CBR 2016 is a 2012 tank barge. The Coast Guard has recorded 19 inspections since 2012, most recently in July 2026, along with 8 deficiencies, 1 operational control and 1 casualty investigation in 2013.
Records from 2012 to 2026. Most recent: inspection, 17 July 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCONRAD SHIPYARD LLC · MORGAN CITY, LA, UNITED STATES · built 2012
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portMORGAN CITY, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 8 June 2026 · expires 31 July 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton 1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 15 August 2025Resolved
46 CFR 31.10-15 (b): The inspection for certification shall include an inspection of the structure, boilers, and other pressure vessels, machinery and equipment. The inspection shall be such as to insure that the vessel, as regards the structure, boilers, and other pressure vessels and their appurtenances, piping, main and auxiliary machinery, electrical installations, life-saving appliances, fire-detecting and extinguishing equipment, pilot boarding equipment, and other equipment is in satisfactory condition and fit for the service for which it is intended, and that it complies with the applicable regulations for such vessels.
- Portion of cargo pump stripping pipe cut out to arrange for new fitting to pump.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 22 August 2025
Resolved 15 August 2025
Resolution: Welded section of piping in place with the correct fitting to the cargo pump attached.
02 - Structural Conditions › N/A - No Subsystem › Cargo tank vent system
Issued 15 August 2025Resolved
46 CFR 30.10-25: The term flame screen means a fitted single screen of corrosion-resistant wire of at least 30 by 30 mesh, or two fitted screens, both of corrosion-resistant wire, of at least 20 by 20 mesh, spaced not less than 1/2 inch or more than 11/2 inches apart.
- Flame screen for VCS excessively corroded and in need of replacement.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 22 August 2025
Resolved 15 August 2025
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 9 September 2024Resolved
Each cargo tank of a tank barge must have one of the following liquid overfill protection arrangements: An intrinsically safe overfill control system that has at least one tank overfill sensor switch per cargo tank that is designed to activate an alarm when its normally closed contacts are open. Marine Inspectors (MIs) couple not test the overfill and high level alarms due to a malfunction at the electrical panel housing the alarm components. MIs also overved water ingress into the lanel. Vessel must provide objective evidence attesting to the proper operation of the overfill protection devices and MIs must witness a satisfactory test proor to the loading of cargo.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 September 2024
Resolved 16 September 2024
Resolution: Witnessed satisfactory testing of the high level and overfill alarms.
01- 01199-Vessel is required to maintain annual inspections to keep the issued COI valid. Vessel was issued COI on 24FEB16, and the last annual inspection was completed 23MAY19.The vessel was found to be operating without a valid COI. Vessel has an outstanding deficiency from 23MAY19 inspection. Vessel is prohibited from operating until it obtains a new COI. 46CFR31.10-17 17C
Action required: 10 - Deficiency Rectified
Due 12 June 2020
Resolved 18 June 2020
Resolution: Conducted annual inspection.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 23 May 2019Resolved
When testing high level and overfill alarms. Multiple tanks were only signaling overfill but not high level. Ensure tank liquid overfill protection system is fully functional. Deficiency must be cleared prior to loading cargo.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 6 June 2019
Resolved 18 June 2020
Resolution: Tested all High level and overfill alarms. Test Sat
Deck/Cargo › Vapor Control Systems › Fixed Vapor Collection Arms
Issued 9 March 2017Resolved
Cargo authority is restricted to non-polymerizing cargos IAW the approved COI-CAA #C1-1201224, until an internal inspection can be completed. 46 CFR 39.2014
Action required: 705 - Other - as specified
Due 9 April 2017
Resolved 10 March 2017
Resolution: Owner Rep opened up the system for inspection; SAT
Pressure-Vacuum relief valves must be bench tested ashore every 5 years. The current PV Valve's last test was on 09MAR12. Provide test report. 46 CFR 151.04-5(g)
Action required: 705 - Other - as specified
Due 9 April 2017
Resolved 10 March 2017
Resolution: Owner Rep installed new PV valve and provided test report; SAT
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 9 August 2012Resolved
Provide valid COFR onboard vessel
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 August 2012
Resolution: Valid COFR onboard Vessel
11 January 2013Routine · role: Involved in a Marine Casualty · activity 4514749
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.