Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 13.0 ft
Registered tonnagegross 1,754 / net 1,754
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderORANGE SHIPBUILDING CO INC · ORANGE, TX, UNITED STATES · built 2012
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portBALTIMORE, MD
Endorsements, as the file codes themcw_un, reg_nfv
DocumentationValid · issued 10 February 2026 · expires 28 February 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1754 - Simplified, Gross Ton
1754 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 35 inspections, each with its date, unit and type; 17 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 4 other vessels inspected with it; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 35
21 May 2026
Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8378329
11 April 2025
MTSA Verification · Internal Structural Exam · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8110147
5 March 2025
Damage Survey
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8088843
24 May 2024
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7922555
22 August 2023
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7774332
10 April 2023
Administrative Inspection · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7668486
31 March 2022
Cargo Tank Internal · Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7422331
14 February 2022
Administrative Inspection · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7396165
3 May 2021
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7189030
18 March 2021
Annual Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7157817
22 February 2021
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7144218
9 June 2020
MTSA Verification · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6998702
25 March 2020
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6931477
26 February 2020
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6916371
24 May 2019
Annual Inspection · MTSA Verification
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6751770
25 May 2018
MTSA Verification · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6499127
13 March 2017
COI Inspection · MTSA Verification · SIP Inspection/Audit
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6099773
28 February 2017
Internal Structural Exam · Cargo Tank Internal · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6093454
14 July 2016
MTSA Verification · SIP Inspection/Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5940822
20 June 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5915388
1 March 2016
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5824827
10 December 2015
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5779321
10 November 2015
Administrative Inspection · SIP Initial Entry
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5760820
19 May 2015
Internal Structural Exam · SIP Inspection/Audit · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5129270
6 October 2014
Deficiency Check · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5001257
5 October 2014
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5000488
12 May 2014
MTSA Verification · SIP Inspection/Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4864091
29 April 2014
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4846345
26 April 2014
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 4845598
28 January 2014
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4792085
13 December 2013
Examination of Repairs
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4770652
17 November 2013
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4860382
24 July 2013
MTSA Verification · SIP Inspection/Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4689706
23 July 2013
SIP Initial Entry · Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4689708
13 December 2011
Cargo Tank Internal · Hull Examination · Construction Oversight · Internal Structural Exam · Initial Certification · Deadweight Survey · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4207462
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 22 August 2023
Resolved
Deficiency #1 issued under activity #7668486 on 4/10/23 is amended as follows:
No extensive alterations involving the safety of a tank vessel either in regard to hull or machinery shall be made without the approval of the Commandant. Before such alterations are carried out, copies of plans and specifications in triplicate for the work involved shall be forwarded to the Officer in Charge, Marine Inspection, in whose zone the repairs will be made, for submission to Headquarters for approval. If approved one set of the plans and specifications, properly stamped and dated, shall be returned to the owner or to the repair yard designated by the owner; one set to the Officer in Charge, Marine Inspection, who forwarded the plans and specifications to Headquarters; and one set shall be retained at Headquarters.
Plans were submitted to MSC (Orange Shipbuilding Dwg. No. P-01, Rev. 5, “Cargo Piping System,” 4 sheets, dated July 10, 2023) and subsequently approved by MSC in letter E1-2302596 dated 7/21/23, with provision that the installation, workmanship and testing shall be accomplished to the satisfaction of the cognizant OCMI.
A Marine Inspector attended the vessel on 8/22/23 to verify the installation, workmanship, and testing with reference to the approved plans. The following items were noted as in need of rectification:
#1 The plans call for fixed containment under the manifold of at least 1 barrel in size, but the current spill pan of 30 inches x 24 inches x 12 inches in size does not provide for at least 1 barrel capacity as called for on the plan and required by regulation (33 CFR 155.310).
#2 The current arrangement does not provide a means for carrying out annual hydrostatic testing of the piping leading up the air separator as required by regulation (33 CFR 156.170), and there is no record of this section of piping being hydrotested since its installation onboard.
Rectify both these noted items to the satisfaction of the cognizant OCMI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 September 2023
Resolved 26 October 2023
Resolution: verify the actual onboard installation against the MSC approved plans.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 10 April 2023
Resolved
No extensive alterations involving the safety of a tank vessel either in regard to hull or machinery shall be made without the approval of the Commandant. Before such alterations are carried out, copies of plans and specifications in triplicate for the work involved shall be forwarded to the Officer in Charge, Marine Inspection, in whose zone the repairs will be made, for submission to Headquarters for approval. If approved one set of the plans and specifications, properly stamped and dated, shall be returned to the owner or to the repair yard designated by the owner; one set to the Officer in Charge, Marine Inspection, who forwarded the plans and specifications to Headquarters; and one set shall be retained at Headquarters.
There is no objective evidence available at present that the tug fueling arrangement on the vessel, which has been added since initial plan review and construction, has been reviewed by the CG Marine Safety Center (MSC).
Submit plans to MSC ([email withheld]) for the arrangement, and make barge available for any follow-on verifications by the local OCMI that are necessary.
Updated 11 July 2023: plans have been submitted to MSC. The deficiency due date has been extended until 26 August 2023. Upon receipt of MSC plan review/approval letter, an attending Marine Inspector to verify that the onboard arrangements correspond with the approved plans and any OCMI to verify comments from MSC.
Action required: 705 - Other - as specified
Due 10 July 2023
Resolved 22 August 2023
Resolution: Amended deficiency #01a issued on 8/22/23 to replace this deficiency. Revised plans were submitted to MSC and approved by letter E1-2302596. Verification by the attending Marine Inspector of the actual onboard installation noted several issues.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 February 2022
Resolved
46 CFR 110.30-7 & 111.30
Repairs or Alterations
The Officer In Charge Marine Inspection (OCMI) must be notified before-
(a) Alterations or Modifications that deviate from approved plans; or
(b) Repairs, Alterations, or Modifications that affect the safety of the vessel.
During COI Inspection the switchboard had nameplates and breakers that are not arranged / sized or labeled appropriately.
Submit plans for approval reflecting the changes made to the electrical system to cognizant OCMI
or restore the electrical system to the approved operational state as per the approved electrical drawings.
To completed prior to completion of upcoming dry dock.
Action required: 705 - Other - as specified
Resolved 21 April 2022
Resolution: Local MI verified proper installation of switchboard
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 18 March 2021
Resolved
Replace the aft 1S hatch gasket and aft 2S hatch gasket.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 April 2021
Resolved 4 June 2021
Resolution: Received pictures of new gaskets installed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 18 March 2021
Resolved
Cracked weld identified in the forward rake at the starboard head log. Make repairs prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 21 April 2022
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 19 May 2015
Resolved
Expired pain reliever found in first aid kit
Action required: 705 - Other - as specified
Due 19 May 2015
Resolved 19 May 2015
Resolution: Expired item disposed of, replacement already in kit.
Deck/Cargo › Mooring/Anchoring › Anchor Cable
Issued 19 May 2015
Resolved
Visually examine anchor and associated equipment. Looking for significant wear, corrosion or other deterioration which could affect safe operation of system.
Action required: 705 - Other - as specified
Due 19 May 2015
Resolved 19 May 2015
Deck/Cargo › Mooring/Anchoring › Anchor Cable
Issued 19 May 2015
Resolved
Ensure satisfactory maintenance, condition and lubrication.
Action required: 705 - Other - as specified
Due 19 May 2015
Resolved 19 May 2015
Resolution: Pay out cable, inspect and lube while respooling.
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 19 May 2015
Resolved
Fuel transfer hose 2- 0197 has multiple kinks, Needs to be replaced.
Action required: 705 - Other - as specified
Due 19 May 2015
Resolved 19 May 2015
Resolution: Replaced with new hose.
Deck/Cargo › Mooring/Anchoring › Anchor Chain (general)
Issued 19 May 2015
Resolved
Ensure documentation of monthly testing is current.
Action required: 705 - Other - as specified
Due 19 May 2015
Resolved 19 May 2015
Resolution: shore side will need to make a maintenance schedule
Deck/Cargo › Mooring/Anchoring › Anchor Chain (general)
Issued 19 May 2015
Resolved
Review vessel log to ensure crew is making proper entries.
Action required: 705 - Other - as specified
Due 19 May 2015
Resolved 19 May 2015
Resolution: Tug crews must make entires if they anchor barge.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Lighting
Issued 19 May 2015
Resolved
Both loading lights and port floodlight are inop. (Written by [name withheld])
Due 19 May 2015
Resolved 19 May 2015
Resolution: Philly maint corrected on scene.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 19 May 2015
Resolved
Exhaust leaks identified on generator and both pump engines. (Written by [name withheld])
Due 19 May 2015
Resolved 19 May 2015
Resolution: Exhaust leaks identified and addressed.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Pressure Gauge
Issued 19 May 2015
Resolved
Portable fire extinguisher inside quarters needs to be re-charged/ replaced. (Written by [name withheld])
Due 19 May 2015
Resolved 19 May 2015
Resolution: New extinguisher was place onboard.
Pollution Prevention/Response › Prevention Equipment › Emergency Towing Capability
Issued 6 October 2014
Resolved
Return emergency tow line to original rigged position prior to leaving city dock.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 8 October 2014
Resolution: Temp repaired towline using nylon line to starboard side bow timberhead. ALL SAT
Lifesaving › Lifebuoys › Serviceable
Issued 24 July 2013
Resolved
Both life rings on board are starting to wear
Due 24 July 2013
Resolved 24 July 2013
Resolution: Replaced both life rings with new ones.
Deck/Cargo › Mooring/Anchoring › Anchor Cable
Issued 24 July 2013
Resolved
Anchor cable "birdnested"
Due 24 July 2013
Resolved 24 July 2013
Resolution: Cable was payed out, straightened, and rewrapped.