Records from 2016 to 2026. Most recent: inspection, 18 August 2026.
Inspection history · 21
18 August 2026
PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8467072
13 May 2024
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7898239
24 April 2024
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7900716
5 December 2023
Deficiency Check · In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7833836
1 December 2023
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7832278
4 October 2021
PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7326033
7 November 2020
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7091348
8 January 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6607190
4 January 2019
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6605836
4 January 2019
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6609931
26 December 2018
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6602633
25 December 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6602965
23 December 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6602184
9 July 2018
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6465389
7 July 2018
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6470114
4 July 2018
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6466571
1 July 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6462436
22 June 2017
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6173294
16 March 2016
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5834412
11 March 2016
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5829044
10 March 2016
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5830956
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 18 August 2026
No resolution recorded
The company should establish procedures to ensure that the ship in maintained in conformity with the provisions of the releventrules and regulations and with any additional requirements which be established by the company. The technical and/or operational nature of deficiencies 02 and 04 provide objective evidence of a serious ailure, or lack of effectiveness, of the implementation of the ISM Code. A corretive action report is required to be submitted to the OCMI prior to the clearance of this deficiency.
74SOLAS(24)IX/3.1 ISM part A/10.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 18 August 2026
Resolved
Fire fighting systems shall be maintained and ready for use. PSCO observed that the CO2 system had 03 cylinders with pins rendering those bottles ineffective. PSCO identified 03 months prior maintenance records attesting to the operational status of the system.
74SOLAS(09)ll-2/14.1.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 August 2026
Resolution: PSCO received class survey
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 18 August 2026
Resolved
No electrical equipment shall be installed in any space where flammable mixtures are liable to collect. PSCO observed EX rated lighting in the paint locker that was missing components rendering it out of complinace.
74SOLAS(04)ll-1/10.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 August 2026
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 18 August 2026
Resolved
The following systems shall be kept in good order so as to ensure their required preformance if a fire occurs; means of escape systems and appliances. PSCO observed 03 EEBD's significantly over pressurized. PSCO observed 03 months of prior maintenance records attesting to the operational status of the system.
74SOLAS(09)ll-2/14.1.1.3
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 18 August 2026
Resolved 18 August 2026
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 August 2026
No resolution recorded
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids, means shall be provided to control leaks of flammable liquids. PSCO observed feul oil accumulation in the main service generator number 3 near the fuel injectors.
74SOLAS(09)ll-2/4.1.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 18 August 2026
Resolved
The carriage of solid bulk cargos other than grain shall be in compliance with the relevant provisions of the IMSBC certificate in reference to self-heating cargoes.
74SOLAS(24)VI/1-2
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 18 August 2026
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 13 May 2024
Resolved
The International Load Line Certificate shall not be delivered to the ship until the officer or surveyor acting under the provisions of article 13 of the present Convention has certified that the marks are correctly and permanently indicated on the ship's side. PSCO observed 2 separate load line markings painted on both the port and starboard side of the vessel.
ICLL (88 prot) Reg 9
40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 May 2024
Resolution: crew repainted correct load line and painted over old lines to match hull color on both sides
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 5 December 2023
Resolved
Means shall be provided to control leaks of flammable liquids. PSCO observed that the vessels bilge had an excessive amount of fuel oil throughout the bilge especially forward of the main engine. This fuel accumulation was the result of an overfill of fuel on or about 24 NOV 2023. In addition PSCO observed that the #1 generator had excessive fuel oil in and around the fuel filters.
SOLAS 2004 II-2/4.1
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 5 December 2023
Resolved 24 April 2024
Resolution: excessive oil removed from bilge and cleaned. A/E 1 overhauled and tested satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 5 December 2023
Resolved
Ships shall be provided with fire pumps, fire mains, hydrants and hoses complying with the applicable requirements of this regulation. PSCO observed excessive leaking on a valve on the fire main located near vessel's ballast treatment system.
SOLAS 2020 II-2/10.2
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 5 December 2023
Resolved 7 December 2023
Resolution: "Valve at the fire main the drives the eductor for leak repair." Crew tightening packing around the steam.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 December 2023
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. It was reported that the vessel suffered a reduction in maneuverability on or about 05 DEC 2023 while transiting to berth on the Chesapeake Bay.
SOLAS 2020 I/11
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 5 December 2023
Resolved 7 December 2023
Resolution: Primary fuel oil filter was replaced. Crew demonstrated OPS of engines w/fuel oil pressure, no alarms was present.
Deck/Cargo › Holds/Tanks › Coaming
Issued 22 June 2017
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will fit to proceed to sea without danger to the ship or persons on board. Moderate corrosion on multiple hydraulic lines around hath coamings on deck. Increasing risk of pollution spill and risk to crew. 14 SOLAS (14)1/II(A)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 22 July 2017
Resolved 9 July 2018
Resolution: PSCO did not observed no corrosion on hydraulic lines.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Valves
Issued 11 March 2016
Resolved
0725: Fire protection systems and fire fighting systems and appliances shall be maintained and ready for use. PSCO observed that all of the water mist branch line valves were in a closed position preventing the water mist system from discharging automatically as designed. This is in conflict with shipboard procedures. 74 SOLAS (2014) II-2/14.1.1 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2016
Resolution: Received class report: All branch valves for engine room local fire fighting water mist system were found in the open position.
Lifesaving › Lifeboat Equipment › Food Ration
Issued 11 March 2016
Resolved
0611: A lifeboat must carry a food ration for each person the lifeboat is permitted to accommodate; these rations shall be kept in air tight packing. The lifeboat has a capacity of 24 persons and the PSCO observed only 20 air tight rations. 74 SOLAS (2014) III/31.1.2.1 LSA IV/4.4.8.12 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2016
Resolution: Recieved class report: Vessel order additional food ration and undersigned Surveyor found 30 food rations onboard.
Engineering › Fuel Oil Service System › Piping
Issued 11 March 2016
Resolved
0750: PSCO observed fuel leaking excessively on the port generator below the fuel filters, approximately 1 drop per second. 74 SOLAS (2014) II-2/4.2.2 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2016
Resolution: Received class report: Port side auxiliary generator was observed in operation and no leaks were found below the fuel filters.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 11 March 2016
Resolved
1270: Doors fitted in boundary bulkheads of machinery spaces of category A shall be self closing. The steering room door self closing device and latching mechanism have been removed. Per the ships fire control plan, this is a self closing category A door. 74 SOLAS (2014) II-2/9.4.2.1 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2016
Resolution: Received class report: Door from engine room to steering gear room was found to have self closing device installed and was operated satisfactory.
Documentation › Logs/Records › Logbook (official)
Issued 11 March 2016
Resolved
1500: 12 hours before entering the navigable waters of the United States, the following equipment shall be tested: primary and secondary steering gear. PSCO observed that the steering gear test was completed under a 12 hour period. 33CFR 164.25 (a)(1) 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 9 July 2018
Resolution: PSCO verified via official logbook that the steering gear test had been completed prior to entry.