Records from 2016 to 2026. Most recent: inspection, 14 May 2026.
Documentation record
Registered dimensions (L × B × D)57.0 ft × 26.0 ft × 9.0 ft
Registered tonnagegross 112 / net 89
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderA&B INDUSTRIES OF MORGAN CITY INC · AMELIA, LA, UNITED STATES · built 2015
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeBox
Hull configurationMonohull
Hailing portPORT ARTHUR, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 14 March 2026 · expires 31 March 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it112 - Simplified, Gross Ton
89 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 14
14 May 2026
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8372914
3 February 2025
COI Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8073564
28 February 2024
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7871507
2 October 2023
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7801891
13 January 2023
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7621153
1 April 2022
Type not recorded
No type recorded · Station Sabine · USCG Heartland District (CGD-H) · Activity 7424013
21 February 2022
Type not recorded
No type recorded · Station Sabine · USCG Heartland District (CGD-H) · Activity 7400172
22 July 2020
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7013471
8 January 2020
COI Inspection · Initial Certification · Administrative Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6903246
22 November 2019
TPO Audit
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6860551
17 December 2018
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6632444
3 December 2018
Type not recorded
No type recorded · Station Sabine · USCG Heartland District (CGD-H) · Activity 6592528
26 July 2016
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5953966
23 March 2016
Industry Initiated Exam · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5839248
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 7 February 2020
Resolved
Vessel had a sump pump in the area under their shaft seals that would automatically discharge overboard. That space was connected to under engine bilge via weep holes potentially allowing oil to discharge directly overboard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2020
Resolved 26 February 2020
Resolution: Vessel rendered port and stbd sump pumps non-automatic, and filled weep holes to bilge to the satisfaction of the attending Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 February 2020
Resolved
Vessel was unable to demonstrate setting of relief valves on pressure vessels.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2020
Resolved 26 February 2020
Resolution: Vessel provided appropriate documentation to the satisfaction of the attending Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 February 2020
Resolved
Wiring in engine room not properly terminated. Loose sensor wires hanging in bilge area near rotating machinery. Wires connected with wire nuts without being properly secured.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2020
Resolved 26 February 2020
Resolution: Vessel eliminated dead end wires, and properly arranged all others to the satisfaction of the attending Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 February 2020
Resolved
Lagging missing or not properly installed on generator turbos, generator exhaust manifolds, and main engine turbos.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2020
Resolved 26 February 2020
Resolution: Exhaust system was found acceptable to the attending Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 February 2020
Resolved
main engine exhaust ivo port side stack shows evidence of an exhaust leak.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2020
Resolved 26 February 2020
Resolution: Exhaust system was found acceptable to the attending Marine Inspector.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 7 February 2020
Resolved
All watertight doors on main deck need gaskets replaced/doors adjusted to be watertight.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2020
Resolved 26 February 2020
Resolution: Vessel replaced watertight door gaskets to the satisfaction of the attending Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 7 February 2020
Resolved
Aux generators are not equipped with RPM gauges at local location.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2020
Resolved 26 February 2020
Resolution: Vessel's crew learned, and demonstrated how to display engine rpm on the electrical generator engine's local computer display to the satisfaction of the attending Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 7 February 2020
Resolved
Hydraulic steering system not equiped with local gauge to indicate system pressure.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2020
Resolved 26 February 2020
Resolution: Vessel outfitted the hydraulic steering system with a local pressure gauge to the satisfaction of the attending Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 February 2020
Resolved
a unmounted 10b fire extinguisher with located near the portable flammable storage locker instead of the required 40b mounted near this location.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2020
Resolved 26 February 2020
Resolution: Vessel properly installed the appropriate size fire extinguisher on the paint locker to the satisfaction of the attending Marine Inspector.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 7 February 2020
Resolved
Employee assistance telephone number was not posted.
Action required: 10 - Deficiency Rectified
Due 21 February 2020
Resolved 7 February 2020
Resolution: EAP sign posted in crew area.