Records from 2012 to 2026. Most recent: inspection, 26 March 2026.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCONRAD SHIPYARD LLC · MORGAN CITY, LA, UNITED STATES · built 2012
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portMORGAN CITY, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 15 January 2026 · expires 28 February 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 27
26 March 2026
Annual Inspection · Administrative Inspection · Vessel Attendance
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8331419
16 May 2025
Periodic Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8137682
3 April 2024
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7888320
31 March 2023
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7659006
28 June 2022
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7485982
12 June 2022
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7491337
4 May 2022
Hull Examination · Examination of Repairs · COI Inspection · Internal Structural Exam · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7424322
3 December 2021
COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7361694
22 August 2019
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6791285
19 August 2019
Administrative Inspection · SIP Initial Entry
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6788569
22 February 2018
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6359547
22 March 2017
MTSA Verification · Drydock Exam · Examination of Repairs · COI Inspection · Cargo Tank Internal
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6109426
21 February 2017
Administrative Inspection · Damage Survey · Internal Structural Exam · Permit to Proceed
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6091777
19 May 2016
Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5881135
11 August 2015
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5212966
14 July 2015
Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5184513
16 June 2015
Examination of Repairs · MTSA Verification · Periodic Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5168763
13 May 2015
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 5124582
5 October 2014
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4999867
1 May 2014
Annual Inspection · MTSA Verification · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4846677
28 April 2014
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4846075
13 August 2013
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4684228
13 August 2013
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4690912
10 December 2012
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4499480
2 November 2012
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4477200
9 May 2012
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4306638
16 March 2012
Initial Certification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4265156
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 26 March 2026
Resolved
Piping systems used where the fluid temperature exceeds 150 °F must be suitably insulated as necessary to preclude injury to personnel.
Prime mover exhaust pipe did not have protective material to prevent injury from hot surfaces. Install protective heat resistant material on exhaust piping to satisfaction of MI.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 April 2026
Resolved 8 April 2026
Resolution: Lagging installed on exhaust pipe.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 16 May 2025
Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7 millimeter (0.5 inch) diameter and is at least 25.4 millimeters (1 inch) long. It must be located at the top of the flange face, midway between boltholes, and in line with the bolthole pattern.
Vessel was found to have no flange stud on the port vapor manifold.
46CFR39.2000(j)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 June 2025
Resolved 23 May 2025
Resolution: New flange stud installed.
Deck/Cargo › Vapor Control Systems › Flame Screens
Issued 5 May 2017
Resolved
Flame screen on the VCS header was found completely caked with rust.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 June 2017
Resolved 11 May 2017
Resolution: [name withheld] sufficient evidence to clear discrepancy. New flame screen installed.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 5 May 2017
Resolved
Engine exhaust pipe and lagging found corroded and inoperable.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 June 2017
Resolved 11 May 2017
Resolution: [name withheld] sufficient evidence to clear discrepancy. New exhaust pipe and lagging installed.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 5 May 2017
Resolved
Pressure side of the P/V valve failed to re-seat properly on the pressure side.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 June 2017
Resolved 11 May 2017
Resolution: [name withheld] sufficient evidence to clear discrepancy. Verified operation of PV Valve.
Construction/Loadline › Hull › Bottom Plating
Issued 24 February 2017
Resolved
Due to the extensive damage found during the internal structural exam the barge was found not fit for route and service. The barge shall not depart 3 mile dry dock until Mobile OCMI receives a full survey report and repair proposal.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 June 2017
Resolution: Vessel was granted PTP in March to come to NOLA for repairs. Repairs completed and approved through course of inspection activities w/ Act # 6109426. Def cleared as part of ADMIN during Activity validation & close out.
Construction/Loadline › Hull › Hull Plating
Issued 2 November 2012
Resolved
A 4+" inset is located on the #3 Port W/T along the gunnel and side shell directly under walking deck. Permenant repairs are to be made by 17DEC2012.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 December 2012
Resolved 10 December 2012
Resolution: Croped and renewed (1) 9'' x 4'' x 3/8" deck gunwale #3 port wing tank. (1) 9'' x 4'' x 3/8" side shell insert #3 wing tank. air tested repairs