Records from 2013 to 2026. Most recent: inspection, 10 February 2026.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 50.0 ft × 13.0 ft
Registered tonnagegross 1,624 / net 1,624
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCONRAD ORANGE SHIPYARD INC · ORANGE, TX, UNITED STATES · built 2013
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portHOUMA, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 16 July 2026 · expires 31 August 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1624 - Simplified, Gross Ton
1624 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 23
10 February 2026
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8308735
3 November 2023
COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7820012
25 October 2023
Internal Structural Exam · Drydock Exam · Cargo Tank Internal
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7815008
29 November 2022
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7623047
3 December 2019
Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6866184
19 June 2019
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7148015
2 October 2018
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6552957
11 September 2018
Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6534944
2 August 2017
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6228723
28 November 2016
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6048795
23 November 2016
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6046488
18 November 2016
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6043357
3 September 2015
Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5234322
3 September 2015
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5718664
18 August 2015
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5227804
17 August 2015
Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5227872
29 June 2015
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5168174
2 June 2015
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5142548
28 May 2015
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5137149
19 May 2015
Annual Inspection · Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5130263
3 November 2014
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5017196
16 October 2014
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5006613
3 December 2013
Type not recorded
No type recorded · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 4769807
Construction/Loadline › Hull › Side Shell
Issued 23 November 2016
Resolved
01 inset identified on #5 Port Void Deck Gunwhale (4' X 3'6")
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 6 January 2017
Resolved 28 November 2016
Resolution: Cropped and renewed one #5 Port Wing Tank Gunwale- 3'-6" x 4'-0". Conducted a visual exam of all repairs and witnessed air test at 1 PSI. Test satisfactory.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 2 June 2015
Resolved
Navigation lights found to have exposed electrical wire in class one div one zone. (Prior to conducting off-load)
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 July 2015
Resolved 29 June 2015
Resolution: Cenac replaced the chartered UTV with one of their own UTVs that carry nav lights for the barge.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 2 June 2015
Resolved
Portable fire extinguishers passed due on servicing. (Prior to off loading cargo)
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 July 2015
Resolved 29 June 2015
Resolution: Cenac replaced the chartered UTV with one of their own which carries valid extinguishers for the barge.
Operations/Management › Cargo Transfer/Lightering › Use of Vapor Control System
Issued 2 June 2015
Resolved
Vaper Control alingment Stud missing. (Prior to conducting on load operation)
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 June 2015
Resolved 29 June 2015
Resolution: new spool piece placed on the manifold with attached stud.
Construction/Loadline › Hull › Hull Plating
Issued 19 May 2015
Resolved
Found puncture in hull IWO port stern, approximately 4in X 2in. Complete permanent repairs to the satisfaction of attending CG inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 June 2015
Resolved 28 May 2015
Resolution: 2'' x 2'' x 3/4" steel renewed IWO port stern quarter. Air tested to appx 2 psi, all sat. Deficiency cleared.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 16 October 2014
Resolved
Each vessel vapor connection flange face must have a permanent attached stud at the top of the flange. The vessel vapor control 1 inch flange was not permanently attached. Cite 46CFR 39.2001(j). Due Date 16Nov2014
Action required: 705 - Other - as specified
Due 16 November 2014
Resolved 3 November 2014
Resolution: Vapor studs welded.
Deck/Cargo › Towing › Winch
Issued 16 October 2014
Resolved
The owner, managing operator, master and person in charge shall ensure that every tank barge in the tow is properly secure within the tow. Vessel facing wire was not properly splice or secure. Cite 46CFR 35.05-15(ii). Due Date 16Nov2014
Action required: 705 - Other - as specified
Due 16 November 2014
Resolved 3 November 2014
Resolution: Replaced facing wire.
Construction/Loadline › Structures › Superstructure
Issued 16 October 2014
Resolved
Vessel access ladder by number 1 starboard side tank was damaged. Due Date 16Nov2014
Action required: 705 - Other - as specified
Due 16 November 2014
Resolved 3 November 2014
Resolution: Replaced hand rail on cargo tank ladder.
Construction/Loadline › Structures › Superstructure
Issued 16 October 2014
Resolved
No extensive alterations involving the safety of a tank vessel either in regard to hull, or machinery shall be made without the approval of the Commandant. Vessel installed PIC shack on deck without USCG approval. Cite 46CFR 31.10-25
Action required: 705 - Other - as specified
Due 16 November 2014
Resolved 3 November 2014
Resolution: PIC shack and stowage shed were removed from vessel.