 January 2012
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4235591
21 November 2011
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4209163
8 September 2011
Administrative Inspection · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4139556
22 December 2010
MTSA Verification · Cargo Tank Internal · Internal Structural Exam · Construction Oversight · Drydock Exam · Initial Certification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3951396
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 February 2025
Resolved
At each inspection for certification the marine inspector must conduct such tests and inspections of the main propulsion and auxiliary machinery...as they feel necessary to check safe operation. Generator in machinery space had excess engine oil accumulated beneath and signs of leakage on the generator. Determine source of leak of provide corrective actions.
46 CFR 61.20-3
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2025
Resolved 3 April 2025
Resolution: Crew ID'd leak and rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 February 2025
Resolved
At each inspection for certification and periodic inspection the marine inspector must conduct such tests and inspections of the main propulsion and auxiliary machinery and of its associated equipment, including the fluid control systems, as they feel necessary to check safe operation. Missing valve handles on fuel supply line for generator and cargo pump engine.
46 CFR 61.20-3
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2025
Resolved 3 April 2025
Resolution: Verified installed valve handles.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 28 February 2025
Resolved
At each inspection for certification and periodic inspection the marine inspector must conduct such tests and inspections of the main propulsion and auxiliary machinery and of its associated equipment, including the fluid control systems, as they feel necessary to check safe operation. Cargo pump gauge indicator panel and starter box for pump motor were held in place with zip ties.
46 CFR 61.20-3
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2025
Resolved 3 April 2025
Resolution: Verified proper mounting of indicator panel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 February 2025
Resolved
At each inspection for certification and periodic inspection the marine inspector must conduct such tests and inspections of the main propulsion and auxiliary machinery and of its associated equipment, including the fluid control systems, as they feel necessary to check safe operation. Coolant hose on top of cargo pump engine was excessively pinched between engine piping. Determine condition of hose and install in a safe manner.
46 CFR 61.20-3
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2025
Resolved 3 April 2025
Resolution: Verified replaced hose.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 28 February 2025
Resolved
All control stations and the individual valves and controls shall be marked as required by § 35.40-10 of the subchapter. Markings for CO2 control box outside machinery space were faded and not easily readable.
46 CFR 34.15-10
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Due 14 March 2025
Resolved 3 April 2025
Resolution: Verified updated marking.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 28 February 2025
Resolved
Each hose must be marked with on eof the following: for oil products, the words "OIL SERVICE". Each hose also must be marked with the following...maximum allowable working pressure; date of manufacture; and date of the latest test required by 33 CFR 156.170. Hoses onboard did not contain all required markings.
33 CFR 154.500
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2025
Resolved 3 April 2025
Resolution: Verified hose markings.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 28 February 2025
Resolved
The cargo handling equipment shall be maintained by the tank vessel's personnel in accordance with the regulations in this subchapter. Lube oil valve handle on port side weatherdeck just aft of machinery house was missing.
46 CFR 35.35-70
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2025
Resolved 3 April 2025
Resolution: Crew stated associated line was no longer in use. In lieu of installing valve, pipe was blanked.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 28 February 2025
Resolved
An oil tanker of 150 GT and above shall also maintain an Oil Record Book Part II. Oil record book Part II entries did not have measurement indicator (bbls, m3, gal) associated with entries and several empty lines throughout the book between entries.
33 CFR 151.25
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 28 February 2025
Resolution: Crew made aware of issues and proper entries going forward.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 17 June 2024
Resolved
no person may use any equipment listed in paragraph (c) of this section for transfer operations unless the vessel or facility operator, as appropriate, tests and inspects the equipment in accordance with paragraphs (b), (c) and (f) of this section and the equipment is in the condition specified in paragraph (c) of this section. Barge found with cargo hose and pipe testing records not meeting the required minimum PSI and with incorrect MAWP listed. 33CFR156.170
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2024
Resolution: Vessel provided objective evidence of satisfactory hose tests.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 17 June 2024
Resolved
At each inspection for certification and periodic inspection the marine inspector shall conduct such tests and inspections of the main propulsion and auxiliary machinery and of its associated equipment, including the fluid control systems, as he feels necessary to check safe operation. Barge generator was inoperable during the inspection and was unable to be tested. 46CFR61.20-3
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2024
Resolved 8 August 2024
Resolution: Received tech report detailing repair of generator. Extended compliance for USCG inspection to 1JUL24. Validated satisfactory operation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 17 June 2024
Resolved
All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. A portable generator was aboard the barge providing power via the shore connection. No type or approval data available for this installation. 46CFR58.10-5(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 August 2024
Resolution: Generator removed from the vessel.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 17 June 2024
Resolved
The plan must cover all geographic areas of the United States in which the vessel intends to handle, store, or transport oil, including port areas and offshore transit areas. Onboard Vessel Response Plan does not show approval for the San Francisco COTP zone. 33CFR155.1030(a)
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 17 June 2024
Resolution: CG-MER-4 office contacted and the documentation discrepancy was resolved.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 17 June 2024
Resolved
Each operator or agent of a vessel with a capacity of 250 or more barrels of fuel oil, cargo oil, hazardous material, or liquefied gas as regulated in Table 4 of 46 CFR part 154, or each person who arranges for and hires a person to be in charge of a transfer of fuel oil, of a transfer of liquid cargo in bulk, or of cargo-tank cleaning, shall designate, either by name or by position in the crew, the person in charge (PIC) of each transfer to or from the vessel and of each tank-cleaning. PIC list aboard the barge was outdated. 33CFR155.700
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 17 June 2024
Resolution: A current PIC list was provided.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 6 June 2023
Resolved
Each nonmetallic transfer hose must:Not burst, bulge, leak, or abnormally distort under static liquid pressure at least 1 1/2 times the maximum allowable working pressure. Cargo/tranfers hoses were found only to be tested to 188 psi with MAWP of 125 psi. All labeled MAWP 150 psi MAWP
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 June 2023
Resolved 14 June 2023
Resolution: Cargo hoses relabled to MAWP of 125psi, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 June 2023
Resolved
Plug cocks shall be constructed with satisfactory and positive means of preventing the plug from becoming loosened or removed from the body when the plug is operated. Cocks having plug locking arrangements depending on cotter pins are prohibited. Fuel drains on racors for cargo pump and generator have through body fuel cock drains installed.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 June 2023
Resolved 14 June 2023
Resolution: Fuel cocks replaced with ball valves, all sat.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 24 February 2016
Resolved
Mark latest test date on cargo piping.
Action required: 705 - Other - as specified
Due 6 May 2016
Resolved 25 April 2016
Resolution: Test dates marked.
Engineering › Fuel Oil Service System › Filter
Issued 24 February 2016
Resolved
Provide additional mechanical closure for fuel filter petcocks.
Action required: 705 - Other - as specified
Due 6 May 2016
Resolved 25 April 2016
Resolution: Closures provided.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 24 February 2016
Resolved
Replace CO2 cabinet hinges.
Action required: 705 - Other - as specified
Due 6 May 2016
Resolved 28 April 2016
Resolution: Hinges replaced.
Deck/Cargo › Holds/Tanks › Tank Level Monitoring Device
Issued 30 March 2015
Resolved
REMOVE THE HIGH LEVEL/OVERFILL HORNS FROM THE HAZARDOUS AREA OR MAKE INTRINSICALLY SAFE. 46CFR111.105-3
Due 8 April 2015
Resolved 14 August 2015
Resolution: Horn relocated back to original position on mast and remains operable.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 30 March 2015
Resolved
CORRECT THE VAPOR LINE MARKINGS ON THE AFT PORT VAPOR HEADER. 46CFR39.2001(h)
Due 8 April 2015
Resolved 14 August 2015
Resolution: Markings now meet 46CFR39.2001(h).
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 24 March 2014
Resolved
Provide repair proposal for 4 identified welds weeping cargo. Welds located at: blkh 27 2.5 longs from CL in void 4S, blkh 17 outboard tank bottom in void 3P, frame 15 outboard tank bottom at rat hole in void 2P, and blkh 27 aft seam of rosebox in void 4P. 46CFR31.10-20(c)
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 March 2014
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 24 March 2014
Resolved
Complete repairs IAW USCG approved repair proposal. 46CFR31.10-25.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 March 2014
Engineering › Generator (propulsion/auxiliary-electric) › Indicator Circuitry
Issued 15 November 2012
Resolved
Demonstrate low L/O, high temp, and overspeed tests on the generator.
Due 16 December 2012
Resolved 13 December 2012
Engineering › Diesel Engine (auxiliary) › Crankcase
Issued 15 November 2012
Resolved
Replace generator crankcase exhaust hose w/manufacture approved crankcase breather assembly or with an approved non-metalic flex hose IAW SAE 1942.
Due 16 December 2012
Resolved 13 December 2012
Engineering › Compressed Air System (control) › Compressor
Issued 8 September 2011
Resolved
Do not operate ship service air compressor and associated equipment until plan review is completed by class (ABS) and witnessed by attending USCG Marine Inspector.
46CFR31.10-5(a)
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 14 August 2015
Resolution: Cleared outstanding CG-835 from 2011 at the request of the Operator and after discussion with the Senior Marine Inspector, [name withheld] was determined that plan review for a self contained portable air compressor was not required.