Inspection history · 21
14 April 2025
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 8111546
8 January 2025
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8088764
16 September 2024
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7996870
27 October 2023
Administrative Inspection · Internal Structural Exam · Deficiency Check · Periodic Inspection · Drydock Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7815170
16 April 2022
Internal Structural Exam · Administrative Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7432302
16 April 2022
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7432998
26 October 2021
Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7339877
10 February 2021
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7138845
13 July 2020
Deficiency Check · In-Service Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7005308
31 August 2019
Spot Check · Annual Inspection · Administrative Inspection · Internal Structural Exam · Hull Examination · Damage Survey · Examination of Repairs · Drydock Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6826243
10 January 2019
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6609673
17 October 2017
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6289522
31 May 2017
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6161775
19 October 2016
COI Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6025931
7 October 2016
Internal Structural Exam · Hull Examination · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6020411
11 December 2015
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5777315
6 August 2015
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 5232046
29 October 2014
Periodic Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5014233
10 October 2014
Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5004673
15 October 2013
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4728319
30 November 2012
Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4491118
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 7 November 2023
Resolved
All calculations required by this subchapter must be submitted with the plans required by § 170.075 of this subpart. Calculations must account for the weight of all loads carried aboard the vessel. 46 CFR 170.090 vessel has installed large metal screening device on hopper top which is not reflected in stability documents
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2023
Resolved 8 January 2024
Resolution: Submitted to MSC with a MSC id# 2319285
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 7 November 2023
Resolved
Manholes and flush scuttles in position 1 or 2 or within superstructures other than enclosed superstructures shall be closed by substantial covers capable of being made watertight. Port aft rake void and stbd fwd void hatch gaskets observed in unsatisfactory condition. 46 CFR 42.15-40
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2023
Resolved 8 November 2023
Resolution: Installed new gaskets, chalk tested witnessed by ABS. deficiency rectified.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 7 November 2023
Resolved
There shall be at least two means of escape from where the crew may be quartered or normally employed. Emergency escape hatch in engine compartment unable to be opened. 46 CFR 92.10-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2023
Resolved 15 November 2023
Resolution: Hatch was lubricated and video evidence submitted showing operation.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 November 2023
Resolved
Electric installations on vessels must ensure maintenance of system integrity through compliance with the applicable system requirements (IEEE, NEC, IEC, etc.) to which plan review has been approved. Twist-on type wire connectors were observed splicing wires together on the ascending unit for fuel tank. 46 CFR 111.01-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2023
Resolved 15 November 2023
Resolution: replaced with crimp type connectors
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 November 2023
Resolved
Electric equipment must be arranged, as far as practicable, to prevent mechanical damage to the equipment from the accumulation of dust, oil vapors, steam, or dripping liquids. Alternator was covered in oil including the windings. 46 CFR 111.01-3
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2023
Resolved 8 November 2023
Resolution: Cleaned altnerator and windings. Deficiency rectified.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 November 2023
Resolved
Each battery tray must be chocked with wood strips or their equivalent to prevent movement. Batteries not secured. 46 CFR 111.15-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2023
Resolved 15 November 2023
Resolution: installed a battery tie down system to prevent shifting.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 November 2023
Resolved
The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter F. The level indicator for the SCOW hydraulics was not mounted properly. 46 CFR 96.03-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2023
Resolved 15 November 2023
Resolution: recieved photographic evidence that the TLI was mounted with metal banding.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 November 2023
Resolved
Vessels assigned a load line shall have the deck line and the load line marks permanently scribed or embossed as required by subchapter E. Load Line on hull not IAW Load Line Certificate or requirements of subchapter E. 46 CFR 97.40-15
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2023
Resolved 15 November 2023
Resolution: Deficiency rectified.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 April 2022
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs. Vessel broke away from its mooring arrangement and was reported aground when first discovered. Make the vessel available for inspection prior to operations.
46 CFR 91.30-1
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 19 April 2022
Resolution: Conducted damage survey; NSTR.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 26 October 2021
Resolved
Nav light screens painted glossy; need to correct to matte black.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 November 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 October 2021
Resolved
Cable free from cableway and hanging down at front of house; needs to be secured.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 November 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 October 2021
Resolved
Nonmetallic flex hose on H pack was over 45" in length; needs to be replaced to be 30" max.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 November 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 October 2021
Resolved
Fuel shutoff placard was painted over and covered.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 November 2021
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 11 February 2021
Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. During operational test of machinery, noticed excessive amount of oil in radiator; Constitutes a fire hazard. 46 CFR 92.05-1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 March 2021
Resolved 15 February 2021
Resolution: Cleaned; see documents for photo
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 11 February 2021
Resolved
There shall be two means of escape from all general areas accessible to the passengers, if carried, or where the crew may be quartered or normally employed. Crew not able to open escape hatch in machinery space on deck. 46 CFR 92.10-5
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 March 2021
Resolved 15 February 2021
Resolution: Crew able to open hatch.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 February 2021
Resolved
Portable extinguishers must be inspected and maintained in accordance with NFPA 10. Portable fire extinguisher in machinery space on deck needs annual servicing. 46 91.25-20
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 March 2021
Resolved 18 February 2021
Resolution: Annual servicing complete by Hiller
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 11 February 2021
Resolved
Sidelights mean a green light on the starboard side and a red light on the port side each showing an unbroken light over an arc of the horizon of 112.5 degrees and so fixed as to show the light from right ahead to 22.5 degrees abaft the beam on its respective side.
Sidelights arc less than 112.5 degrees. 33 CFR 83.21(b)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 March 2021
Resolved 15 February 2021
Resolution: Cut mating to meet the 112.5 degree requirement, see documents for photos
01 - Certificates & Documentation › 013 - Documents › SOPEP
Issued 11 February 2021
Resolved
Shipboard oil pollution emergency plan (SOPEP) must be in accordance with the language and requirements set forth in regulations. SOPEP content not meeting regulations. 33 CFR 151.26
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 March 2021
Resolved 2 March 2021
Resolution: SOPEP updated to meet contents required in regs.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 11 February 2021
Resolved
Vessel response plan (VRP) must be in accordance with the language and requirements set forth in regulations. VRP content not meeting regulations. 33 CFR 155.5030
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 March 2021
Resolved 2 March 2021
Resolution: VRP updated to meet content as required in regs.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 13 July 2020
Resolved
The certificate will describe the conditions under which it is issued, and will be endorsed as applying to an unmanned seagoing barge. COI states "Solid cargo or spoils may not be carried (peaked) above the top of the hopper coamings."
Company was notified previously to stop this practice verbally. Barge was peaked and had spoils higher than coamings
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 13 July 2020
Resolution: Vessel redistributed spoils.
Engineering › Fuel Oil Service System › Hose
Issued 7 November 2016
Resolved
Replace or fire sleeve 02 hose for F/O system that do not meet SAE J-1942
Due 7 December 2016
Resolved 9 November 2016
Resolution: Both hose were replaced with Parker 221-FR and verified as approved per SAE J-1942-1
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 November 2016
Resolved
Replace wire nuts on solenoid valve with crimp on style connectors or solder connections.
Due 7 December 2016
Resolved 9 November 2016
Resolution: Wire nuts were replaced with crimp on connectors and a cover is to be installed on the housing.
Electrical › Electrical Distribution System (service) › Switch
Issued 7 November 2016
Resolved
Securely mount toggle switch in control box on outboard side of hydraulic tank
Due 7 December 2016
Resolved 9 November 2016
Resolution: Toggle switch was securely mounted inside the enclosure box.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 November 2016
Resolved
Remove or properly dead end cable ends at underneath side of control box mounted inside equipment house.
Due 7 December 2016
Resolved 9 November 2016
Resolution: Dead end cables were determined to powero a set of mast lights that were no longer in use and were properly terminated.
Construction/Loadline › Structures › Deck Plating
Issued 30 November 2012
Resolved
Repair and renew insets on deck up forward prior to or at next drydock. 46 CFR 91.25-50
Action required: 705 - Other - as specified
Resolved 24 October 2014
Resolution: Inspected insets on deck up forward, deficiency issued by Sector St. Pete. Insets did not constitute reasons for concern as there were no signs of cracks or affected structural members in the forward rake. Confirmed with ABS as they in agreement; cleared
Documentation › Certificates/Documents › International Air Pollution Prevention Certificate
Issued 30 November 2012
Resolved
Provide fuel oil sample records and proof of ABS IAPP endorsement prior to sailing international. MARPOL
Action required: 705 - Other - as specified
Resolved 12 December 2012
Resolution: Barge has surrendered its IAPP and will travel on domestic voyages only.
Construction/Loadline › Hull › Bottom Plating
Issued 30 November 2012
Resolved
Provide anti-fouling documentation prior to sailing international. AFS/CONF/26
Action required: 705 - Other - as specified
Resolved 12 December 2012
Resolution: Barge is now limited to domestic voyages only as per its COI, so IAFS compliance documentation no longer needs to be verified.
Construction/Loadline › Markings › Load Line Mark
Issued 30 November 2012
Resolved
Ensure load line is properly marked. 46 CFR 92.01-5
Due 30 December 2012
Resolved 12 December 2012
Resolution: Load line properly repainted.