Records from 2013 to 2025. Most recent: inspection, 18 February 2025.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 50.0 ft × 13.0 ft
Registered tonnagegross 1,624 / net 1,624
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCONRAD ORANGE SHIPYARD INC · ORANGE, TX, UNITED STATES · built 2013
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portHOUMA, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 16 July 2026 · expires 31 August 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1624 - Simplified, Gross Ton
1624 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 20
18 February 2025
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8080995
20 September 2024
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8005118
13 September 2024
Damage Survey · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8001769
6 December 2023
Administrative Inspection · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7821946
13 November 2023
Internal Structural Exam · Drydock Exam · Cargo Tank Internal
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7823873
19 June 2019
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7148015
2 October 2018
Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6552973
11 September 2018
Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6534953
2 August 2017
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6228738
28 November 2016
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6048802
22 November 2016
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6046255
18 November 2016
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6043360
3 September 2015
Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5234034
18 August 2015
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5227804
17 August 2015
Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5227892
3 November 2014
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5017216
16 October 2014
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5006631
14 July 2014
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4973695
3 December 2013
Type not recorded
No type recorded · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 4769807
4 September 2013
Internal Structural Exam · Drydock Exam · Initial Certification · MTSA Verification · Construction Oversight · Cargo Tank Internal
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4739789
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 13 September 2024
Resolved
Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams, and testing of tanks shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society.
Crew discovered pinhole leak in prime mover fuel return line. Splash Zone epoxy and pipe wrap applied to arrest leak.
Vessel is authorized one time transit to reception facility in Beaumont, TX then immediate transit to nearest shipyard in Port Arthur, TX for permanent repairs to the satisfaction of a Coast Guard Marine Inspector.
46 CFR 32.60-1
705 C
Action required: 705 - Other - as specified
Resolved 20 September 2024
Resolution: Cleared to the satisfaction of the MI.
Construction/Loadline › Hull › Hull Plating
Issued 23 November 2016
Resolved
Crop and renew gunwale on #1 Port wing void approx. 6' x 3'.
Due 6 January 2017
Resolved 28 November 2016
Resolution: Cropped and renewed one #1 Port Wing Tank Gunwale- 3'-6" x 6'-0" and #2 Starboard Wing Tank Gunwale- 3'-6" x 7'-0". Conducted a visual exam of all repairs and witnessed air test at 1 PSI. Test satisfactory.
Construction/Loadline › Hull › Hull Plating
Issued 23 November 2016
Resolved
Crop and renew gunwale on #2 Starboard wing void approx. 7' x 3'.
Action required: 705 - Other - as specified
Due 6 January 2017
Resolved 28 November 2016
Resolution: Cropped and renewed one #1 Port Wing Tank Gunwale- 3'-6" x 6'-0" and #2 Starboard Wing Tank Gunwale- 3'-6" x 7'-0". Conducted a visual exam of all repairs and witnessed air test at 1 PSI. Test satisfactory.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 16 October 2014
Resolved
Each vessel vapor connection flange face must have a permanent attached stud at the top of the flange. The vessel vapor control 1 inch flange was not permanently attached. Cite 46CFR 39.2001(j). Due Date 16Nov2014
Action required: 705 - Other - as specified
Due 16 November 2014
Resolved 3 November 2014
Resolution: Vapor studs welded to vapor header flange.
Construction/Loadline › Structures › Superstructure
Issued 16 October 2014
Resolved
No extensive alterations involving the safety of a tank vessel either in regard to hull, or machinery shall be made without the approval of the Commandant. Vessel installed PIC shack on deck without USCG approval. Cite 46CFR 31.10-25
Action required: 705 - Other - as specified
Due 16 November 2014
Resolved 3 November 2014
Resolution: Removed PIC shack and stowage shed from vessel.