Records from 2014 to 2025. Most recent: inspection, 23 October 2025.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderLAD SERVICES OF LOUISIANA LLC · BALDWIN, LA, UNITED STATES · built 2014
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portMORGAN CITY, LA
Trade endorsementsCoastwise, unrestricted, Registry, non-fishing vessel
DocumentationValid · issued 15 January 2026 · expires 28 February 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 18
23 October 2025
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8261469
9 October 2025
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8249882
23 December 2024
Deficiency Check · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8048606
25 May 2023
COI Inspection · Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7696565
12 June 2022
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7491337
2 June 2022
Periodic Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7466185
19 May 2021
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7201158
13 May 2021
Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7195989
14 July 2020
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7005110
5 April 2020
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6935823
6 May 2019
COI Inspection · MTSA Verification · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6676407
5 April 2019
Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6656840
4 April 2018
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6385256
19 May 2017
Periodic Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6150083
7 September 2016
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5990298
22 March 2016
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5835422
11 August 2015
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5212885
5 August 2014
Administrative Inspection · Internal Structural Exam · Construction Oversight · Damage Survey · Hull Examination · Initial Certification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4945018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 December 2024
Resolved
MI observed severed throttle and break cables at the cargo pump engine.
Condition: Damaged By Earlier Event
Action required: 15 - Rectify deficiencies by next port
Due 6 January 2025
Resolved 26 December 2024
Resolution: Photo evidence of Cable Replacement.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 23 December 2024
Resolved
Reach rod packing gland is leaking.
Condition: Damaged By Earlier Event
Action required: 15 - Rectify deficiencies by next port
Due 6 January 2025
Resolved 26 December 2024
Resolution: Photo evidence of Packing gland reseal.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 13 May 2021
Resolved
The vessel's VCS PRIS identifies the installed PV valve to be a Bergan TOPSAFE SUPER ISO 150 6 valve with Coast Guard Approval 161.017/181/01 with a pressure side rating of 1.43 psig. The PV valve currently installed on the vessel is an ERL PV Valve with pressure side rating of 1.5 psig.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 May 2021
Resolution: Vessel procured and installed correct p/v valve as per approved VCS PRIS.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › On board programme for the prevention of occupational injuries and deaseases
Issued 13 May 2021
Resolved
No Benzene monitoring documentation available onboard for inspection.
Action required: 10 - Deficiency Rectified
Resolved 13 May 2021
Resolution: Vessel rep provided documentation of Benzene monitoring program prior to departure of inspection team.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 May 2021
Resolved
Vessel's independent diesel tank vent pipe is outfitted with plastic retention collar for flame screen.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 May 2021
Resolution: Vessel installed flame screen with metallic band clamp.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead strength
Issued 5 April 2019
Resolved
The regulations in this sub-chapter contain requirements for materials, design, construction, inspection, manning, and operation of tank vessels, including handling and stowage of cargo and duties of officers and crew. Vessel sustained damage on gunnel and forward hatch of the port side #5 void. Vessel is required to repair the damage after discharge of current cargo.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2019
Resolved 8 May 2019
Resolution: Vessel made repairs IAW ABS standards. Satisfactory air test conducted.
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 5 August 2014
Resolved
Cut out and insert plate where cargo sump error occurred Cl FR 36 to FR 29
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 September 2014
Resolution: new inserts for the for the tank sumps, all sat.
Construction/Loadline › Hull › Weld
Issued 5 August 2014
Resolved
Provide approved repair procedure for transverse weld seam excessive root opening on stern box.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 October 2014
Resolution: LAD Balwin has received an approved welding procedure for use of an backing strip and qualified welders in that procedure and have completed the welding on stern box.
Construction/Loadline › Hull › Side Shell
Issued 5 August 2014
Resolved
Cut out and insert plate on port side deck due to improper root opening near FR 27
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 September 2014