Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)55.2 ft × 22.0 ft × 8.0 ft
Registered tonnagegross 102 / net 69
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderRAYCO SHIPBUILDERS & REPAIRS INC · BAYOU BLUE, LA, UNITED STATES · built 1972
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW ORLEANS, LA
Endorsements, as the file codes themcw_un
DocumentationValid · issued 16 April 2026 · expires 31 May 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it102 - Regulatory (Subpart C or D), Gross Ton 69 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 34 inspections, each with its date, unit and type; 12 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 12 other vessels inspected with it; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 22 September 2022Resolved
Electrical connections must be suitably installed to prevent them from coming loose through vibration or accidental contact. Marine Inspector observed screw on type wire connectors installed on both generator fuel system wiring components. Owner/operator replaced connectors with on-hand replacements meeting the requirement stated above.
46CFR143.400(e)
10c.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 22 September 2022
Resolved 22 September 2022
Resolution: Onboard tech replaced connecting devices.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 22 September 2022Resolved
When operating a vessel on a body of water where the discharge of treated or untreated sewage is prohibited by the Environmental Protection Agency under 40 CFR 140.3 or 140.4, the operator must secure each Type I or Type II device in a manner which prevents discharge of treated or untreated sewage. Marine Inspector identified no means of securing the MSD to prevent discharge of untreated sewage. Owner/operator stated intentions of leaving a locking device in the vicinity of the discharge valve to comply with above stated regulation. Documentation (photo) to be provided to the satisfaction of the attending Marine Inspector of the execution of intent regarding locking device.
33CFR159.7(b)
50c.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2022
Resolved 30 September 2022
Resolution: Recieved photo documentaion from represenative displaying means of securing the MSD to prevent discharge of untreated sewage.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 September 2022Resolved
Any piping system that penetrates the hull below the waterline must be fitted with an accessible valve, located as close to the hull penetration as is practicable, for preventing the accidental admission of water into the vessel either through such pipes or in the event of a fracture of such pipe. The valve must be clearly marked by labeling or color coding that enables the crew to identify its function. Marine Inspector identified both port and starboard main propulsion engine keel cooler thru hull piping lacked required valves. Owner/operator to modify piping system to comply with stated regulation.
46CFR143.250(d)
50c.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2022
Resolved 6 October 2022
Resolution: Recieved photo documentation of newly installed valves as per requirement.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 22 September 2022Resolved
Portable and semi-portable fire extinguishers must be inspected, maintained, and tested in accordance with the inspection, maintenance procedures, and hydrostatic pressure tests required by Chapters 7 and 8 of NFPA 10, Standard for Portable Fire Extinguishers (incorporated by reference, see § 136.112 of this subchapter), with the frequency specified by NFPA 10 and as amended here. MI noted monthly inspection and documentation of portable fire extinguishers was not completed. Owner/operator is required to fulfill the requirements of NFPA 10, chapter 7 and provide documentation to the attending Marine Inspector as proof of completion.
46CFR142.240(a)(1)(ii)
50c.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 September 2022
Resolved 26 September 2022
Resolution: Recieved a photo of newly implemented maintenance schedule requiring logging as per requirement.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 14 September 2021Resolved
The master of a towing vessel must ensure that each crewmember participates in fire-fighting drills and receives instruction at least once each month.
Vessel only performs one fire drill per month and could not provide evidence for a fire drill conducted in August. Provide a Corrective action plan to ensure that all crew members participate in a fire drill each month.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2021
Resolved 6 October 2021
Resolution: Corrective action plan provided
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 September 2021Resolved
Pressure vessels over 5 Cubic feet in volume and over 15 PSI MAWP must be equipped with an indicating pressure gauge and with one or more spring loaded relief valves. The total relieving capactiy of such relief valves must prevent pressure from exceeding the MAWP as established by the manufacturer, by more than 10 percent.
Pressure relieve valves were 200 MAWP and gauge had a max pressure of 160. Replace relieve valves with a valve that relieves before the MAWP and replace the gauge with one that reads a full range exceeding the MAWP of the tank.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2021
Resolved 6 October 2021
Resolution: New relief valve installed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 September 2021Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards... Electrical connections must be suitably installed to prevent them from coming lose through vibration or accidental contact.
Vessel had open wiring under the wheel house, MSD was not permanently wired and had two plugs hanging from the ceiling, and battery boxes were not secured and missing a lid.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 September 2021
Resolved 6 October 2021
Resolution: New connections installed.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Safety and environment policy
Issued 14 September 2021Resolved
Prior to getting underway for the first time on a particular towing vessel, each crewmember must receive a safety orientation.
Vessels deck hand had not received vessel orientation and was on the second hitch. First hitch was cut short at 7 days.
Action required: 10 - Deficiency Rectified
Resolved 14 September 2021
Resolution: Master provided vessel orientation to deckhand.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 29 September 2020Resolved
Machinery and electrical system must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Fire main system was spraying water when the fire pump was energized. Repair fire main within 7 days to the satisfaction of the marine surveyor.
Action required: 705 - Other - as specified
Due 6 October 2020
Resolved 1 October 2020
Resolution: Received video evidence of the pipeline connection leak free duing operaton.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 29 September 2020Resolved
Individuals, who are not crew members, on board a towing vessel must receive a safety orientation prior to getting underway or as soon as practicable thereafter to include: Emergency procedures.
Deck hand did not give an adequate orientation and was unsure of where the muster or assembly point was located. The master was questioned and had a different location than the deck hand. Provide a corrective action plan with training provided to all crew members on board within 14 days.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 October 2020
Resolved 30 September 2020
Resolution: Received corrective action plan to provide training to company personal and verify on board compliance throughout the month.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 29 September 2020Resolved
Masters responsibilities. The master of a towing vessel must ensure that drills are conducted and instructions are given to ensure that all crew members are capable of performing the duties expected of them during emergencies. Master performed the fire drill and did not preform the drill in a realistic manner. Failed to make notifications and other parts of the vessels procedures. Provide a corrective action plan along with training for all licensed mariners on proper procedures on running a drill.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 October 2020
Resolved 30 September 2020
Resolution: Received corrective action plan to provide training to company personal and verify on board compliance throughout the month.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 29 September 2020Resolved
Personnel dispatched from the vessel or that are working in an area on the exterior of the vessel without rail must wear a life jacket or a work vest approved by the commandant. When worn at night, the work vest must be equipped with a light that meets the requirements of 46 CFR 141.340(g)(1).
Action required: 10 - Deficiency Rectified
Resolved 29 September 2020
Resolution: Vessel destroyed 02 work vest and replaced them with Type V. Installed lights on all work vest on board.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.