Records from 2012 to 2025. Most recent: inspection, 5 December 2025.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCONRAD ORANGE SHIPYARD INC · ORANGE, TX, UNITED STATES · built 2012
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry, non-fishing vessel
DocumentationValid · issued 16 September 2025 · expires 30 September 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Net Ton
1619 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 19
5 December 2025
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8279797
24 February 2022
COI Inspection · Examination of Repairs · Cargo Tank Internal · Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7401610
8 February 2021
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7137409
20 August 2020
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7038250
29 July 2020
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7019797
8 January 2019
Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6607086
17 December 2018
Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6599923
17 December 2018
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6632444
19 September 2017
COI Inspection · Examination of Repairs · MTSA Verification · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6267215
14 October 2016
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6019901
4 December 2015
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5775315
19 November 2015
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5766688
23 October 2015
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5751325
21 November 2014
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5027611
22 May 2014
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4865273
2 May 2014
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4848957
28 October 2013
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4743368
18 July 2013
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4656934
13 November 2012
Construction Oversight · Internal Structural Exam · Drydock Exam · Initial Certification · Cargo Tank Internal · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4483650
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 29 July 2020
Resolved
Scantlings, material, and workmanship shall be at least equivalent to the requirements of ABS or other recognized classification society. Repair as original, 2' x 6" inset on headlog to the satisfaction of attending USCG marine inspector prior to loading cargo.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2020
Resolved 25 August 2020
Resolution: Examined repairs to headlog and witnessed satisfactory air test at 1.0 PSI.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 17 December 2018
Resolved
Fracture on #4 stbd wing void
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 11 January 2019
Resolution: Sector Houston-Galveston Marine Inspectors observed the repairs were satisfactory. PTP Cleared.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 17 December 2018
Resolved
8" inset over 1.5'x2'
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 11 November 2019
Resolution: Sector Houston MI observed that repairs were satisfactory.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 23 October 2015
Resolved
Cargo stripping pump was removed.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 23 December 2015
Resolved 4 December 2015
Resolution: New drawings approved by MSC. Verified vessel has proper flanges installed.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 18 July 2013
Resolved
Vessel's alarm panel is located in hazardous zone. [name withheld] Project Manager at Conrad Aluminum proposed to fabricate bracket to move the alarm panel 12" forward and supply 2" pipe and fittings to move stripping flanges aft 3' to 4' to comply with 46CFR111.105-31(l).
Modifications are to be made prior to or at first annual inspection.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 July 2014
Resolved 22 May 2014
Resolution: Alarm panel changed to intrinsically safe junction box according to MSC approval letter E2-1303946 dated 22 Nov 2013.