Records from 2011 to 2025. Most recent: inspection, 14 October 2025.
Documentation record
Registered dimensions (L × B × D)116.0 ft × 35.0 ft × 11.5 ft
Registered tonnagegross 436 / net 297
ITC dimensions (L × B × D)116.0 ft × 35.0 ft × 11.5 ft
ITC tonnagegross 546 / net 163
BuilderHORIZON SHIPBUILDING INC · BAYOU LA BATRE, AL, UNITED STATES · built 2011
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 27 July 2026 · expires 31 August 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it436 - Regulatory (Subpart C or D), Gross Ton
546 - Convention (Subpart B), Gross Ton
297 - Regulatory (Subpart C or D), Net Ton
163 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 18
14 October 2025
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8251698
21 April 2025
Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 8116051
9 June 2023
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7748252
15 December 2022
TPO Audit · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7631286
8 July 2022
Initial Certification · MTSA Verification · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7478260
28 June 2022
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7485332
10 November 2021
Damage Survey
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7349057
9 November 2021
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7348396
3 February 2020
Type not recorded
No type recorded · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 6906862
29 December 2016
Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6078367
18 September 2015
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5728645
28 March 2014
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4826531
7 November 2012
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4480352
15 June 2011
Industry Initiated Exam · DAPI Audit · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4047621
29 May 2011
Type not recorded
No type recorded · Marine Safety Detachment Quad Cities · USCG Heartland District (CGD-H) · Activity 4028352
24 May 2011
Type not recorded
No type recorded · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 4021558
20 May 2011
Type not recorded
No type recorded · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 4021551
22 February 2011
MTSA Verification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3951749
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 15 July 2022
Resolved
An external audit must be conducted no later than 6 months after the issuance of the initial COI for vessels subject to the owner or managing operator's TSMS that have been owned or operated for fewer than 6 months prior to receiving the initial COI. Vessel must conduct external vessel audit within 6 months from COI issuance date.
Action required: 705 - Other - as specified
Due 8 January 2023
Resolved 2 February 2023
Resolution: Received satisfactory audit report that noted a satisfactory engineroom fire was conducted.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 July 2022
Resolved
All crew-members must be familiar with their fire-fighting duties, and, specifically how to fight a fire in the engine room and elsewhere on board the towing vessel. Fire drills were not conducted as per company policy. Conduct drills to the satisfaction of TPO approved surveyor.
Action required: 10 - Deficiency Rectified
Resolved 8 July 2022
Resolution: Additional training on watch station bill and company policy was given to the crew.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 8 July 2022
Resolved
Existing equipment and installations, of a type not required, or in excess of that required by this part, not meeting the applicable requirements of this part may be continued in service so long as they are in good condition and accepted by the local OCMI or TPO. The installed fixed-fire extinguishing system onboard is not ready for use and is tagged out due to parts availability for the system after servicing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 August 2022
Resolved 14 July 2022
Resolution: The fixed fire fighting system was serviced by Hiller and brought back into service.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 8 July 2022
Resolved
Each vessel must be designed and constructed to minimize fire hazards insofar as reasonable and practicable. The MI observed above the watertight door on the bulkhead between the machinery space and the space for storing the fixed fire-fighting agent tanks, the penetration of cables through the bulkhead is not watertight allowing smoke, air and agent to pass freely. Repair bulkhead penetration accordingly.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 August 2022
Resolved 14 July 2022
Resolution: The bulkhead penetration was filled with fire stop to the satisfaction of the TPO.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 8 July 2022
Resolved
Each escape hatch and emergency exit used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR”. The escape hatch from the fixed fire suppression system space to the FWD marine storage space was not labeled.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 July 2022
Resolved 14 July 2022
Resolution: The emergency escape hatch was labeled.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 8 July 2022
Resolved
The master must ensure that all hatches, doors, and other openings designed to be watertight or weather-tight function properly. The water-tight door in the machinery space is fitted with a foam gasket and not a rubber gasket.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 July 2022
Resolved 14 July 2022
Resolution: A rubber gasket was installed on the water tight door to the satisfaction of the TPO.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 July 2022
Resolved
Prior to getting underway for the first time on a particular towing vessel, each crew-member must receive a safety orientation. There were no records of crew-members onboard having received a safety orientation.
Action required: 10 - Deficiency Rectified
Resolved 8 July 2022
Resolution: All crew conducted saety orientation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 November 2021
Resolved
The majority of the major propulsion and power generation equipment suffered significant damage from an engine room fire. Vessel will need to rebuild all equipment compromised by the fire prior to operation.
Action required: 17 - Rectify deficiencies prior to departure
Due 10 November 2021
Resolved 28 June 2022
Resolution: Conducted repair check by operating all new & refurbished machinery. Received new stability and eng test data (uploaded in documents in vessel profile).
20 May 2011Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · at L&D 2 · activity 4021551 24 May 2011Routine · role: Involved in a Marine Casualty · activity 4021558
28 March 2014Routine · role: Involved in a Marine Casualty · activity 4826531
18 September 2015Routine · role: Involved in a Marine Casualty · activity 5728645
9 November 2021Major Marine Casualty · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 7348396
9 June 2023Routine · role: Involved in a Marine Casualty · activity 7748252
21 April 2025Routine · role: Transiting Vicinity of Primary Subject · activity 8116051
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source:
IIR, through 2026.